  2766   Monday, February 10, 2025, 11:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from W_S silo to SHC.Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
  
  2767   Tuesday, February 11, 2025, 10:36 chad fisherSouth Hot-CellRepairTM2 Conductor Block Insulator ReplacementCeramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it
 Image_(12).jpegImage_(13).jpegImage_(14).jpeg 
  2769   Friday, February 14, 2025, 10:48 David WangSouth Hot-CellStandard OperationTM2No targetTM2 has been moved from SHC to TCS. TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. 
  
  2770   Friday, February 14, 2025, 11:35 David WangConditioning StationStandard OperationTM2 TM2 TP1/TP2 and TCS TP1S have been started at TCS.TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in
  
  2774   Thursday, February 20, 2025, 11:10 David WangConditioning StationStandard OperationTM2No targetTM2 has been moved from TCS to west-south silo.TM2 has been moved from TCS to west-south
silo. Travis and I did the job. The move
is successful. 
  
  2801   Tuesday, May 06, 2025, 14:40 Frank SongNorth Hot-CellStandard OperationTM2UC#49electrical check/leak check TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail.
 TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf 
  2802   Wednesday, May 07, 2025, 13:41 Aaron TamNorth Hot-CellStandard OperationTM2UC#49 UC#49 SIS w/ Gasline InstallMay 7th, 2025 - Aaron Schmidt, Aaron Tam 
UC#49 Handover - good
 Cable_hopped_on_East_Manip.jpgunsuccessful_method_1.jpgunsuccessful_method_2.jpgGasline_Gasket_installed.jpg 
  4   Thursday, June 30, 2011, 16:04 Pierre BricaultConditioning StationRepairTM1 TM1 statusFriday June 24 2011
The target module has been moved
to the Conditioning Station (CS)
  
  11   Thursday, July 21, 2011, 17:39 Bevan MossConditioning StationRepairTM1 TM1 Ground Electrode, Thermocouple line, Stem, panel, repairsOver the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the
 IMG_1681.JPGIMG_1662.JPGIMG_1686.JPGIMG_1695.JPG 
  12   Friday, July 22, 2011, 10:30 Bevan MossConditioning StationRepairTM1 TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs

    

       
            
  
  14   Wednesday, July 27, 2011, 14:34 Travis CaveSouth Hot-CellStandard OperationTM1 Module moveTM#1 has been moved from the Conditioning
Station to the South Hot Cell for the installation
of Ta#37.
  
  15   Thursday, July 28, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM1Ta#37Electrical checkTM#1 has passed the the electrical check.  Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf 
  16   Thursday, July 28, 2011, 14:07 Travis CaveConditioning StationStandard OperationTM1Ta#37Module moveTm#1 with Ta#37 moved from the south hot
cell to the conditioning station. Move went
well.
  
  17   Tuesday, August 02, 2011, 09:41 Pierre BricaultConditioning StationRepairTM1ITW-TM1-Ta#37-LP-SISTest high voltage on TM1 TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6
  
  18   Wednesday, August 03, 2011, 11:24 Travis CaveITWStandard OperationTM1Ta#37Module moveTM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well.
  
  19   Wednesday, August 17, 2011, 13:09 Bevan MossITWStandard OperationTM1Ta #37TM1 move from ITW to Hot Cell TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during
  
  20   Thursday, August 18, 2011, 13:12 chad fisherSouth Hot-CellStandard OperationTM1UCx #2UCx #2 InstallationUCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between
  
  21   Thursday, August 18, 2011, 14:09 Bevan MossSouth Hot-CellStandard OperationTM1UCx#2Leak and Electrical Check plus Remote Move to Conditioning Station TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a  leak
  
  22   Thursday, August 18, 2011, 16:07 Bevan MossConditioning StationStandard OperationTM1UCx#2Pump Down Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52
  
  23   Friday, August 19, 2011, 14:52 Bevan MossConditioning StationRepairTM1UCx#2Leak Check A
leak check was performed on the module when
it was in the conditioning station today.
  