953
|
Friday, June 19, 2015, 11:43 |
David Wang | ITW | Repair | TM1 | | ITW external water leak on dump circuit | There was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May |
6x |
|
952
|
Friday, June 19, 2015, 09:37 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Installation - June 18, 2015 | The following work was done on
June 18 2015:
- Finished cleaning and polishing |
|
|
951
|
Thursday, June 18, 2015, 08:03 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Optics Tray Transfer | The TM2 optics tray has been transferred
from the source tray to the transfer fixture
in preparation for installation of the source |
|
|
950
|
Wednesday, June 17, 2015, 14:21 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Waterblock Clean Polish | Fiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning |
|
|
949
|
Tuesday, June 16, 2015, 14:28 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Installation/Water Block Sealing Surface Clean | Today cleaning and polishing pads were
inserted into the hot cell.
Module side waterblock jig installation |
|
|
948
|
Monday, June 15, 2015, 14:14 |
David Wang | South Hot-Cell | Standard Operation | | | Target Hall Scheduled Activities April 07 - July 21 2015 | Weekly update Target Hall schedule 2015-06-15.
See attachment 1,2
2015-06-19, Update the schedule |
|
|
947
|
Monday, June 15, 2015, 10:16 |
chad fisher | South Hot-Cell | Repair | TM2 | | C.B. off | As per scedule TM2 containment box has
been removed.
|
|
|
946
|
Monday, June 15, 2015, 09:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 is now in the south hot cell. |
|
|
945
|
Friday, June 12, 2015, 13:27 |
David Wang | South Hot-Cell | Standard Operation | | | TM2 new source tray has been remotely transferred from TH into SHC successfully. | TM2 new source tray has been remotely transferred
into SHC successfully. The transfer table
has been moved back to TH within 1 hour. |
|
|
944
|
Friday, June 12, 2015, 07:49 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | New TM2 Source Tray Ground to HV Measurements | After bending and leak checking the new
measurements from ground to HV on the TM2
source tray are: |
|
|
943
|
Thursday, June 11, 2015, 13:43 |
Dan McDonald | Assembly/Bench Test | Repair | TM2 | | Leak check following tweaking of cooling line gaps | Maico, Chad and I conducted a leak check
on all affected lines following tweaking
of cooling line gaps. All lines pumped down |
|
|
942
|
Thursday, June 11, 2015, 13:11 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | Measurements beyween ground Plane and HV TM2 Source tary | I've taken measurements between HV and
ground circuit on TM2 source tray as instructed.
At their closest points: |
|
|
941
|
Wednesday, June 10, 2015, 16:49 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 New Source Tray - *HOLD* on installation into Hot Cell until HV approval | Don Jackson brought to my attention some
potential HV minimum spark gap issues
with the source tray cooling lines. |
|
|
940
|
Wednesday, June 10, 2015, 13:17 |
David Wang | ITE | Standard Operation | TM1 | | Target Hall Scheduled Activities April 07 - July 26 2015 | Weekly update the schedule after some jobs
have been finished in this week. |
|
|
939
|
Wednesday, June 10, 2015, 11:49 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. At this
stage, water is supplied to TM4 only. We
checked the TM4 water signals from electrical |
|
|
938
|
Wednesday, June 10, 2015, 10:02 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#31 | Module moved | TM#4 has been moved from the conditioning
station to the east target station. |
|
|
937
|
Tuesday, June 09, 2015, 14:36 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Inspection | Final inspection took place with Pierre,
Grant, Friedhelm and Anders present.
Two action items were raised: |
|
|
936
|
Tuesday, June 09, 2015, 09:49 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Alignment Check | Final alignment continued this morning.
Steerers have been aligned to 0.001
low, 0.000 left/right wrt master jig. |
|
|
935
|
Monday, June 08, 2015, 14:40 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Alignment Check | Final Alignment checks of the TM2 source
tray took place today.
Mater Jig: Front - 0,0 Back - 0 left, |
|
|
934
|
Thursday, June 04, 2015, 08:27 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray C-seal removal and inspection | Source tray for TM2 has been moved to the
alignment area by Dan and co.
This morning Dan removed the c-seals |
|