ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
192
|
Tuesday, October 09, 2012, 10:35 |
David Wang | ITE | Standard Operation | TM4 | NiO #1 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air. |
|
193
|
Tuesday, October 09, 2012, 11:17 |
Bevan Moss | ITE | Standard Operation | TM4 | NiO#1 | Module Move | TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues. |
|
197
|
Wednesday, October 24, 2012, 11:51 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module moved | Yesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station, move went well. |
|
199
|
Wednesday, October 31, 2012, 11:24 |
David Wang | ITE | Standard Operation | TM4 | | Transfer five shielding blocks from ITW to ITE. | Bevan and I transferred five shielding
blocks from ITW to ITE. ITE is ready for
taking proton beam. |
|
215
|
Wednesday, November 14, 2012, 11:04 |
David Wang | ITE | Repair | TM4 | | Change ITE dump water circiut flow wheel | I changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical |
|
218
|
Monday, December 03, 2012, 19:34 |
Grant Minor | ITE | Standard Operation | TM4 | LpUCx | Argon supply opened for ITE vent | Around 7pm tonight I opened the main valve
approximately 1.5 turns on the Argon bottle
used for venting ITE, located in the ISAC |
|
219
|
Tuesday, December 04, 2012, 13:27 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module move & electrical check | TM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well. Also the electrical check |
|
220
|
Tuesday, December 04, 2012, 13:33 |
David Wang | ITE | Standard Operation | TM4 | UCX#5 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. All water lines
had been purged.Travis was with me . |
|
243
|
Friday, February 08, 2013, 11:42 |
Grant Minor | ITE | Maintenance | | | TAPC 477 resolved - ISAC elec. room gas cylinder | See attached TAPC 477 documentation. |
|
251
|
Friday, March 01, 2013, 11:35 |
David Wang | ITE | Maintenance | TM4 | | Leak check on ITE and TM4. | The
leak check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum vessel |
|
255
|
Friday, March 08, 2013, 15:50 |
Bevan Moss | ITE | Standard Operation | TM4 | CS Test Target #1 | Module Move from ITE to SHC | Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic |
|
279
|
Wednesday, March 27, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well. |
|
280
|
Wednesday, March 27, 2013, 11:49 |
David Wang | ITE | Standard Operation | TM4 | Sic LIS-RFQ | Connected TM4 in ITE | TM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after |
|
284
|
Wednesday, April 03, 2013, 12:26 |
David Wang | ITE | Maintenance | TM4 | Sic LIS/RFQ | Leak check on ITE TM4. | TM 4 had been leak check in ITE due to
relatively high PNG1 and IG1 readings.All
TM4 primary and secondary vessel air |
|
302
|
Wednesday, April 17, 2013, 10:35 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks back to ITE. | 5 shielding block had been moved
back to ITE. The ITE is configured to take
proton beam. |
|
343
|
Wednesday, May 15, 2013, 10:00 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th. |
|
353
|
Tuesday, May 21, 2013, 11:38 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo. |
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well. |
|
371
|
Wednesday, May 29, 2013, 06:32 |
David Wang | ITE | Standard Operation | TM4 | Ta#40 | TM4 has been connected in ITE. | TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday. |
|
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE | Dan an I transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam. |
|