Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test
|
the test was done when TM2 sit on NHC. |
Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection
|
the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC. |
Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move
|
TM#2 was moved from ITW to SHC, then moved back to ITW. |
Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check
|
An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. |
Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection
|
TM2 with target UC#36 was connected at ITW. |
Wednesday, January 05, 2022, 12:45, Frank Song, ITW, Maintenance, TM2, UC#36, TM2 SIS with Target and No external Connections
|
electrical checked in ITW |
Thursday, January 06, 2022, 10:37, David Wang, ITW, Standard Operation, TM2, , ITW vacuum vessel and TM2 internal cooling lines leak check in pit.
|
Frank and I finished ITW and TM2 leak check. TM2 internal water-cooling lines are leak free. They passed 70 psi helium pressure test. We found some
small leaks on ITW primary and secondary vacuum vessel. I list them here:
Exit module 2 service cap top plate to cap body O-ring at SW corner. Leak rate 2XE-8 atm.cc/sec. It is an old leak we found |
Monday, January 10, 2022, 12:38, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITW to NHC.
|
Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful. |
Tuesday, January 11, 2022, 11:51, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from NHC to SMP.
|
TM2( no target ) has been moved from NHC to SMP. The moving is smooth and successful. |
Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target.
|
An electric check was done right after module moving from SMP to SHC. |
Monday, April 04, 2022, 21:04, Carla Babcock, Conditioning Station, Development, TM2, , HV testing of IGLIS wires in TM2
|
TM2 is in the TCS without containment box for HV testing following the installation of the IGLIS wiring.
Not great results so far - sat at 42.5kV for nearly 2 hours, current around 200uA and occasional sparks. I did not have time to go higher, will
do this tomorrow. The sparks could be conditioning but it looks a bit suspicious to me. We will see if the ramp up tomorrow is very easy and how high we |
Wednesday, April 13, 2022, 11:54, Carla Babcock, South Hot-Cell, Maintenance, TM2, , EZL cable change
|
Chad changed the EZL cable and plugs on TM2. New cable runs along the cable trays. |
Thursday, April 21, 2022, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM2, Febiad TEST, TM2 FEBIAD WITH A TEST TARGET
|
A Test Febiad Target was installed and checked at SHC. |
Thursday, April 28, 2022, 07:24, Frank Song, ITW, Standard Operation, TM2, Febiad Test Target, Module Connection
|
TM2 was connected in ITW with a Febiad Test Target. |
Thursday, April 28, 2022, 08:16, David Wang, ITW, Standard Operation, TM2, , Annual ITW water signal interlocks check .
|
Annual ITW water signal interlocks check was done with TM2 in ITW. Water signal interlocks on all water circuits related to TM and 2A beam
lines in ITW work fine. |
Wednesday, May 25, 2022, 13:43, Frank Song, ITW, Standard Operation, TM2, Febiad-Test, module disconnection
|
TM2 with a test target was disconnected in ITW. |
Monday, June 06, 2022, 14:15, Frank Song, South Hot-Cell, Standard Operation, TM2, SiC#42, TM2 FEBIAD with Target and No external Connections
|
An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. |
Tuesday, June 07, 2022, 14:15, Frank Song, ITE/ITW, Standard Operation, TM2, SiC#42, Module Connection
|
TM2 with Febiad target SiC#42 was connected in ITW. |
Thursday, June 09, 2022, 09:47, Matthew Gareau, South Hot-Cell, Repair, TM2, SiC#42, containment box repair, Einzle lens, multi pin
|
On June 2 2022, while attempting to install target SiC#42 a gasket fell off the water line. I attempted to remove the target to have the gasket reattached,
however the multi pin connector guide pin was loose and was preventing the target from being removed. During the attempt to remove the target it was noticed
that an electrical cable in the back of the module had become loose and was dangling. The target was then secured to the module, and then the module was |
Monday, June 20, 2022, 11:00, Frank Song, North Hot-Cell, Repair, TM2, SiC#42, Failed Sic#42 electrical measurement at NHC
|
An electrical check was done at NHC, see attachment pls. |
|