1444
|
Monday, March 06, 2017, 08:01 |
David Wang | Cooling | Repair | | | HALCW resin tank replacement. | HALCW resin tank has been replaced. The
old tank is stored in middle-west silo now.
The field on old resin tank bottom is about |
11x |
2038
|
Thursday, January 02, 2020, 09:55 |
David Wang | Cooling | Standard Operation | | | I turned on HALC water pump MP2. | HALCW MP2 is switched onnow. There is a
small amount of air trapped in system. The
pump works fine. Water level and system |
|
2041
|
Tuesday, January 07, 2020, 08:02 |
David Wang | Cooling | Standard Operation | | | Switch on HALCW MP2 | HALCW MP2 is switched on this morning after
yesterday cooling tower maintenance. LALCW
P5 and P6 pumps are started by isac operator |
|
2052
|
Monday, January 27, 2020, 10:40 |
David Wang | Cooling | Maintenance | | | ITE/ITW supply water presuure on dump circuits. | With both stations in operation,ITE dump
supply gauge reading is 27 psi. ITW is 20
Psi. I adjusted ITW dump pressure to |
|
2092
|
Wednesday, May 20, 2020, 13:08 |
David Wang | Cooling | Standard Operation | | | Start of HALCW sysytem | High active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and |
|
2183
|
Wednesday, January 27, 2021, 14:30 |
David Wang | Cooling | Development | | | High active water system purging | High active water are purged to holding
tank at B2 level. There should be around
48 gallons are purged out of system. No purging |
|
2207
|
Monday, April 12, 2021, 13:45 |
Anders Mjos | Cooling | Maintenance | | | New T installed for instrumentation loop on HALCW system | Adrian and co installed a new T to be able
to add an instrument loop for O2 and pH monitoring
on the low conductivity water systtem (photo). |
|
2211
|
Wednesday, April 21, 2021, 11:18 |
David Wang | Cooling | Maintenance | | | Refilling high active wtaer system and starting HA water pumps. | High active water system is refilled. Air
are drained out of system before pump
to be started. Following sequence are used |
|
2305
|
Tuesday, February 15, 2022, 11:18 |
Frank Song | Cooling | Repair | | | Replace 2 leak valves on high active water system | The valves #V10 & V11 beside
high active water pumps were replaced in
Target Hall, pics attached. |
|
2306
|
Wednesday, February 16, 2022, 15:19 |
Frank Song | Cooling | Repair | | | high active cooling water valves repaired/replaced | A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD |
|
2419
|
Wednesday, March 01, 2023, 09:27 |
David Wang | Cooling | Maintenance | | | Two filters on HALCW resin circuit have been replaced. | Two filters on HALCW resin circuit have
been replaced. O-ring 235# were changed on
both filter cartridge houses. 25micron |
|
2420
|
Wednesday, March 01, 2023, 09:34 |
David Wang | Cooling | Maintenance | | | Visual inspection of HALCW for possible small water leak or drip. | I visually inspected HALCW system including
water station section, both target pits,
and de-ionizer system. No small leak |
|
2424
|
Wednesday, March 08, 2023, 06:32 |
David Wang | Cooling | Maintenance | | | HALCW flow sensors replacement. | HALCW flow sensors replacement job is done.
All ITE/ITW(except ITE HS) return line water
flow sensors including paddle wheels and |
|
2425
|
Wednesday, March 08, 2023, 09:19 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 motor phase current measurement. | HALCW ITC:MP1/MP2 motor phase current measurement
is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A.
MP2: 17.9A/17.9A/17.3A. 19.5A |
|
2426
|
Wednesday, March 08, 2023, 13:57 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 pump and motor temerature measurements | HALCW ITC:MP1/MP2 pump and motor temperature
measurements result:
MP1: pump discharging port: |
|
2433
|
Monday, April 24, 2023, 10:18 |
David Wang | Cooling | Maintenance | | | HALCW flowmeter transmotters inspetion and calibration. | ITW, ITE, ITW +ITE total , and low active
cooling water return flow meter transmitters
are inspected and calibrated. Result: |
|
2495
|
Friday, October 13, 2023, 11:46 |
David Wang | Cooling | Maintenance | | | HALCW system O2 sensor service and calibration. | HALCW system O2 sensor service and calibration
were done in Sep 26th. electrolyte and membrane
on rose mount sensor 499ADO were refilled |
|
2547
|
Friday, February 16, 2024, 11:48 |
David Wang | Cooling | Maintenance | | | high active water transferr to holding tank | 100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding |
|
2559
|
Thursday, April 04, 2024, 13:10 |
David Wang | Cooling | Maintenance | | | high active water refurbishment, reinstallation, and test operation. | both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system |
|
2560
|
Monday, April 08, 2024, 09:29 |
David Wang | Cooling | Standard Operation | | | HALCW system general inspection. | water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves |
|