Entry  Wednesday, July 20, 2011, 09:55, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from South Hot Cell to East Target Station. 

Move completed, move went well.

Entry  Tuesday, July 19, 2011, 11:17, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#35, Move of TM#4 from East target station to south hot cell. 

Move went well no problems readings at East Target Station were very high at 500mSv/hr.

Entry  Wednesday, September 28, 2011, 09:07, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from East target station to south hot cell. 

Move of TM#4 with Ta#36 from East target station to south hot cell, move went well.

Entry  Monday, October 03, 2011, 11:00, Travis Cave, ITW, Standard Operation, TM1, UCx#2, Move from west station to south hot cell 

TM#1 with UCx#2 has been moved from the west station to the south hot cell. Move went well.

Entry  Thursday, June 21, 2018, 17:15, Isaac Earle, North Hot-Cell, Development, , , Motorla CP200 radio with throat mic tested in NHC 

 A Motorla CP200 portable two-way radio was tested today for use inside the ISAC hot cells.  A High Technology Communications Throat microphone PRO model from Planet Headset was used with the radio.  Chad entered the NHC wearing the throat mic and radio under a air supplied hood to mimic real world conditions.  Communication was clear with the other person in the NHC service area, in the SHC service area, at various locations on the B1 level, and even with an operator in the TRIUMF Main Control Room.

This testing satisfies RS 104 of the NHC requirements specification (Document-131915, Release 1)

Entry  Wednesday, June 12, 2019, 08:56, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, More TM4 conditioning without source tray 

The conditioning station was ramped down overnight and David ramped it back up this morning. Currently trying to get it to sit stable at something higher than 55kV.

 

Wednesday, June 12, 2019, 08:11 : Sitting at BIAS / EL = 53.9 / 28, 2 sparks to ground, one turned off TP2

Wednesday, June 12, 2019, 08:53 : Been at BIAS / EL = 56 / 28 for >10mins with no real sparks. Will continue up.

Wednesday, June 12, 2019, 08:54 : Spark to EL at 56.1

Wednesday, June 12, 2019, 09:34: Sitting at 55kV for 40 mins. 2 sparks to ground, 1 spark to the EL.

Wednesday, June 12, 2019, 09:49 : Leaving it at 56.6 for a while

Wednesday, June 12, 2019, 09:56 : Either there was a spark to IG1S or there is a vacuum limit that does not accept a 1.2e-6T spike. Everything turned off, but everything seems to still be working.

Entry  Thursday, May 24, 2018, 14:04, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Modules moved 

 TM#4 has been moved from the south hot cell to the east target station, and TM#2 has been moved from the south silo to the south hot cell.

Entry  Tuesday, October 30, 2018, 10:50, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Modules moved 

 Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1,  was moved from the west target station to the south hot cell.

Entry  Wednesday, February 20, 2019, 09:07, chad fisher, South Hot-Cell, Repair, TM2, , Module side waterblock jig 

I have installed the module side water block jig.

Entry  Tuesday, September 10, 2013, 12:11, Isaac Earle, South Hot-Cell, Repair, TM3, , Module side heat shield water block polishing and blank-off installation 

 The sealing surfaces of the module side heat shield water block were polished on September 9th in the morning using Chad's polishing tool with the following attachments:

- Scotchbrite pads  (30 seconds)  (after this step indium material from the previous seal was no longer visible on the sealing surface)

- 2000 grit sandpaper (30 seconds)

- Felt material with isopropanol (30 seconds)

- Lint free pad (30 seconds)

 

After the final step the surface was rinsed with isopropanol and air dried using canned air.  The water block blank-off was then installed with the manipulators, tightened until snug using the air ratchet, then tightened an additional 1/4 turn while the water block was gripped firmly using one manipulator.  The seal was leak checked and passed successfully.

Entry  Wednesday, November 25, 2015, 11:55, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#14, Module moved and electrical check. TM4_UC14_elecchk_SHC.PDF

TM#4 with UC#14 was moved from the south hot cell to the conditioning station.  Here are the results of the electrical check of the module with the UC#14 target while at the hot cell.

Entry  Wednesday, May 27, 2015, 08:57, Travis Cave, Conditioning Station, Standard Operation, TM2, , Module moved 

TM#2 with no source tray has been moved from the south hot cell to the conditioning station.

Entry  Friday, May 29, 2015, 09:16, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, Module moved 

TM#2 with no source tray has been moved from the conditioning station to the north east silo.

Entry  Monday, June 01, 2015, 11:23, Travis Cave, ITE, Standard Operation, TM4, Ta#45, Module moved 

TM#4 with Ta#45 has been moved from the east target station to the south hot cell.

Entry  Tuesday, June 02, 2015, 11:54, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#31, Module moved 

TM#4 with SiC#31 has been moved from the south hot cell to the conditioning station.

Entry  Wednesday, June 10, 2015, 10:02, Travis Cave, ITE, Standard Operation, TM4, SiC#31, Module moved 

TM#4 has been moved from the conditioning station to the east target station.

Entry  Monday, June 15, 2015, 09:42, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved 

TM#2 is now in the south hot cell.

Entry  Tuesday, June 30, 2015, 11:27, Travis Cave, ITW, Standard Operation, TM1, UC#12, Module moved 

TM#1 with UC#12 has been moved from the west station to the south hot cell.

Entry  Thursday, July 02, 2015, 11:49, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Module moved 

TM#1 has been moved from the south hot cell to the south west silo.

Entry  Friday, July 03, 2015, 09:11, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module moved 

TM#2 has been moved from the conditioning station to the south hot cell.