1310
|
Tuesday, August 09, 2016, 10:05 |
Travis Cave | ITE | Standard Operation | TM4 | UC#17 | module moved | TM#4 with UC#17 is now in the east target
station. |
|
|
1313
|
Wednesday, August 10, 2016, 11:30 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | TM4 has been connected at ITE | Dan and I connected TM4 in ITE yesterday.
It is pumping down at ITE now. Everything
is fine so far. |
|
|
1319
|
Monday, August 15, 2016, 10:08 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | 5 Shielding blocks have been transferred from ITW to ITE. | Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
1356
|
Tuesday, September 20, 2016, 11:41 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnected in ITE. No water
line purge on HS and 3 water circuits are
looped after disconnection. The HALCW system |
|
|
1364
|
Tuesday, September 27, 2016, 09:13 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#34 | module moved | TM#4 with SiC #34 has been moved to the
east target station. |
|
|
1365
|
Wednesday, September 28, 2016, 13:43 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected at ITE | All ITE turbo pumps have been started since
yesterday afternoon. The ITE and TM4 pumping
down is good so far. |
|
|
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
|
1374
|
Thursday, October 20, 2016, 14:17 |
Anders Mjos | ITE | Repair | TM4 | SiC#34 | HV enclosure inspection | The HV enclosure and module connections
were inspected by David and Anders on Wednesday
19th in an attempt to find any HV problems |
|
|
1385
|
Tuesday, November 01, 2016, 14:53 |
David Wang | ITE | Standard Operation | TM4 | | TM4 was disconnected at ITE | TM4 was disconnected at ITE this morning.
It was moved to SHC after. No alpha
alarm issue has been happened during and |
|
|
1386
|
Tuesday, November 01, 2016, 14:54 |
David Wang | ITE | Standard Operation | TM4 | | TM4 was disconnected at ITE | TM4 was disconnected at ITE this morning.
It was moved to SHC after. No alpha
alarm issue has been happened during and |
|
|
1394
|
Tuesday, November 08, 2016, 10:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#50 | module moved | TM#4 with Ta#50 has been moved to the east
target station. |
|
|
1396
|
Tuesday, November 08, 2016, 14:45 |
David Wang | ITE | Maintenance | TM4 | | TM4 has been moved to ITE and connected there. | All ITE and TM4 turbo pumps are started.
The east station pumping down is good so
far. |
|
|
1422
|
Wednesday, January 18, 2017, 09:55 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 2017 winter shut down leak check. | ITE and TM4 2017 winter shut down leak
check are finished. All ITE primary, secondary
vacuum vessel and TM4 water lines are good. |
|
|
1432
|
Wednesday, February 01, 2017, 12:23 |
David Wang | ITE | Standard Operation | TM2 | | TM2 has been connected in ITE. | TM2 has been connected in ITE. The SST
window water lines in ITE can not be connected
properly to TM2. The water line connector |
|
|
1446
|
Tuesday, March 07, 2017, 14:41 |
David Wang | ITE | Maintenance | | | ITE dump plug water circuit is closed for ITE IG1S small surge. | It is closed @ 2:35PM by closing supply
side valve first , the return side valve
of ITE dump plug . |
|
|
1447
|
Wednesday, March 08, 2017, 14:09 |
David Wang | ITE | Maintenance | TM2 | | ITE IG1S increasing. | By retrieving data further, It has been
found no directly relationship between IG1S
surging and dump plug water opening. Vacuum |
|
|
1464
|
Monday, March 27, 2017, 06:33 |
David Wang | ITE | Standard Operation | | | ITE clean up | ITE clean up is done. HV cage inside
is wiped. |
|
|
1473
|
Tuesday, April 04, 2017, 09:29 |
Travis Cave | ITE | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from the
conditioning station to the east target station. |
|
|
1477
|
Tuesday, April 04, 2017, 14:40 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | all turbo-pumps are started. Everything
looks fine so far. |
|
|
1479
|
Wednesday, April 05, 2017, 11:57 |
David Wang | ITE | Maintenance | | | ITE target module flange o-ring repalcement | ITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. |
|