1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam |
|
|
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. | Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
1068
|
Tuesday, September 15, 2015, 08:24 |
David Wang | South Hot-Cell | Repair | TM1 | UCx 13 | Leak check on TM1 window circuit soldering stems in service cap. | I did a leak check on TM1 window circuit
2 soldering stems in service cap.The
round side panel was opened for the job. |
|
|
1071
|
Thursday, September 17, 2015, 11:50 |
David Wang | Spent Target Vault | Repair | TM1 | | TM1 window circuit leak check | Leak check TM1 window circuit soldering
stems inside service cap when module is located
at NE silo. LD base LR 0.0xE-9atm.cc/sec. |
|
|
1075
|
Tuesday, September 22, 2015, 13:15 |
David Wang | South Hot-Cell | Standard Operation | | Ta#46 | Leak check on TM4 HS water line with new Ta#46 target. at SHC | Chad and I leak checked the HS line at
SHC. No leak. Leak rate 0.0xE-9atm.cc/sec. |
|
|
1078
|
Wednesday, September 23, 2015, 14:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS | Helium pressure test HS line at CS with
70 psi for 2 minutes. Base leak rate
0.0xE-9atm.cc/sec. No response. The line |
|
|
1079
|
Wednesday, September 23, 2015, 14:35 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | TM4 has been connected at CS | TM4 has been connected at CS. Turbo- pumps
and water system are started and running
. The HV cover has been installed on the |
|
|
1080
|
Thursday, September 24, 2015, 07:00 |
David Wang | Conditioning Station | Maintenance | TM4 | Ta#46 | Turned off TCS all vacuum pumps and water pumps. | TCS:MP1 back up pressure went up too high
(700mtorr).I turned off all the pumps.The
TCS is under vacuum still. TCS water |
|
|
1082
|
Friday, September 25, 2015, 07:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | weekly update see attachment |
|
|
1084
|
Monday, September 28, 2015, 10:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | Switched off CS vacuum pumps and water system | I switched off CS vacuum pumps and water
system after Isac opps finished the TM4 conditioning
at CS. |
|
|
1086
|
Tuesday, September 29, 2015, 12:31 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. The turbo-
pumps are started. Water supply to TM4 only
at this stage. Everything is good so far. |
|
|
1091
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
|
1092
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
|
1093
|
Tuesday, October 06, 2015, 13:00 |
David Wang | ITE | Repair | TM4 | | spark on top of TM4 in ITE | During the weekend condition The TM4 spark
at 30KV without vacuum response. It is confirmed
the spark is from the top TM4 this morning.The |
|
|
1094
|
Tuesday, October 06, 2015, 13:25 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update target hall schedule. See
attachment 1,2. |
|
|
1096
|
Thursday, October 08, 2015, 14:08 |
David Wang | South Hot-Cell | Standard Operation | TM3 | Dummy target febiad. | TM3 has been moved from SHC to NW silo | Bill and I moved TM3 from SHC to NW silo
with a dummy febiad target installed on it.
The move is smooth. |
|
|
1097
|
Tuesday, October 13, 2015, 10:53 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update schedule. TM3 evaluation
schedule in Nov is added.
update the schedule after the |
|
|
1098
|
Wednesday, October 14, 2015, 12:42 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been disconnected in ITW | Dan and I disconnected TM2 in ITW this
morning. |
|
|
1099
|
Wednesday, October 14, 2015, 12:44 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been moved from ITW to SHC | Bill and I remotely removed TM2 from ITW
to SHC. The move is smooth. |
|
|
1100
|
Wednesday, October 14, 2015, 12:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | TM2 ZrC#7 after run electrical check at SHC. | I did an electrical check on TM2 with ZrC
#7 on it. The EE is short to 60KV bias. See
attachment |
|