ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module moveTM#1 with UC#9 moved from the conditioning
station to west station.
  
  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on.
  
  682   Friday, June 13, 2014, 10:33 Anders MjosITWDevelopmentTM1UC#9Flow meter dataCoil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE
  
  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW
  
  701   Wednesday, July 16, 2014, 10:32 Travis CaveSouth Hot-CellStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
west target station to the south hot cell.
  
  702   Wednesday, July 16, 2014, 11:28 David WangITWStandard OperationTM1 TM1 had been dsiconnected in ITW.The TM1 and ITW  were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning.
  
  703   Wednesday, July 16, 2014, 13:02 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical checkElectrical check of the TM#1 with UC#9
post beam at the south hot cell.
 TM1_UC9_Elecchk_postbeam.PDF 
  704   Wednesday, July 16, 2014, 13:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#9UCx#9 off Ta onThe UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current
  
  706   Wednesday, July 16, 2014, 14:28 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43Electrical checkTM#1 with Ta#43 electrical check see attached
PDF.
 TM1_Ta43_elec_chk_shc.PDF 
  707   Thursday, July 17, 2014, 09:29 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43module moveTM#1 with Ta#43 has been moved from the
south hot cell to conditioning station.
  
  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure:
  
  709   Thursday, July 17, 2014, 11:49 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedI connected TM1 at CS. All turbo pumps
have been started. The pumping down is 
good so far.
  
  710   Monday, July 21, 2014, 13:11 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.The TM1 HS line is  pressure tested
this morning with 70 psi helium  at
CS. No response has been found on leak detector.
  
  711   Tuesday, July 22, 2014, 07:32 David WangConditioning StationStandard OperationTM1 Stop TM1 and CS turbo pumps and ruff pump.Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW.
  
  712   Wednesday, July 23, 2014, 13:36 David WangITWStandard OperationTM1 TM1 in ITW.  TM1 has been connected in ITW .
The new roughing pump replaced on last  Friday
works good. I started all turbo pumps in
  
  735   Wednesday, September 03, 2014, 10:50 David WangITWStandard OperationTM1  TM1 has been disconnected in ITW.  TM1 has been disconnected in ITW.   
  736   Wednesday, September 03, 2014, 13:55 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43module moveTM#1 with Ta#43 has been moved from the
ITW to the south hot cell.
  
  737   Wednesday, September 03, 2014, 13:56 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical checkTM#1 with ZrC#6 electrical check at the
south hot cell. The conductance of target
on circuit A-D is a little lower then normal.
 TM1_ZrC6_elec_chk_shc.PDF 
  738   Thursday, September 04, 2014, 09:45 Travis CaveConditioning StationStandard OperationTM1ZrC#6module moveTM#1 with ZrC#6 has been moved from the
south hot cell to the conditioning station.
  
  739   Thursday, September 04, 2014, 09:47 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I  leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response
  