  1834   Friday, November 30, 2018, 10:28 Travis CaveSpent Target VaultStandard Operation Ta#57Spent Target Move The spent Ta#57 target has been moved
from the south hot cell to the spent target
storage it was placed in pail 174 and placed
 Target_Index_2018-11-30.pdf 
  1855   Friday, January 11, 2019, 11:26 Travis CaveSpent Target VaultStandard Operation UC#25Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in pail 204 and placed in spot
 Target_Index_2019-01-11.pdf 
  1880   Friday, March 01, 2019, 10:23 Travis CaveSpent Target VaultStandard Operation  Source tray moved The old TM#2 source tray and TM#4
optics tray have been removed from the vault
and placed into the spent target storage
  
  1905   Friday, April 05, 2019, 13:44 chad fisherSpent Target VaultDevelopment  2019 Pail drop tests
    Drop test performed January
8, 2019 with 25 lb target, UN pail and lug
cover. Drop failed. Lug cover half removed.
  
  1910   Monday, April 29, 2019, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Spent targets moved to mini vault. The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front)
  
  1916   Thursday, May 02, 2019, 09:37 Travis CaveSpent Target VaultStandard Operation UC#26Spent Target Move The spent UC#26 target was moved
from the south hot cell to the spent target
vault. It was place in pail #209 and put
 Target_Index_2019-05-02.pdf 
  1937   Monday, June 10, 2019, 14:13 Travis CaveSpent Target VaultStandard Operation  Old TM#4 source tray moved The old TM#4 source tray in the south
hot cell was moved to the spent target vault.
The tray had a low of 7.5mSv/hr to a high
  
  1987   Wednesday, September 18, 2019, 14:28 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Three of the five targets in the
mini storage have been repackaged into the
stronger pail.
  
  1988   Thursday, September 19, 2019, 10:11 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on
  
  1989   Monday, September 23, 2019, 13:21 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new
 Target_Index_2019-09-23_Mini_Vault.pdf 
  1998   Thursday, October 03, 2019, 10:25 Travis CaveSpent Target VaultStandard Operation ZrC#8Spent Target Move The spent ZrC#8 was moved from the
south hot cell to the spent target vault.
It was placed in pail 217 and the pail was
 Target_Index_2019-10-02.pdf 
  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in
 Target_Index_2019-10-09.pdf 
  2008   Thursday, October 17, 2019, 11:49 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Loading F-308 The targets in the mini storage have
been loaded into the F-308.
  
  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move UC#28 has been moved from the south
hot cell to spent target storage. The target
was placed in pail number 219 and placed
 Target_Index_2019-10-28.pdf 
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details.
 Target_Index_2019-11-08.pdf 
  2029   Thursday, November 14, 2019, 13:52 Travis CaveSpent Target VaultStandard Operation UC#22,23,24Targets repackaged The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault
 Target_Index_2019-11-14_Mini_Vault.pdf 
  2036   Tuesday, December 03, 2019, 12:45 Adam NewsomeSpent Target VaultStandard Operation SiC#38SiC#38 in Pail 205 moved to Storage Vault: 4BSiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. 
 Target_Index_2019-12-03.pdf 
  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault. Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed
  
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  2069   Thursday, February 20, 2020, 09:27 David WangSpent Target VaultStandard Operation  Inventory of mini storage and vault.Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment
 Mini_Vault_2020-02-20.pdfVault__2020-02-20.pdf 