  949   Tuesday, June 16, 2015, 14:28 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Installation/Water Block Sealing Surface CleanToday cleaning and polishing pads were
inserted into the hot cell.
Module side waterblock jig installation
 20150616_104240.jpg20150616_140505.jpg20150616_140506.jpg 
  950   Wednesday, June 17, 2015, 14:21 chad fisherSouth Hot-CellRepairTM2 TM2 Waterblock Clean PolishFiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning
 20150617_080236_1.jpg20150617_081538_1.jpg20150617_083830.jpg 
  951   Thursday, June 18, 2015, 08:03 chad fisherSouth Hot-CellRepairTM2 TM2 Optics Tray TransferThe TM2 optics tray has been transferred
from the source tray to the transfer fixture
in preparation for installation of the source
 20150618_075326_1.jpg 
  955   Friday, June 19, 2015, 11:57 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray ProgressWindow waterline has been successfully
connected using 1 1/2 inch long non-blunt
start 1/4-28 bolts.
  
  956   Friday, June 19, 2015, 13:00 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Install StatusLeft manipulator now broken. Master side
however, so repair can take place Monday
or Tuesday.
  
  957   Tuesday, June 23, 2015, 10:55 chad fisherSouth Hot-CellRepair  Left Manipulator RepairThe master wrist/tong cable has been replaced
on the left manipulator. Everything appears
to function well so far.
  
  958   Tuesday, June 23, 2015, 14:19 chad fisherSouth Hot-CellRepairTM2 TM2 Water Block Jigs RemovedBoth halves of the water block jigs have
been removed and the module is now ready
for base vacuum leak and electrical checks.
 20150623_140917.jpg 
  960   Wednesday, June 24, 2015, 10:16 chad fisherSouth Hot-CellRepairTM2 TM2 Vacuum Leak CheckThe following circuits have been vacuum
leak checked and have not registered any
leaks:
  
  963   Friday, June 26, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 TM2 Retrofit StatusOn June 25th the following work was completed:
Optics tray was installed into TM2.
The lower fastener on the vertical cable
 20150625_075616_1.jpg20150625_083457.jpg20150625_105735.jpg20150625_110053.jpg 
  964   Friday, June 26, 2015, 09:45 chad fisherSouth Hot-CellRepairTM2 TM2 StatusContainment box window waterlines have
been connected and leak checked and new containment
box cover installed.
  
  968   Tuesday, June 30, 2015, 09:47 chad fisherSouth Hot-CellRepair  manipulator repairThe right hand manipulator has been repaired.
It took 43 minutes and I received ~ 0.56
mSv
  
  970   Tuesday, June 30, 2015, 12:37 chad fisherSouth Hot-CellStandard OperationTM1UCx#12UCx #12 RemovalUCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly
  
  979   Friday, July 03, 2015, 11:33 chad fisherSouth Hot-CellRepairTM2 TM2 Coil Leak ProgressFirst thing this morning the hot cell was
"cleaned up" in preparation for
the return of TM2 for attempted verification
 TM2_coil_leak_20150703_11.jpg20150703_111248.jpg 
  980   Friday, July 03, 2015, 13:29 chad fisherSouth Hot-CellRepairTM2 Hot Cell/ Module FieldsField measured at block "R" through
tool port with pole monitor is 6.65 mSv/H.
There are three air hoods and two
  
  983   Wednesday, July 08, 2015, 12:18 chad fisherSouth Hot-CellRepairTM2 R U Coil line RemovalR U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module.
 TM2_20150708_coil_line_leak.jpg 
  986   Wednesday, July 08, 2015, 14:48 chad fisherSouth Hot-CellRepairTM2 TM2 StatusWater block jig has been removed. Stuck
source tray side water block jig component
has been removed. An attempt was made to
  
  989   Thursday, July 09, 2015, 13:51 chad fisherSouth Hot-CellRepairTM2 Coil line removal hot cellcoil line has been removed from the hot
cell. Initial decon was performed...after
it still appears to have approximately 200
  
  991   Friday, July 10, 2015, 09:33 chad fisherSouth Hot-CellRepairTM2 Coil Line DeconCoil line has been in RPG's ultrasonic
decon over night. Initial swipes this morning
picked up 5000 counts. It has been decontaminated
  
  995   Tuesday, July 14, 2015, 12:56 chad fisherSouth Hot-CellRepairTM2 TM2 containment box removedContainment box was removed from Tm2 this
morning  in preparation for installation
of coil line and all the trimmings.
  
  996   Wednesday, July 15, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 Coil Line replacementwater block jig installed, module side
sealing surfaces re-polished and cleaned.
Coil line inserted into the hot cell and
 TM2_20150715_093157.jpgTM2_20150715_094745.jpg 