  2269   Wednesday, November 17, 2021, 11:42 Travis CaveSpent Target VaultStandard Operation Ta#57Repacking of the targets. Ta#57 was repacked and placed in
the mini vault. The pail was changed from
#174 to #263. See attached PDF for more details.
 Target_Index_2021-11-17.pdfTarget_Index_2021-11-17_mini_vault.pdf 
  2270   Thursday, November 18, 2021, 09:47 Travis CaveSpent Target VaultStandard Operation SiC#38 and UC#29Spent Target Move The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached
 Target_Index_2021-11-18.pdfTarget_Index_2021-11-18_mini_vault.pdf 
  2278   Friday, November 26, 2021, 10:52 Adam NewsomeSpent Target VaultStandard Operation UC#35Spent Target MoveThe spent UC#35 target has been moved from
the south hot cell to the  spent target vault.
It was placed in pail #264 and put in spot
 Target_Index_2021-11-26.pdf 
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2290   Wednesday, January 12, 2022, 14:09 Travis CaveSpent Target VaultStandard Operation UC#36Spent Target Move The spent UC#36 target in the north
hot cell has been removed and placed in the
spent target vault. See attached PDF for
 Target_Index_2022-01-12.pdf 
  2297   Thursday, January 20, 2022, 11:09 Travis CaveSpent Target VaultStandard Operation Ta#63Spent Target MoveThe spent Ta#63 has been moved from the north
hot cell to the spent target vault. It was
place in pail#266 and 
 Target_Index_2022-01-20.pdf 
  2302   Thursday, February 10, 2022, 11:45 David WangSpent Target VaultStandard Operation UCx#33.Spent target UCx #33 has been repacked with a new pail and lid in NHC. Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot
  
  2307   Thursday, February 17, 2022, 13:24 David WangSpent Target VaultMaintenance UCx #34Repackage of UCx #34in NHC.UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive
  
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
  2319   Wednesday, May 11, 2022, 16:15 Nadia JorgensonSpent Target VaultStandard Operation  Emergency Close Mechanism Test The emergency close
mechanism for the Storage Vault door was
  
  2320   Wednesday, May 11, 2022, 16:29 Nadia JorgensonSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault An
inspection was performed on drive systems
for the main storage vault by Dan McDonald,
 Motor_wiring_ISAC_storage_vault.jpg 
  2322   Thursday, May 19, 2022, 11:42 Travis CaveSpent Target VaultStandard Operation Sic#39, Ta#59, C#2, UC# 32 & 30Targets moved to the mini vault. Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached
 Target_Index_2022-05-19.pdfMini_Vault_Target_Index_2022-05-19.pdf 
  2324   Wednesday, May 25, 2022, 10:23 Nadia JorgensonSpent Target VaultRepair  F-308 Loading, Mini-Storage Vault Failure5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the
  
  2339   Thursday, June 23, 2022, 10:22 Travis CaveSpent Target VaultStandard Operation UC#37Spent Target Move UC#37 was placed in pail #228 and
place in spot 1B it was removed the north
hot cell. See attached PDF for more details
 Target_Index_2022-06-23.pdf 
  2344   Monday, July 04, 2022, 11:54 Nadia JorgensonSpent Target VaultMaintenance  Added Lubrication,fittings need to be changedDan lubricated components on the target
storage vault (This was an outstand task
from annual inspection). No issues on the
 Mini_Vault_Grease_Fitting.jpg 
  2345   Wednesday, July 06, 2022, 10:30 Travis CaveSpent Target VaultStandard Operation SiC#42Spent Target Move The spent SiC#42 was moved from the
north hot cell to the spent target vault,
it was placed in pail #271 and put in spot
 Target_Index_2022-07-06.pdf 
  2351   Thursday, July 28, 2022, 10:47 Travis CaveSpent Target VaultStandard Operation SiC#43Spent Target Move The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See
 Target_Index_2022-07-28.pdf 
  2357   Thursday, August 18, 2022, 10:13 Travis CaveSpent Target VaultStandard Operation Ta#64Spent Target Move The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C
 Target_Index_2022-08-18.pdf 
  2366   Wednesday, September 14, 2022, 13:45 Adam NewsomeSpent Target VaultDevelopment  Storage Vault: cable replaced and e-chain upgradeThe motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran
 PXL_20220914_183329159.jpg 