1238
|
Wednesday, May 18, 2016, 11:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | module moved | TM#1 with UC#15 has been moved from
the west target station to the south hot
cell. The target shield plug was also remotely |
|
|
1239
|
Thursday, May 19, 2016, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module moved | TM#1 has been moved from the south hot
cell to the north west silo. |
|
|
1478
|
Wednesday, April 05, 2017, 09:46 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved | TM#1 has been moved from the North West
silo to the conditioning station. |
|
|
1480
|
Wednesday, April 05, 2017, 14:13 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 and TCS vacuum system are connected together | I started two turbo-pumps on TM1 and one
small TP on TCS. They are work fine. |
|
|
1481
|
Thursday, April 06, 2017, 12:33 |
David Wang | Conditioning Station | Repair | TM1 | | TM1 rust inpsection and removal | TM1 inside service cap surface and shielding
plug surface are visually inspected yesterday.
No rust has been found. I cleaned all rust |
|
|
1484
|
Friday, April 07, 2017, 09:53 |
Travis Cave | Conditioning Station | Maintenance | TM1 | no target | Electrical Check and TM1 other checks | Results of an electrical check on TM#1
with no target attached to it.
I use this e-log entry for |
|
|
1485
|
Monday, April 10, 2017, 11:23 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the conditioning
station to the north west silo. There
was a slight delay in the move as the limits |
|
|
1679
|
Wednesday, January 17, 2018, 10:38 |
Anders Mjos | Spent Target Vault | Standard Operation | TM1 | | Old TM1 Source Tray moved to Cyclotron basement | The old TM1 Source Tray from 2011 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 10. The |
|
|
1682
|
Wednesday, January 24, 2018, 13:30 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 has been moved to TCS this morning | Tm1 has been moved to TCS this morning.
All turbo-pumps are started successfully
at TCS and TM1. |
|
|
1683
|
Monday, January 29, 2018, 06:51 |
David Wang | Conditioning Station | Maintenance | TM1 | | TCS and TM1 vacuum pumps switched off | TCS and Tm1 vacuum pumps are switched off
this morning. TM1 TP1and TP2 work fine during
this test period. Tm1 will be moved back |
|
|
1926
|
Wednesday, May 22, 2019, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the north
west silo to the conditioning station for
the day it will be moved back to the silo |
|
|
1928
|
Wednesday, May 22, 2019, 11:52 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 inpsection. | TM1 shielding plates and their holding
bolts are inspected. No corrosion.
TM1 is located at TCS now. Both TP1 and TP2 |
|
|
1929
|
Thursday, May 23, 2019, 08:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the south
hot cell to the northwest silo. |
|
|
13
|
Monday, July 25, 2011, 14:49 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35 | Spent target move | Ta#35, in pail #88, has been place into
spent target storage, in spot 6C. Upon removal
from the South Hot Cell it was 411mSv/hr |
|
|
27
|
Wednesday, September 14, 2011, 10:32 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#37 | Spent target move | Ta#37 has been moved from the south hot
cell into the storage vault. The target is
in pail #89 and in spot 6A in the vault. |
|
|
31
|
Thursday, September 29, 2011, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#36 | Spent target move | The spent Ta#36 has been moved to the storage
vault. It was placed in pail #90, and placed
into slot 3B, it was 111mSv/hr upon removal |
|
|
36
|
Wednesday, October 05, 2011, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#2 | Spent target move | The spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal |
|
|
49
|
Thursday, November 10, 2011, 14:33 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | For the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows: |
|
|
54
|
Thursday, November 17, 2011, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | TaC#1 | Spent target move | TaC#1 was moved from the south hot cell
to the storage vault. It was placed in pail#92
and put in vault slot 7B. It was 239mSv/hr |
|
|
64
|
Thursday, December 15, 2011, 13:08 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Spent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable |
|