1187
|
Friday, April 01, 2016, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#15 | module moved | TM#1 has been moved from the conditioning
station to the south hot cell, had UC#15
installed and then moved back to the conditioning |
|
1188
|
Friday, April 01, 2016, 14:41 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and TCS vacuum system has been connected. TCS control page white out. | I can not start the TCS pumps due to control
page white out. Control group is working
on this issue. |
|
1189
|
Monday, April 04, 2016, 11:14 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Helium pressure test on TM1 HS line at CS | New UCx target is installed on the module.
70psi helium,3 minutes. NO response on LD.
LD is pumped to bottom LR and LP during test. |
|
1190
|
Tuesday, April 05, 2016, 07:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#15 | stop CS vacuum pumps. | Stop TCS vacuum pumps . Preparing argon
venting on TM1 and TCS.
7:34 AM, Disconnected TM1 at TCS, |
|
1191
|
Tuesday, April 05, 2016, 09:33 |
Travis Cave | ITW | Standard Operation | TM1 | UC#15 | module moved | TM#1 with UC#15 have been moved from the
conditioning station to the west target station. |
|
1192
|
Tuesday, April 05, 2016, 12:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 vacuum system has been connected in ITW. | All turbo -pumps are started. |
|
1199
|
Friday, April 08, 2016, 07:13 |
David Wang | ITW | Standard Operation | TM1 | UCx15 | TM1 has been connected in ITW. | After ITW HV test is done, TM1 has been
connected to ITW. Water signals are checked
in electrical room. They are good. |
|
1212
|
Thursday, April 14, 2016, 12:56 |
David Wang | ITW | Standard Operation | TM1 | | 5 shielding blocks have been moved to ITW. | The ITW is configured to take proton beam. |
|
1234
|
Monday, May 16, 2016, 11:16 |
David Wang | ITW | Standard Operation | TM1 | | ITW, TM1 turbo-pumps are swithched off | I let isac opp switched off ITW turbo-pumps.
The argon vent valve in electrical room is
opened. The ITW argon venting will be started |
|
1236
|
Tuesday, May 17, 2016, 11:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | module moved | TM#1 has been moved from the west target
to the south hot cell. The target on TM#1
is UC#15. |
|
1237
|
Tuesday, May 17, 2016, 14:15 |
Travis Cave | ITW | Standard Operation | TM1 | UC#15 | module moved | TM#1 with UC#15 was moved back to the west
station due to alpha concerns. |
|
1238
|
Wednesday, May 18, 2016, 11:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | module moved | TM#1 with UC#15 has been moved from
the west target station to the south hot
cell. The target shield plug was also remotely |
|
1239
|
Thursday, May 19, 2016, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module moved | TM#1 has been moved from the south hot
cell to the north west silo. |
|
1478
|
Wednesday, April 05, 2017, 09:46 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved | TM#1 has been moved from the North West
silo to the conditioning station. |
|
1480
|
Wednesday, April 05, 2017, 14:13 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 and TCS vacuum system are connected together | I started two turbo-pumps on TM1 and one
small TP on TCS. They are work fine. |
|
1481
|
Thursday, April 06, 2017, 12:33 |
David Wang | Conditioning Station | Repair | TM1 | | TM1 rust inpsection and removal | TM1 inside service cap surface and shielding
plug surface are visually inspected yesterday.
No rust has been found. I cleaned all rust |
|
1484
|
Friday, April 07, 2017, 09:53 |
Travis Cave | Conditioning Station | Maintenance | TM1 | no target | Electrical Check and TM1 other checks | Results of an electrical check on TM#1
with no target attached to it.
I use this e-log entry for |
|
1485
|
Monday, April 10, 2017, 11:23 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the conditioning
station to the north west silo. There
was a slight delay in the move as the limits |
|
1679
|
Wednesday, January 17, 2018, 10:38 |
Anders Mjos | Spent Target Vault | Standard Operation | TM1 | | Old TM1 Source Tray moved to Cyclotron basement | The old TM1 Source Tray from 2011 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 10. The |
|
1682
|
Wednesday, January 24, 2018, 13:30 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 has been moved to TCS this morning | Tm1 has been moved to TCS this morning.
All turbo-pumps are started successfully
at TCS and TM1. |
|