Entry  Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 

The TM1 HS line is  pressure tested this morning with 70 psi helium  at CS. No response has been found on leak detector.

Entry  Tuesday, July 22, 2014, 07:32, David Wang, Conditioning Station, Standard Operation, TM1, , Stop TM1 and CS turbo pumps and ruff pump. 

Stop TM1 and CS turbo pumps and ruff pump. TM1 is disconnect at CS. It will be vented tomorrow morning and moved to ITW.

Entry  Wednesday, July 23, 2014, 13:36, David Wang, ITW, Standard Operation, TM1, , TM1 in ITW. 

  TM1 has been connected in ITW . The new roughing pump replaced on last Friday works good. I started all turbo pumps in ITW. The ITW TP1 controller was broken during the starting time. Dimo and I changed a new controller for ITW TP1 in electrical room. The pumping down is good so far. ITW water supplies to TM1 only.      

Entry  Wednesday, September 03, 2014, 10:50, David Wang, ITW, Standard Operation, TM1, , TM1 has been disconnected in ITW. 

  TM1 has been disconnected in ITW.

Entry  Wednesday, September 03, 2014, 13:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#43, module move 

TM#1 with Ta#43 has been moved from the ITW to the south hot cell.

Entry  Wednesday, September 03, 2014, 13:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check TM1_ZrC6_elec_chk_shc.PDF

TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal.

Entry  Thursday, September 04, 2014, 09:45, Travis Cave, Conditioning Station, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station.

Entry  Thursday, September 04, 2014, 09:47, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed 

Chad and I  leak checked the TM1 HS line with new target installed. Base leak rate 0.0xe-9 atm.cc/sec. No any response has been found on LD. The line will be pressurized at CS with helium tomorrow.

Entry  Thursday, September 04, 2014, 11:19, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 is connected in CS. 

TM1 is connected in CS. All turbo pumps are started.

Entry  Friday, September 05, 2014, 07:15, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 

Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak tight.

Entry  Monday, September 08, 2014, 13:44, David Wang, Conditioning Station, Standard Operation, TM1, ZrC#6, TM1 is disconnected at CS. 

Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning.

Entry  Wednesday, September 10, 2014, 07:12, David Wang, ITW, Repair, TM1, , Removed ITW HS and COIL flow rate monitors. 

Removed ITW HS and COIL flow rate monitors installed at the beginning of this year. They were installed on these two circuits for testing.They are broken during last run in ITW due to radioactive field.

Entry  Wednesday, September 10, 2014, 08:52, Travis Cave, ITW, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from the conditioning station to west target station.

Entry  Wednesday, September 10, 2014, 11:47, David Wang, ITW, Standard Operation, TM1, , TM1 has been connected in ITW. 

TM1 has been connected in ITW.  ITW and TM1 turbo pumps have been started. Water is supplied to TM1 only. Everything is good so far.

Entry  Tuesday, September 16, 2014, 10:41, David Wang, ITW, Standard Operation, TM1, ZrC #4, 5 Shielding blocks have been transferred from ITE to ITW. 

5 Shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam

Entry  Tuesday, October 14, 2014, 11:51, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from ITW to the south hot cell.

Entry  Tuesday, October 14, 2014, 11:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check TM1_ZrC6_postbeam.PDF

TM#1 with ZrC#6 post beam electrical check see attached pdf for results.

Entry  Tuesday, October 14, 2014, 12:19, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW. 

TM1 was disconnected in ITW this morning. Heat shield circuit is purged.

Entry  Tuesday, October 14, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check TM1_elec_check_no_target.PDF

Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details.

Entry  Wednesday, October 15, 2014, 12:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 with no target has been moved from the south hot cell to the south west silo.