Thursday, November 19, 2020, 09:00, David Wang, Conditioning Station, Standard Operation, TM2, Nb#6, Helium pressure check on TM2 HS line at TCS.
|
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes. No leak. |
Tuesday, November 24, 2020, 09:37, Adam Newsome, ITW, Standard Operation, TM2, , Module Move
|
TM2 has been moved from the Conditioning Station to ITW. |
Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW
|
TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far. |
Monday, January 18, 2021, 12:29, David Wang, ITW, Standard Operation, TM2, Nb#9, ITW vacuum and TM2 water lines leak check .
|
ITW primary and secondary vacuum vessel leak check are done. There is a 5XE-8 atm.cc/sec leak on Exit service cap NW side square panel. The leak is small. And, it is close to ITW TP3 so it is not affect ion beam line vacuum during operation. We will replace the seal on the panel later. The rest leak check on air to vacuum seals are good. TM2 water lines are pressurized with 70 psi helium. We did it 3 hours after water lines are purged. No leak was showed during the check.
2021-02-24th: The o-ring on exit 1 NW side square panel is replaced by David Wang and Frank Song. |
Tuesday, January 19, 2021, 11:32, Travis Cave, Safe Module Parking, Standard Operation, TM2, Nb#9, Module move
|
TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP. |
Thursday, June 03, 2021, 08:20, David Wang, South Hot-Cell, Standard Operation, TM2, , Remotely remove TM2 from silo to shc
|
Remotely removed Tm2 from silo to SHC. The moving is smooth. |
Wednesday, June 09, 2021, 09:16, Travis Cave, North Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the SHC to the NHC. |
Wednesday, June 09, 2021, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 containment box leak check.
|
Chad installed containment box back to TM2 yesterday. We leak checked VCR joints on window line. No leak. |
Thursday, June 10, 2021, 14:54, David Wang, North Hot-Cell, Standard Operation, TM2, UCX33, UCX 33 on TM2 electical check at NHC.
|
TM2 UCX33# electrical check and leak check results. See attachment. |
Friday, June 11, 2021, 10:36, David Wang, Conditioning Station, Standard Operation, TM2, UCX33#, TM2 leak check at TCS
|
Leak checked TM2 service cap at TCS. helium pressure checked containment box window and HS cooling lines. No leak on service cap and waterlines. |
Tuesday, June 22, 2021, 15:35, David Wang, ITW, Standard Operation, TM2, UCX33#, TM2 has been connected it ITW.
|
TM2 has been connected it ITW. All turbo pumps are started. |
Wednesday, August 04, 2021, 17:24, David Wang, North Hot-Cell, Standard Operation, TM2, UCx34#, UCX 34# on TM2 electical check and HS leak check at NHC.
|
The job is done with Matt at NHC. All TGHT and TBHT bolts are torque wrench tight in NHC. HS leak check result is good.
helium pressurized HS line at TCS. No leak. |
Tuesday, September 21, 2021, 13:47, Travis Cave, North Hot-Cell, Standard Operation, TM2, UC#34, Module move
|
TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo. |
Monday, September 27, 2021, 14:29, Travis Cave, ITW, Standard Operation, TM2, Graphite #3, Module move
|
TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days. |
Monday, October 04, 2021, 09:27, Frank Song, ITW, Standard Operation, TM2, C#3, Module Connection   
|
TM2 been connected with new target C#3 in ITW. |
Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test
|
the test was done when TM2 sit on NHC. |
Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection
|
the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC. |
Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move
|
TM#2 was moved from ITW to SHC, then moved back to ITW. |
Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check
|
An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. |
Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection
|
TM2 with target UC#36 was connected at ITW. |
|