1143
|
Tuesday, December 01, 2015, 06:41 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#14 | Turned off TCS all vacuum pumps and water pumps. | I turned off TCS vacuum and water pumps.
The TSC and TM4 are still under vacuum condition. |
|
1146
|
Tuesday, December 01, 2015, 14:30 |
David Wang | ITE | Standard Operation | TM4 | UCx 13 | TM4 has been connected in ITE | TM4 has been connected in ITE. All turbo-pumps
are started. Everything is good so far. |
|
1153
|
Friday, January 22, 2016, 14:24 |
David Wang | South Hot-Cell | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule (sketch) | Post a sketch of 2016 winter shut down
target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING |
   |
1154
|
Friday, February 12, 2016, 13:00 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | 2016 Winter shut down target hall schedule.
See attachments1,2.
update the schedule weekly. |
6x |
1156
|
Thursday, February 25, 2016, 06:48 |
David Wang | ITE | Standard Operation | | | 4 Shielding blocks have been transferred from ITE to block storage area. | Dan and I transferred 4 shielding blocks
from ITE to block storage area. The ITE pit
is opened now. |
|
1157
|
Thursday, February 25, 2016, 06:52 |
David Wang | Conditioning Station | Standard Operation | | | stop CS vacuum pumps. | I stopped the conditioning station vacuum
pumps. The CS is still under vacuum without
venting. |
|
1158
|
Thursday, February 25, 2016, 09:27 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW | TM2 has been disconnected in ITW (except
vacuum lines). The vacuum system is still
operating. |
|
1159
|
Thursday, February 25, 2016, 09:29 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnect in ITE(except
vacuum lines). The ITE vacuum system is still
operating. |
|
1160
|
Wednesday, March 02, 2016, 09:51 |
David Wang | ITW | Standard Operation | TM2 | | all water lines on TM2 and TM4 are purged. | All water lines on TM2 and TM4 are purged
for upcoming water lines helium pressure
test. |
|
1161
|
Wednesday, March 02, 2016, 10:04 |
David Wang | ITW | Standard Operation | TM2 | | Leak check on ITW and TM2. | Dan and I leak checked TM2 and ITW primary
vacuum vessel. It was found a 1X E-7 atm.cc/sec
leak on top T flange seal between TM2 and |
|
1162
|
Friday, March 04, 2016, 12:34 |
David Wang | ITE | Standard Operation | TM4 | | TM4 ITE annual leak check | Dan and I finished TM4 and ITE annual leak
check on primary and secondary vacuum vessel.
We found one leak on a KF25 blank off |
|
1163
|
Friday, March 04, 2016, 13:58 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | Update Schedule according to changes.See
attachment1, 2.
Re-post it after some minor |
8x |
1164
|
Monday, March 14, 2016, 11:24 |
David Wang | ITE/ITW Cooling | Maintenance | | | HALCW resin tank filter cartridges are changed today | Two of resin tank filter cartridges(supply
and return) are changed today. Old cartridges
and bagged and tagged. The contact field |
  |
1165
|
Monday, March 14, 2016, 15:22 |
David Wang | Conditioning Station | Standard Operation | TM2 | | 2016 Winter Shut Down Target Hall Schedule | update schedule according to change. See
attachment 1,2
|
 |
1168
|
Thursday, March 17, 2016, 14:57 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 first round leak check in SHC | Chad and I finished the first round check
on Tm2 water lines. The lines and spots
checked are: Target oven + and - (front side |
|
1170
|
Friday, March 18, 2016, 09:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Sep) | I would like to post the spreadsheet of
target hall schedule for beam schedule 130(Apr
to Sep) first. The MS project of TH schedule |
 |
1171
|
Friday, March 18, 2016, 09:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 vacuum sysytem has been connected at TCS | TM2 vacuum system has been connected at
TCS. Started roughing pump. Everything is
good so far. |
|
1174
|
Monday, March 21, 2016, 10:25 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 Helium pressure Test Result in TCS and ITW | TM2 has been helium pressure tested in
ITW and TCS. They are both tested with 70psi
helium, each circuit for 3minutes. |
|
1175
|
Monday, March 21, 2016, 11:30 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are stopped | I stopped TM2 and TCS vacuum pumps. It
will be vented and disconnected this afternoon
for tomorrow moving. |
|
1176
|
Monday, March 21, 2016, 15:27 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 has been disconnected at TCS | TM2 vacuum system has been disconnected
at TCS. Venting is in process now. |
|