ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
2253
|
Monday, October 04, 2021, 09:33 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | C#3 | TM2 with target connection test | the test was done when TM2 sit on
NHC. |
|
2262
|
Tuesday, November 09, 2021, 09:58 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | module disconnection | the module TM2 with target C#3 was
disconnected at ITW and is being remoted
moving to SHC. |
|
2263
|
Tuesday, November 09, 2021, 14:35 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | UCX#36 | Module Move | TM#2 was moved from ITW to SHC,
then moved back to ITW. |
|
2264
|
Wednesday, November 10, 2021, 08:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 | electrical check | An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. |
|
2265
|
Wednesday, November 10, 2021, 08:32 |
Frank Song | ITW | Standard Operation | TM2 | UC#36 | Module Connection | TM2 with target UC#36 was connected
at ITW. |
|
2283
|
Wednesday, January 05, 2022, 12:45 |
Frank Song | ITW | Maintenance | TM2 | UC#36 | TM2 SIS with Target and No external Connections | electrical checked in ITW |
|
2284
|
Thursday, January 06, 2022, 10:37 |
David Wang | ITW | Standard Operation | TM2 | | ITW vacuum vessel and TM2 internal cooling lines leak check in pit. | Frank and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines
are leak free. They passed 70 psi helium |
|
2287
|
Monday, January 10, 2022, 12:38 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITW to NHC. | Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful. |
|
2289
|
Tuesday, January 11, 2022, 11:51 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from NHC to SMP. | TM2( no target ) has been moved from
NHC to SMP. The moving is smooth and
successful. |
|
2291
|
Monday, January 17, 2022, 10:44 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 (the target removed) | TM2 electrical check without Target. | An electric check was done right
after module moving from SMP to SHC. |
|
2313
|
Monday, April 04, 2022, 21:04 |
Carla Babcock | Conditioning Station | Development | TM2 | | HV testing of IGLIS wires in TM2 | TM2 is in the TCS without containment box
for HV testing following the installation
of the IGLIS wiring. |
|
2314
|
Wednesday, April 13, 2022, 11:54 |
Carla Babcock | South Hot-Cell | Maintenance | TM2 | | EZL cable change | Chad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays. |
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET | A Test Febiad Target was installed
and checked at SHC. |
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection | TM2 was connected in ITW with a Febiad
Test Target. |
|
2317
|
Thursday, April 28, 2022, 08:16 |
David Wang | ITW | Standard Operation | TM2 | | Annual ITW water signal interlocks check . | Annual ITW water signal interlocks check
was done with TM2 in ITW. Water
signal interlocks on all water circuits related |
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection | TM2 with a test target was disconnected
in ITW. |
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections | An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. |
|
2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection | TM2 with Febiad target SiC#42 was
connected in ITW. |
|
2329
|
Thursday, June 09, 2022, 09:47 |
Matthew Gareau | South Hot-Cell | Repair | TM2 | SiC#42 | containment box repair, Einzle lens, multi pin | On June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to |
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC | An electrical check was done at NHC,
see attachment pls. |
|