Entry  Wednesday, September 02, 2015, 09:26, David Wang, ITE, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_shedule_129_Sep_to_Dec.xlsxTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
I attach new Target Hall schedules here for 2015 fall and winter runs (beam schedule 129). The TH excel sheet schedule for beam 129 is included also.
Weekly update of Target Hall Schedule.See Attachments 3,4
Entry  Tuesday, September 08, 2015, 10:11, David Wang, ITW, Standard Operation, TM2, ZrC, 5 Shielding blocks have been transferred from ITE to ITW. 
Maico and Dan moved 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam.
Entry  Tuesday, September 15, 2015, 08:24, David Wang, South Hot-Cell, Repair, TM1, UCx 13, Leak check on TM1 window circuit soldering stems in service cap. 
I did a leak check on TM1 window circuit  2 soldering  stems in service cap.The round side panel was opened for the job. I sprayed helium on
the stems for 10 seconds. The leak detector got a tiny response(from 0.0xE-9 atm.cc/sec to 2.0xE-9 atm.cc/sec). The test  repeated again. The second
time, LD climbed  to 1.2xE-9atm.cc/sec. It looks like there is a very tiny leak on the stems soldering spots. But , this is not the same leak we found
Entry  Thursday, September 17, 2015, 11:50, David Wang, Spent Target Vault, Repair, TM1, , TM1 window circuit leak check TM1_leak_soldering_stems_001.JPGTM1_leak_soldering_stems_003.JPG
 Leak check TM1 window circuit soldering stems inside service cap when module is located at NE silo. LD base LR 0.0xE-9atm.cc/sec.  Only 1
second tiny amount  helium sprayed on stems soldering joints . LD got a quick response to high E-7 atm.cc/sec.Test is repeated again with same result. 
See attachments
Entry  Tuesday, September 22, 2015, 13:15, David Wang, South Hot-Cell, Standard Operation, , Ta#46, Leak check on TM4 HS water line with new Ta#46 target. at SHC 
Chad and I leak checked the HS line at SHC. No leak. Leak rate 0.0xE-9atm.cc/sec.
Entry  Wednesday, September 23, 2015, 14:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#45, Helium pressure test on TM4 HS line at CS 
Helium pressure test HS line at CS with 70 psi for 2 minutes. Base  leak rate 0.0xE-9atm.cc/sec. No response. The line is leak tight.
Entry  Wednesday, September 23, 2015, 14:35, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, TM4 has been connected at CS 
TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good
so far.
Entry  Thursday, September 24, 2015, 07:00, David Wang, Conditioning Station, Maintenance, TM4, Ta#46, Turned off TCS all vacuum pumps and water pumps. 
TCS:MP1 back up pressure went up too high (700mtorr).I turned off all the pumps.The TCS is under vacuum still. TCS water  package cooling fans showed
error on control page.The water pumps are stopped  also.
Restarted the vacuum pumps 40 minutes after stopping. Everything is back to normal. The MP1 back up pressure need to be monitored frequently before
Entry  Friday, September 25, 2015, 07:56, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
weekly update see attachment
Entry  Monday, September 28, 2015, 10:10, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, Switched off CS vacuum pumps and water system 
I switched off CS vacuum pumps and water system after Isac opps finished the TM4 conditioning at CS.
Entry  Tuesday, September 29, 2015, 12:31, David Wang, ITE, Standard Operation, TM4, Ta#46, TM4 has been connected in ITE 
Dan and I connected TM4 in ITE. The turbo- pumps are started. Water supply to TM4 only at this stage. Everything is good so far.
Entry  Tuesday, October 06, 2015, 12:50, David Wang, ITE, Standard Operation, TM4, Ta#46, 5 Shielding blocks have been transferred from ITW to ITE. 
The ITE is configured to take proton beam.
Entry  Tuesday, October 06, 2015, 12:50, David Wang, ITE, Standard Operation, TM4, Ta#46, 5 Shielding blocks have been transferred from ITW to ITE. 
The ITE is configured to take proton beam.
Entry  Tuesday, October 06, 2015, 13:00, David Wang, ITE, Repair, TM4, , spark on top of TM4 in ITE 
During the weekend condition The TM4 spark at 30KV without vacuum response. It is confirmed the spark is from the top TM4 this morning.The flexible cables
in a  black wire sleeve which is used for febiad X pin connection drooped too close to the TM4 surface plate, and caused the sparking. The problem
is fixed by Anders and David. The cables is put back where it should stay.  After test, no sparking on the top.
Entry  Tuesday, October 06, 2015, 13:25, David Wang, ITE, Standard Operation, TM4, , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdf
Weekly update target hall schedule. See attachment 1,2.
Entry  Thursday, October 08, 2015, 14:08, David Wang, South Hot-Cell, Standard Operation, TM3, Dummy target febiad., TM3 has been moved from SHC to NW silo 
Bill and I moved TM3 from SHC to NW silo with a dummy febiad target installed on it. The move is smooth.
Entry  Tuesday, October 13, 2015, 10:53, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
Weekly update schedule. TM3 evaluation schedule in Nov is added.  
update the schedule after  the cancellation of TM2 from SHC to CS trip.see attachments 3,4
Entry  Wednesday, October 14, 2015, 12:42, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been disconnected in ITW  
Dan and I disconnected TM2 in ITW this morning.
Entry  Wednesday, October 14, 2015, 12:44, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been moved from ITW to SHC 
Bill and I remotely removed TM2 from ITW to SHC. The move is smooth.
Entry  Wednesday, October 14, 2015, 12:48, David Wang, South Hot-Cell, Standard Operation, TM2, ZrC#7, TM2 ZrC#7 after run electrical check at SHC. ZrC_#7_after_run_electrical_check.pdf
I did an electrical check on TM2 with ZrC #7 on it. The EE is short to 60KV bias. See attachment