  1779   Friday, September 07, 2018, 10:55 David WangITEStandard OperationTM4UCx 24#TM4 has been connected to ITE/ Checklist

TM4 has been connected to ITE on Sep 04th. See attachment  for checklist.

Attachment 1: TM4_UCx_24#__connection_check_list.pdf
TM4_UCx_24#__connection_check_list.pdf TM4_UCx_24#__connection_check_list.pdf TM4_UCx_24#__connection_check_list.pdf
  1797   Tuesday, October 02, 2018, 09:49 David WangITEStandard OperationTM4UCx 24#TM4 was disconnected in ITE.

TM4 was disconnected in ITE yesterday. See attachment for checklist.

Attachment 1: TM2_UCx_24#_disconnection_in_ITE..pdf
TM2_UCx_24#_disconnection_in_ITE..pdf TM2_UCx_24#_disconnection_in_ITE..pdf
  1802   Tuesday, October 09, 2018, 13:46 Travis CaveITEStandard OperationTM4Ta#57Module move

 TM#4 with Ta#57 has been moved from the conditioning station to the east target station.

  1803   Wednesday, October 10, 2018, 07:52 David WangITEStandard OperationTM4Ta#57TM4 has been connected in ITE.

TM4 has been connected in ITE. see attachment.

Attachment 1: TM4_with_TA#56_connection_in_ITE.pdf
TM4_with_TA#56_connection_in_ITE.pdf TM4_with_TA#56_connection_in_ITE.pdf TM4_with_TA#56_connection_in_ITE.pdf
  1822   Thursday, November 22, 2018, 08:52 Anders MjosITEStandard OperationTM4Ta#57Closed ITE dump water

Paddle wheel signal was tripping proton beam in ITW. Valved off ITE dump to divert flow to ITW. Field around valve was about 600 uSv/h

  1830   Wednesday, November 28, 2018, 07:04 David WangITEDevelopmentTM4LpTa 56New high current flexible cables inspection after LpTa#56 beam run.

Inspected new high current flexible cables during TM4 disconnection. The new cables and adapters work fine.

Attachment 1: new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPG
new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPG
Attachment 2: new_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
new_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the conditioning station to the east target station.

  1836   Tuesday, December 04, 2018, 12:36 David WangITEStandard OperationTM4UCx 26.TM4 has been connected in ITE/ Checklist.

TM4 has been connected in ITE. See attachment for connection checklist

Attachment 1: UCx26_TM4_connection_checklist.pdf
UCx26_TM4_connection_checklist.pdf UCx26_TM4_connection_checklist.pdf UCx26_TM4_connection_checklist.pdf
  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block move

Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am).

  1868   Friday, February 15, 2019, 12:05 David WangITEMaintenanceTM4 ITE annual vacuum leak check.

Helium pressure test on all water lines: 70psi , 3 minutes. HS has a quick response to 9Xe-9atm.cc/sec for 20 seconds. No response on other lines. All water lines are good. Air to vacuum  leack check on ITE and TM4: TM4 IG1 / Steers side panel has a low E-6 atm.cc/sec leak. The o-ring need to be changed when TM4 is located at TCS. All other air to vacuum seals are good on both primary and secondary vacuum vessel.

  1869   Friday, February 15, 2019, 12:09 David WangITEMaintenanceTM4 ITE water system maintenance.

The ITE water system maintenance job is done. Changed all paddle wheels and coils on ITE flow sensors. All using water poly-tubes in ITE are replaced .  Started high active water pump, and checked ITE water signals. They are good. No leak has been found on  replaced tubes and related fittings.

  1924   Friday, May 17, 2019, 10:47 Travis CaveITEStandard OperationTM2Ta#58Module move

 TM#2 with Ta#58 has been moved from the south hot cell to the east target station.

  1927   Wednesday, May 22, 2019, 11:50 David WangITEStandard OperationTM4 TM2 has been connected in ITE.

TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good  so far.

See attachment for connection checklist.

Attachment 1: Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf
Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf
  1932   Tuesday, June 04, 2019, 08:46 David WangITEStandard OperationTM2 ITE water signal interlock check.

ITE water signal interlock check is done. Everything is good. Coil 2   circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1 circuit on Module since now.

  1943   Friday, June 14, 2019, 08:15 David WangITEStandard OperationTM2 5 shielding blocks are moved to ITE.

ITE is configured to take proton beam.

  1959   Thursday, August 08, 2019, 09:33 Carla BabcockITEDevelopmentTM2Ta#58TM2 HV conditioning with protons, round 1

Starting HV tests on TM2 with 50uA of protons.

Tuesday, August 06, 2019, 03:37 : Ramping up 500V every 2mins or so, couple of sparks, then consistent sparks at 34kV. No vacuum response on IG1 for any sparks, even though the current spikes from around 40uA to 1300uA. Brought it down to 28kV to stop sparking. See a response on the EZL frequently.

Tuesday, August 06, 2019, 05:24 : Going above 30kV proves very difficult, lots of up and down, frequent sparks, still no vacuum response. Still seeing an EZL response.

Tuesday, August 06, 2019, 05:58 : Up to 31.5kV on bias, 1046V on EE and 15kV on EZL.

Tuesday, August 06, 2019, 06:50 : Controls are being sticky - not responding well.

Tuesday, August 06, 2019, 07:25 : Sat at 32 kV > 20mins with 2 sparks

Tuesday, August 06, 2019, 08:03 : lots of sparking at 36kV, went back down to 35kV. Current draw is 50uA.

Tuesday, August 06, 2019, 08:10 : lots of sparking after 9 mins at 35kV, had to turn it down to 34kV

Tuesday, August 06, 2019, 08:11 : Still sparking at 34, down to 33

Tuesday, August 06, 2019, 08:31 : At 33kV, sparked twice in 20mins and was going for another when the protons went off.

With protons off, the bias current dropped quickly from 66uA to 40uA and raising the bias to 40kV was not difficult.  Later bias up to 50kV. Still no conclusion on if the sparking was inside or outside of the vacuum. No vacuum response seems to indicate outside, however the influence of protons would indicate inside. To be investigated visually when TM2 comes to the HC.

  1961   Wednesday, August 14, 2019, 08:55 David WangITEStandard OperationTM2 TM2 has been disconnected in ITE.

TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time.

  1963   Thursday, August 15, 2019, 09:36 Adam NewsomeITEStandard OperationTM2ZrC #8TM2 Move

TM2 was moved from South Hot Cell to ITE. ZrC #8 target.

  1965   Friday, August 16, 2019, 08:46 David WangITEStandard OperationTM4ZrC #8.TM2 has been connected in ITE.

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

  1968   Friday, August 16, 2019, 14:23 Carla BabcockITERepairTM2ZrC#8TM2 electrical checks in ITE

Ramped voltage on TM2 up to 30kV with no problems. Bias current is at 29uA, same as original TM2 bias current (see archiver for ITE June 15th, before protons) and similar to 31uA right after protons went off on Aug. 6.

TGHT=0A

TBHT=0A

BIAS V=30kV

BIAS current = 29uA

EZL V= 15kV

EZL current= 51uA

EE V= 1kV

EE current= 0.952mA

IG1= 8.6e-7

protons=0

This seems ok despite poor electrical checks showing 300 MOhm resistance between HV and ground. These values indicate a resistance of 1 GOhm. Let's see what happens when protons are on.

For future (optimistic) reference when testing protons:

BIAS=35kV, 35uA

EZL-17.5kV, 60uA

BIAS=38kV, 37uA

EZL=18.5kV, 63uA