Entry  Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test IMG_3710.jpg
 the test was done when TM2 sit on NHC.
Entry  Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection IMG_4315.jpg
 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.
Entry  Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move 
TM#2 was moved from ITW to SHC, then moved back to ITW.
Entry  Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check IMG_4322.JPG
 An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. 
Entry  Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection IMG_4323.JPG
 TM2 with target UC#36 was connected at ITW.
Entry  Wednesday, January 05, 2022, 12:45, Frank Song, ITW, Maintenance, TM2, UC#36, TM2 SIS with Target and No external Connections TM2_with_UCx36.jpg
 electrical checked in ITW
Entry  Thursday, January 06, 2022, 10:37, David Wang, ITW, Standard Operation, TM2, , ITW vacuum vessel and TM2 internal cooling lines leak check in pit.  
Frank  and I finished ITW and TM2 leak check. TM2 internal water-cooling lines  are leak free. They passed 70 psi helium pressure test. We found some
 small leaks on ITW primary and secondary vacuum vessel. I list them  here:

    Exit  module 2 service cap top plate to cap body O-ring at SW corner. Leak  rate 2XE-8 atm.cc/sec. It is an old leak we found
Entry  Monday, January 10, 2022, 12:38, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITW to NHC. 
Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.
Entry  Tuesday, January 11, 2022, 11:51, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from NHC to SMP. 
TM2( no target ) has been moved  from NHC to SMP.  The moving is smooth and successful. 
Entry  Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target. TM2_without_UCx36_at_SHC_(2).jpg
 An electric check was done right after module moving from SMP to SHC. 
Entry  Monday, April 04, 2022, 21:04, Carla Babcock, Conditioning Station, Development, TM2, , HV testing of IGLIS wires in TM2 
TM2 is in the TCS without containment box for HV testing following the installation of the IGLIS wiring.
Not great results so far - sat at 42.5kV for nearly 2 hours, current around 200uA and occasional sparks. I did not have time to go higher, will
do this tomorrow. The sparks could be conditioning but it looks a bit suspicious to me. We will see if the ramp up tomorrow is very easy and how high we
Entry  Wednesday, April 13, 2022, 11:54, Carla Babcock, South Hot-Cell, Maintenance, TM2, , EZL cable change MicrosoftTeams-image_(25).png
Chad changed the EZL cable and plugs on TM2. New cable runs along the cable trays.
Entry  Thursday, April 21, 2022, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM2, Febiad TEST, TM2 FEBIAD WITH A TEST TARGET TEST_FEBIAD_TARGET_E_CHECK.jpg
 A Test Febiad Target was installed and checked at SHC. 
Entry  Thursday, April 28, 2022, 07:24, Frank Song, ITW, Standard Operation, TM2, Febiad Test Target, Module Connection module_connection_checklist20220426.jpg
 TM2 was connected in ITW with a Febiad Test Target. 
Entry  Thursday, April 28, 2022, 08:16, David Wang, ITW, Standard Operation, TM2, , Annual ITW water signal interlocks check . 
Annual ITW water signal interlocks check was done with TM2 in ITW.   Water signal interlocks on all water circuits related to TM and 2A beam
lines in ITW work fine.  
Entry  Wednesday, May 25, 2022, 13:43, Frank Song, ITW, Standard Operation, TM2, Febiad-Test, module disconnection tm2_disconnection.jpg
 TM2 with a test target was disconnected in ITW.
Entry  Monday, June 06, 2022, 14:15, Frank Song, South Hot-Cell, Standard Operation, TM2, SiC#42, TM2 FEBIAD with Target and No external Connections TM2_with_FEBIAD_SiC_42_electrical_check.jpg
 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 
Entry  Tuesday, June 07, 2022, 14:15, Frank Song, ITE/ITW, Standard Operation, TM2, SiC#42, Module Connection TM2_with_sic_42_connected_in_ITW.jpg
 TM2 with Febiad target SiC#42 was connected in ITW.
Entry  Thursday, June 09, 2022, 09:47, Matthew Gareau, South Hot-Cell, Repair, TM2, SiC#42, containment box repair, Einzle lens, multi pin 
On June 2 2022, while attempting to install target SiC#42 a gasket fell off the water line. I attempted to remove the target to have the gasket reattached,
however the multi pin connector guide pin was loose and was preventing the target from being removed. During the attempt to remove the target it was noticed
that an electrical cable in the back of the module had become loose and was dangling. The target was then secured to the module, and then the module was
Entry  Monday, June 20, 2022, 11:00, Frank Song, North Hot-Cell, Repair, TM2, SiC#42, Failed Sic#42 electrical measurement at NHC Failed_Sic#42_electrical_measurement_at_NHC.jpg
 An electrical check was done at NHC, see attachment pls.