Wednesday, July 22, 2015, 12:13, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Short Findings
|
Wednesday, July 22, 2015, 11:31, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check
|
Tuesday, July 21, 2015, 12:38, David Wang, ITW, Repair, , , ITW external water leak on dump circuit has been fixed.
|
Tuesday, July 21, 2015, 12:29, David Wang, ITE, Maintenance, , , target pit Hepa filter
|
Tuesday, July 21, 2015, 10:40, Grant Minor, Assembly/Bench Test, Repair, TM2, , TM2 - bench inspection photos from 6-June-2015
|
Tuesday, July 21, 2015, 09:21, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check Failed
|
Monday, July 20, 2015, 17:11, Grant Minor, South Hot-Cell, Repair, TM2, , TM2 New Source Tray - additional photos 20 July 2015
|
Monday, July 20, 2015, 14:12, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Status
|
Friday, July 17, 2015, 13:51, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Status
|
Thursday, July 16, 2015, 14:36, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Status
|
Thursday, July 16, 2015, 07:38, David Wang, ITE, Standard Operation, , , Target Hall Scheduled Activities April 07 - August 07 2015
|
Wednesday, July 15, 2015, 11:18, David Wang, South Hot-Cell, Repair, TM2, , leak check coil line(R,U) on TM2 at SHC
|
Wednesday, July 15, 2015, 11:02, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Coil Line Vacuum Leak Check
|
Wednesday, July 15, 2015, 09:44, chad fisher, South Hot-Cell, Repair, TM2, , Coil Line replacement
|
Tuesday, July 14, 2015, 12:56, chad fisher, South Hot-Cell, Repair, TM2, , TM2 containment box removed
|
Tuesday, July 14, 2015, 08:42, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved
|
Monday, July 13, 2015, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module moved
|
Friday, July 10, 2015, 14:41, Anders Mjos, Conditioning Station, Maintenance, TM1, , Replaced roughing pump
|
Friday, July 10, 2015, 09:33, chad fisher, South Hot-Cell, Repair, TM2, , Coil Line Decon
|
Thursday, July 09, 2015, 14:02, David Wang, Conditioning Station, Development, TM1, , TM1 is pumping down at CS
|
|