  1606   Tuesday, August 29, 2017, 08:59 David WangConditioning StationStandard OperationTM4 TM4 HS line leak checks

TM4 HS line leak checks are done, at SHC and TCS. SHC: Helium spray. TCS: Helium  pressurize 70psi.  LD base LR 0.0 X E-9 atm.cc/sec.  No leak has been found on both leak checks. 

  1607   Tuesday, August 29, 2017, 09:01 David WangConditioning StationStandard OperationTM4 TM4 has been connnected at TCS.

TM4 has been connected at TCS. TCS water system has been started for TM4. TM4 and TCS vacuum pumping down is good so far.

  1609   Tuesday, September 05, 2017, 06:33 David WangConditioning StationStandard OperationTM4 Turned off TCS water system and vacuum system.

Argon vent and disconnect TM4 at TCS.

  1612   Friday, September 08, 2017, 14:08 David WangConditioning StationRepairTM3 TCS and TM3

TM3 is located at TCS and it is pumping down now. TCS water system has been started.  All TCS water lines for TM3 module internal cooling are bypassed and looped at TCS top ground plate. Water only supply to TCS high  current conductors.

  1613   Wednesday, September 13, 2017, 10:05 David WangConditioning StationRepairTM3 Switch off TCS water system and vacuums

Preparing vent the TCS/TM3. We will remove TM3 service tray cover plate  after venting.

  1614   Wednesday, September 13, 2017, 16:05 David WangConditioning StationRepairTM3 remove Tm3 service tray cover plate

TM3 service tray cover plate has been removed. It is bagged and placed to TH b2 level south wall beside the silo.

  1615   Wednesday, September 13, 2017, 16:13 David WangConditioning StationRepairTM3 TCS turbo pumps are started.

TCS and TM3 all vacuum pumps are started. Everything is fine.

  1624   Friday, September 22, 2017, 12:13 David WangSouth Hot-CellMaintenanceTM2 TM2 service cap inside inspection.

Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.

 Panels are installed back after the inspection.

See attachments

Attachment 1: TM2_serica_cap_inspection_002.JPG
TM2_serica_cap_inspection_002.JPG
Attachment 2: TM2_serica_cap_inspection_003.JPG
TM2_serica_cap_inspection_003.JPG
Attachment 3: TM2_serica_cap_inspection_004.JPG
TM2_serica_cap_inspection_004.JPG
Attachment 4: TM2_serica_cap_inspection_005.JPG
TM2_serica_cap_inspection_005.JPG
Attachment 5: TM2_serica_cap_inspection_008.JPG
TM2_serica_cap_inspection_008.JPG
  1629   Thursday, September 28, 2017, 10:50 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 window and HS water lines at TCS.

  I did helium pressure test on TM2 containment box window and HS line at TCS. @ 70psi helium  for 3 minutes, HS:2.2XE-7 atm.cc/sec., Window:1.2XE-7 atm.cc/sec. There is no change on HS. But LR on window is bigger than before that was in E -9atm.cc/sec range.  

  1638   Tuesday, October 10, 2017, 10:38 David WangITWStandard Operation   5 shielding blocks have been transferred from ITE to ITW .

ITW is configured to take proton beam.

  1639   Tuesday, October 10, 2017, 10:45 David WangConditioning StationRepair  Re-route TCS water lines.

TCS  cooling polyurethane lines have been re-routed to solve to HV sparking issue on old configuration between lines and bais plate.  New re-routed system is tested to 70KV without spark. No leak has been found on new lines after the test.

ECO 4369, drawings and models IRH1715, IRH1716 have been issued and released for this job. Drawings and Models are located in PDM-ISAC1 -TCS polyurethane water lines re-route folder.

Attachment 1: TCS_re-route_001.JPG
TCS_re-route_001.JPG
Attachment 2: TCS_re-route_002.JPG
TCS_re-route_002.JPG
Attachment 3: TCS_re-route_003.JPG
TCS_re-route_003.JPG
Attachment 4: TCS_re-route_004.JPG
TCS_re-route_004.JPG
Attachment 5: TCS_re-route_005.JPG
TCS_re-route_005.JPG
Attachment 6: TCS_re-route_006.JPG
TCS_re-route_006.JPG
Attachment 7: TCS_re-route_007.JPG
TCS_re-route_007.JPG
Attachment 8: TCS_re-route_008.JPG
TCS_re-route_008.JPG
  1647   Thursday, October 19, 2017, 10:11 David WangConditioning StationStandard OperationTM4 Leak check on TM4 HS line at SHC and TCS.

Chad and I leak checked TM4 HS line after new target is installed yesterday. No leak has been found. Also, I helium pressurized the HS line at TCS this morning. TM4 HS line is good on this test. The TM4 gas line configuration on TM4 top is leak check as well. No problem.

  1656   Thursday, November 09, 2017, 09:34 David WangConditioning StationStandard OperationTM2Ta#55Leak check on TM2 HS line at SHC and TCS.

The TM2 HS line was leak checked at SHC yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed by Chad, NO leak.  It was helium pressurized at TCS this morning. Leak rat:2.5 XE-7 atm.c/sec. The result  is same as last time check. No concern.

  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCS

TCS vacuum system and water system have been started as well. Everything looks fine.

  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.

TM2 has been connected in ITW. All turbo-pumps are started. Everything works fine.

  1663   Wednesday, November 15, 2017, 08:55 David WangConditioning StationStandard Operation  Install shield plug onto TCS and pumping down TCS.

Shielding plug is installed onto TCS. TCS is being pumped down to keep it under vacuum for the rest of the year.

  1671   Tuesday, January 02, 2018, 10:46 David WangITE/ITW CoolingStandard Operation  Start High active water system.

High active water system  was  checked before restart. A small water leak on resin can supply valve was found. It is fixed. MP1 and MP2 were started and checked separately. System pressure and flow rate are normal.MP1 is in operation now. 

  1672   Tuesday, January 02, 2018, 11:28 David WangITEStandard OperationTM4 ITE annual water interlock check.

Eric and I finished ITE annual water interlock check. Everything works properly.

  1676   Tuesday, January 16, 2018, 06:50 David WangITE/ITW CoolingStandard Operation  Field measurement on old resin tank in silo

The old resin tank has been stored in silo since last year March.  Without crane the tank up, We use the pole monitor measured the field around the bottom of the tank in silo. The average contact field on the bottom is about 4.0msv/hr. @0.5meter , the field is about  900usv/hr. It is still too hot to remove it.

  1678   Wednesday, January 17, 2018, 06:51 David WangConditioning StationStandard Operation  Stop TCS vacuum pumps

I stopped TCS vacuum pumps for coming TM3 move.