  167   Wednesday, July 15, 2015, 10:33 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling System Check- All T1 and T2 values on XTPAGE were stripped
back to April 1, 2015:  All systems
appear to be functioning normally, nothing
  
  185   Monday, January 18, 2016, 17:19 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Packages Drained; BL1A Holding Tank Released The T1 and T2 cooling packages were
drained to the BL1A holding tank on Jan 8
2016.  The volumes were 100L and 80L
  
  186   Monday, January 25, 2016, 16:54 Isaac EarleMaintenanceTarget 1CoolingT1 MRO WorkThe following work was performed at the
T1 cooling package and target between January
18-21, 2016:
  
  187   Wednesday, February 03, 2016, 17:35 Isaac EarleStandard OperationTarget 2CoolingT2 MRO WorkThe following work was performed at the
T2 cooling package and target between Jan
25 - Feb 3, 2016:
  
  209   Friday, September 30, 2016, 16:59 Isaac EarleRepairTarget 1CoolingT1 Cooling System Inlet Pressure Transducer Replaced The T1 cooling system inlet pressure
transducer (EPICS ID: B1A:T1CS:PGIN,  Omega
part # PX315-100GI) began failing in August
  
  211   Thursday, November 17, 2016, 17:58 Isaac EarleRepairTarget 2CoolingT2 Heat Exchanger Secondary Side Solenoid Valve Failure At approximately 11am today the T2
cooling package heat exchanger secondary
side water flow suddenly dropped from ~11gpm
  
  214   Thursday, January 19, 2017, 08:55 Isaac EarleStandard OperationTarget 1CoolingT1 MRO work completeThe following work was completed on
the T1 cooling package:
- water drained to BL1A holding
  
  216   Monday, March 27, 2017, 16:15 Isaac EarleRepairTarget 1CoolingT1 Cooling System Target Water Return Hose DamagedThe 18' shielding block which lies west
of the T1 cooling package was removed on
Friday Mar 24 so that vacuum equipment could
 IMG_8077.JPGIMG_8076.JPG 
  219   Tuesday, April 11, 2017, 17:02 Isaac EarleMaintenanceTarget 2CoolingT2 Cooling System MRO The following work has been completed
on the T2 cooling package:
- T2 system drained to South TNF
  
  222   Tuesday, May 09, 2017, 16:35 Isaac EarleRepairTarget 2CoolingT2 target water flow gauge paddle wheel changed During the target move on Thursday
May 4th the paddle wheel and paddle wheel
shaft for the T2CS:FGTGT sensor were changed
 T2CS_FGTGT_strip.jpg 
  225   Tuesday, July 25, 2017, 19:23 Isaac EarleRepairTarget 2CoolingT2 Heat Exchanger Secondary Side Solenoid Valve Failure (again) At approximately 13:50 today the
T2 cooling system secondary side solenoid
valve (T2CS:SVSEC) failed to a closed position.
  
  226   Thursday, July 27, 2017, 08:57 Isaac EarleOtherTarget 2CoolingFailed T2CS:SVSEC valves investigation The three failed T2 cooling system
secondary side solenoid valves were tested
yesterday to try to determine the problem.
  
  230   Thursday, October 26, 2017, 16:12 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve replaced Around 10pm on Sunday Oct 22 beam
was tripped multiple times due to low flow
for the T1 collimator cooling circuit (B1A:T1:FGCOL). 
  
  236   Tuesday, April 10, 2018, 11:20 Isaac EarleMaintenanceOtherCoolingT1 and T2 cooling package shutdown MRO work The following work was performed
on the T1 and T2 cooling packages during
the 2018 shutdown:
  
  239   Friday, June 01, 2018, 17:50 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve coil replacedFlow stopped through the T1 collimator
cooling loop around the same time as a power
bump this afternoon.  The problem was
  
  240   Tuesday, July 03, 2018, 11:09 Isaac EarleRepairTarget 1CoolingT1 cooling package outlet water pressure sensor replaced The T1 cooling package outlet water
pressure sensor (B1A:T1CS:PGOUT) was replaced
this morning with a new unit.  Over
  
  241   Monday, July 23, 2018, 09:39 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve failed - Solenoid replacedOn Saturday July 21st the T1 Collimator
solenoid valve would not re-open after tripping
closed due to a (planned) loss of vacuum. 
  
  242   Thursday, August 23, 2018, 11:52 Isaac EarleRepairTarget 1CoolingT1 cooling package pump failure and replacementOn Wednesday August 15th the T1 cooling
package tripped off, and could not be restarted. 
On the EPICS screen the pump device went
 TUS1801057_Triumf.pdf 
  244   Thursday, September 06, 2018, 13:49 Isaac EarleRepairTarget 1CoolingT1 cooling package secondary side solenoid failed On Friday Aug 31 at approximately
3am T1CS:FGSEC dropped to 0gpm flow. 
This was confirmed to be a real reading when
  
  247   Thursday, January 10, 2019, 13:51 Isaac EarleMaintenanceTarget 1CoolingT1 and T2 cooling packages inspectedThe T1 and T2 cooling packages were inspected
today while running.  No water leaks
were observed at either package including
  