Entry  Thursday, February 25, 2021, 10:09, Frank Song, ITE, Repair, , , Disconnect Entrance Module in ITE 

 David and I disconnected entrance module in ITE by following the procedure # 190510. And, the yoke was installed and left on for remote handling later. 

Entry  Thursday, March 11, 2021, 11:42, Frank Song, ITE, Maintenance, , , ITE water flow wheels and coils replacement. 

 ITE water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump, dump plug, 2A window, and tank return circuits are replaced with new parts.

Entry  Wednesday, March 17, 2021, 09:10, Travis Cave, ITE, Standard Operation, , , Entrance module move 

 The east entrance module is now back at the east target station.

Entry  Wednesday, March 17, 2021, 11:43, Frank Song, ITE, Repair, , , Re-connect Entrance Module in ITE  job_done_by_following_#190510.pdf

 David and I re-connect Entrance module at ITE after the monitor been replaced at SHC. 

Entry  Monday, May 03, 2021, 15:14, Frank Song, ITE, Maintenance, , , High voltage test in ITE 

 Anders and I prepared ITE high voltage test in April 30 ( Friday morning), The MAA is locked for this.

Entry  Monday, May 31, 2021, 11:28, David Wang, ITE, Standard Operation, TM4, , Remotely remove TM4 from silo to shc 

Remotely remove tm4 from silo to shc. The moving is smooth.

Entry  Thursday, June 03, 2021, 08:19, David Wang, ITE, Repair, TM4, UCX33, Replaced ITE TP4  

Replaced  ITE TP4 due to failure start. The new pump works fine.

Entry  Tuesday, July 20, 2021, 09:46, Adam Newsome, ITE, Standard Operation, TM4, , Remotely moved TM4 from TCS to ITE 

TM4 was moved from the conditioning station to the East target station.

Entry  Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62 
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.

 

A short between feedthroughs A and P developed at the end of the p2n run in this module, and was fixed by Chad prying apart the lines in the source tray with a long teflon bar. We did not take the containment box off to fix it properly for reasons of time and also potential damage to the containment box. This seemed to fix it and David measured around 13MOhms between A-P when the module was installed in ITE. To make sure we could recover if the short reappeared during the run, David did not connect the P/Q feedthrough to HV common on the module top as usual, but it was connected in the electrical room. I also unhooked the busbar from the coil power supply.

When trying to start the TGHT ramp up, it was discovered that ITE:TGHT had a fault in its readback circuit, which was showing negative voltages. Not sure how this happened, since the power supply was not used for the previous p2n run, maybe an HV spark? This supply was replaced with the spare (SN 1161-9894).

When TGHT and TBHT were able to be ramped up, we found that the tube heater voltage was increasing too much with the target current. Normally the rate of increase is about 0.0004 V per amp on TGHT. This time it was 0.004 V/A. This was causing the TBHT to be voltage limited, which I thought could be related to the AP short. So I re-wired it such that the P feedthrough (#7 in the electrical room) was disconnected from everything except it was tied to feedthrough A (#1) using a 100 Ohm resistor. This should prevent it from floating and also prevent current from going through. See documentation in the Target Records folder (https://documents.triumf.ca/docushare/dsweb/Get/Document-204373/July272021_ITETM4_electricalissues.pdf).

During the subsequent ramp up, the TGHT power supply tripped the breakers when it was at 500A, 8V. The cause of this is still uncertain, and the TBHT voltage issue persisted after the wiring change. In the interest of time we decided to stay conservative on the currents used and continue to run like this. It may also be possible that the copper block which is supposed to reference TBHT negative to HV common is not attached.

Finally ITE:EL is still not working. It shows a value on the front of the PSU but doesn't draw enough current and doesn't affect the beam. We are running without it and it will hopefully be fixed on the Aug. 4 maintenance day.

These electrical issues bear some resemblance to those with Ta61, but I don't think we ever determined the cause there.

Entry  Friday, July 30, 2021, 16:31, Carla Babcock, ITE, Repair, , , ITE re-wire ISK4425D-rev9._APshortmitigationsvg_july27update.png

See the attached for the way ITE has been re-wired for the Ta62 run. Note also that the copper block in the schematic on TBHT negative may not actually be connected. Wiring verification on Aug. 4.

Entry  Wednesday, September 15, 2021, 08:39, Travis Cave, ITE, Standard Operation, TM4, SiC#41, Module move 

TM#4 with SiC#41 has been moved from the NHC to ITE.

Entry  Friday, September 17, 2021, 12:34, Frank Song, ITE, Standard Operation, TM4, Sic#41, Module Connection IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg

 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection checklist are attached here.

Entry  Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg

 TM4 was disconnected and moved to NHC. 

Entry  Wednesday, October 06, 2021, 10:42, David Wang, ITE, Repair, , , ITE IG1S cable end connector replacement 

ITE IG1S cable end connector replacement has been finished by Roy Huang.

Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg

 the module with target UC#35 was connected in ITE and being pumped down.

Entry  Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer 

 the five shielding blocks have been moved from ITW to ITE. 

Entry  Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection IMG_4456_(2).JPG

 the TM4 with UCx#35 was disconnected in ITE.

Entry  Tuesday, November 30, 2021, 11:03, David Wang, ITE, Standard Operation, TM4, Ta#63., Remotely remove TM4(Ta#63) from TCS to ITE. 

Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful.

Entry  Tuesday, November 30, 2021, 12:51, David Wang, ITE, Standard Operation, TM4, Ta#63., Tm4 has been connected in ITE.  from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg

TM4 has been connected in ITE. See attachment for checklist.

Entry  Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63.jpg

 electric check done in ITE. 