  RH-Meson Hall, Page 15 of 19  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tuesday, June 04, 2013, 13:42, Isaac Earle, Repair, Target 1, Target, T1 and T2 Power Supply Fans Replaced 
Entry  Friday, May 31, 2013, 16:07, Isaac Earle, Repair, Target 1, Target, Power Supply Fan Failure IMG_1440.JPGIMG_1441.JPGIMG_1442.JPG
Entry  Tuesday, May 14, 2013, 13:26, Isaac Earle, Development, Target 1, Target, T1 & T2 Profile Scan 
Entry  Friday, April 19, 2013, 09:55, Isaac Earle, Development, Target 1, Cooling, T1&T2 cooling package safety/standards compliance upgrade complete (SASP0120) 
Entry  Wednesday, April 17, 2013, 16:45, Isaac Earle, Standard Operation, Target 1, Target, T1-MK1 Target Leak Checked 
Entry  Wednesday, April 17, 2013, 16:43, Isaac Earle, Standard Operation, Target 2, Target, T2 target installed; Vacuum leak-tight; Monitors OK; T2 ready for beam 
Entry  Friday, April 12, 2013, 17:33, Isaac Earle, Development, Target 1, Cooling, T1 & T2 high-temp limit switch installation, wiring, and commissioning complete 
Entry  Friday, April 12, 2013, 13:28, Isaac Earle, Standard Operation, Target 1, Cooling, Cooling Packages Leak Tight 
Entry  Tuesday, April 09, 2013, 17:06, Isaac Earle, Repair, Target 1, Target, T1 Target Electronics Check 
Entry  Tuesday, March 26, 2013, 10:55, Isaac Earle, Maintenance, Target 1, Target, T1-MK1 Re-wiring and MRO Complete T1-MK1_Tgt_leak_check.PDF
Entry  Monday, March 18, 2013, 15:17, Isaac Earle, Maintenance, Target 2, Target, T2-MK2 Target Maintenance and Re-Wiring IMG_1189.JPGIMG_1194.JPGIMG_1197.JPGIMG_1207.JPGT2-MK2_Tgt_leak_check.PDF
Entry  Wednesday, March 06, 2013, 12:13, Isaac Earle, Maintenance, Target 2, Cooling, T2 Heat Exchanger MRO 7x
Entry  Tuesday, February 05, 2013, 09:50, Isaac Earle, Maintenance, Target 2, Target, T2-MK2 target moved from beam line to hot cell IMG_0868.JPG
Entry  Tuesday, January 29, 2013, 15:55, Isaac Earle, Maintenance, Target 2, Cooling, T2 H.E. Transported to Warm Cell IMG_0860.JPGIMG_0864.JPG
Entry  Monday, January 21, 2013, 16:18, Isaac Earle, Standard Operation, Target 2, Target, T2 Cooling Package Water Released 
Entry  Monday, January 21, 2013, 11:57, Isaac Earle, Repair, Target 2, Target, Flask Repair IMG_0818.JPGIMG_0824.JPGIMG_0836.JPGIMG_0838.JPG
Entry  Monday, January 14, 2013, 16:55, Isaac Earle, Standard Operation, Target 2, Target, Target Move & Damaged Profile Monitor 
Entry  Friday, January 11, 2013, 15:48, Isaac Earle, Standard Operation, Target 1, Target, BL1A Tunnel Accessed IMG_0801.JPGIMG_0802.JPG
Entry  Tuesday, January 08, 2013, 10:52, Isaac Earle, Maintenance, Target 2, Target, T2-MK1 Target Maintenance 
Entry  Tuesday, January 08, 2013, 09:27, Isaac Earle, Standard Operation, Target 2, Target, BL1A Air Amplifier turned off for duration of shutdown. 