Entry  Monday, April 10, 2017, 11:23, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move 

 TM#1 has been moved from the conditioning station to the north west silo.  There was a slight delay in the move as the limits for the hoist drum got way out of whack and had to be adjusted.

Entry  Wednesday, April 12, 2017, 09:20, Travis Cave, South Hot-Cell, Repair, TM3, no target, Module move 

 TM#3 is now in the south hot cell.

Entry  Wednesday, April 12, 2017, 13:03, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical Check TM3_elec_chk_no_tgt.PDF

Electrical check of TM#3 with no target at the south hot cell

Entry  Wednesday, April 12, 2017, 16:39, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 Inspection at the South Hot Cell DSC_0886.JPGDSC_0883.JPG

Found spark signs on TM3's containment on the side of the water blocks. They may be OLD or/and NEW sparking signs, but this in not determined at this moment. Please see picture: first attachment. First and second attachment show the profiles of water block and HV lines.

Entry  Wednesday, April 26, 2017, 10:40, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the north east silo to the south hot cell.

Entry  Wednesday, April 26, 2017, 17:37, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere Pictures from April 19-21, 2017 DSC_0950.JPGDSC_0899.JPGSparkMarkEETM3.jpg


Please see the first two pictures of the HV test at atmosphere done on April 19.

First picture shows a big spark between the Extraction Electrode mounting plate holder (at HV) to the Ground Electrode. Please note minimum gap between these electrodes is 7.8mm.

However the biggest visible spark was noticed at the bottom screw hole. (It is difficult to determine if at the 7.8mm gap were concomitant sparks occurring.)This spark started at 22kV and became stable above 24kV.

On April 20, 2017 Chad inspected this area with the Hot Cell camera and found a spark mark on the Extraction Electrode holder plate at the bottom screw hole. See the third picture.

Again it is very difficult with the existing Hot Cell cameras to inspect the areas where the gap is small (at 7.8mm gap between the conical surfaces of the Ground Electrode and Extraction Electrode holder)

In the second picture there are 2 small sparks: one on the top and another one on the right side at the lines wrapped in Fiber Glass. These sparks started at 20kV.

On April 21 the HV test was repeated with the Containment box ON and the sparks occurred again, at the same locations and at the same voltage.

Entry  Wednesday, April 26, 2017, 17:55, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 Schedule updates at the South Hot Cell and CS April_–_May_2107_TM3_Updated_Schedule_at_the_SHC_and_TCS.docxApril_–_May_2107_TM3_Initial_Schedule_at_the_SHC_and_TCS.docx

Please see TM3's Updated Schedule (the current schedule) at the SHC and TCS.

For the record I am uploading TM3's Initial Schedule at the SHC and TCS.

Entry  Thursday, April 27, 2017, 19:59, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere for Each Line(s) April 27, 2017 

Today a HV test at atmosphere was performed for Each Line(s), while floating the other lines.

Please note the Einzel Lens line (Y) was grounded.

Tests performed:

1. Applied up to 29kV to "(A) OVEN -"

Sparks occurred at 29kV at the Fiber Glass inside the Service Tray; and at the right side at the lines wrapped in Fiber Glass.

2. Applied up to 29kV to "(B) OVEN +"

Sparks occurred at 29kV at the Fiber Glass inside the Service Tray.

3. Applied up to 6-7kV to "(C) TUBE -"

Could not identify the sparks; it was a continuous discharge.

4. Applied up to 6-7kV to "(D) TUBE +"

Sparks/discharges occurred at 6-7kV at the Fiber Glass on the right side at the lines wrapped in Fiber Glass. We had to turn OFF the lights in the Hot Cell to identify the small sparks.

5. Applied up to 4kV to "(P-Q) COIL +"

Discharge occurred at 4kV. Could not identify it.

6. Applied up to 29kV to "(R-U) COIL -"

Sparks occurred around 27-29kV at the Fiber Glass inside the Service Tray; and at the right side at the lines wrapped in Fiber Glass.

Tom saw a spark at 27kV between the Extraction Electrode holder and the Ground Electrode.

Saw also a spark at the Ring Alumina insulator in the Service Tray, located on top of the second comb insulator with Epoxi.

7. Applied up to 27kV to "(E) Cavity or MSP, (G) Gas, (J) Heat Shield" - all these are connected together at the BIAS voltage.

Sparks occurred at 27kV at the Fiber Glass inside the Service Tray.

8. Applied up to 23kV to "(I) EE" - this is for the Extraction Electrode.

Sparks occurred at 23kV again at the same spot near the bottom screw hole, between the Extraction Electrode holder and the Ground Electrode.

9. Applied up to 27kV to "(F) Plasma"- this is for the Anode.

Sparks occurred at 26-27kV again at the same spot near the bottom screw hole, between the Extraction Electrode holder and the Ground Electrode.

Entry  Sunday, April 30, 2017, 20:57, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS May_2107_TM3_Schedule_at_the_South_Hot_Cell_and_TCS.docx

Please see attachment for TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS.

Entry  Tuesday, May 02, 2017, 18:33, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017 

Today a HV test at atmosphere was performed for Each Line(s), while floating the other lines. THIS TEST AT ATMOSPHERE IS THE FIRST ONE AFTER THE FIBER GLASS WAS REMOVED.

Please note:

a). the Einzel Lens line (Y) was grounded.

b). after the fiber glass was removed the "R-U COIL" line and the "(F) Plasma" (which is the Anode line) were shorted to the BIAS voltage.

Tests performed:

1. Applied up to 32kV to "(A) OVEN -"

Sparks occurred at 32kV between the Extraction Electrode holder and the Ground Electrode.

2. Applied up to 33kV to "(B) OVEN +"

Sparks occurred at 33kV but we could not identify the spark location.

3. Applied up to 31kV to "(C) TUBE -"

Sparks occurred at 31kV between the Extraction Electrode holder and the Ground Electrode, at the top and the bottom.

4. Applied up to 30kV to "(D) TUBE +"

Sparks occurred at 30kV between the Extraction Electrode holder and the Ground Electrode, 2 spots at the bottom.

5. Applied up to 30kV to "(P-Q) COIL +"

Sparks occurred at 30kV between the Extraction Electrode holder and the Ground Electrode, all around.

6. Applied up to 30kV to "(R-U) COIL -", to "(F) Plasma" the Anode, to "(E) Cavity" or MSP, "(G) Gas", and  "(J) Heat Shield" - all these are "connected" together at the BIAS voltage.

Sparks occurred around 29-30kV at the Extraction Electrode holder and the Ground Electrode, at the bottom.

8. Applied up to 23kV to "(I) EE" - this is for the Extraction Electrode.

Sparks occurred at 23kV again at the same spot near the bottom, between the Extraction Electrode holder and the Ground Electrode.

 

Entry  Thursday, May 04, 2017, 19:10, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 HV test at TCS up to 50kV 

Today TM3 was conditioned up to 50kV. At 50kV sparking started and to go higher in voltage it needs more conditioning time. Lowered it to 49kV for the night.

Entry  Friday, May 05, 2017, 19:36, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 HV test at TCS up to 65kV 

Today TM3 HV conditioning went up to 65kV. I'll leave it here over night. ISAC OPS have instructions to keep an alarm on the HV, and ion gauge and turbo pump (TP2 tripped 3 times due to sparking).

Entry  Saturday, May 06, 2017, 13:30, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 current limiting  

Today the voltage was raised from 65kV to 65.7kV. After about 10min at this level TM3 started current limiting. TM3 was not sparking when this happened.

ISAC OPS turned it OFF and then tried to ramp it back ON, but could not do it due to the current limiting.

I turned OFF/ON the PS (locally) 20ming ago and and then tried to get it back from the Control Room, but around 4-5kV it started current limiting.

Turned everything OFF on EPICS for the time being. We'll investigate on Monday.

Over the night the sparking rate at 65kV was from 6 to 2 sparks per hour. It tripped OFF once over the night: backing valves closed, tripping the turbos, tripping IG1 and turning OFF the BIAS. At that time ISAC OPS got it back smoothly.

Entry  Thursday, July 13, 2017, 10:53, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the north east silo to the conditioning station.

Entry  Monday, July 31, 2017, 09:44, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved back to the NE silo from the conditioning station.

Entry  Friday, September 08, 2017, 11:20, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the north east silo to the conditioning station.

Entry  Friday, September 15, 2017, 14:12, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved back to the silo from the conditioning station.

Entry  Friday, September 22, 2017, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check TM2_notgt_elec_chk_shc_09212017.PDF

Electrical check of TM#2 after the insulator change on thursday september 21.

Entry  Tuesday, April 10, 2018, 10:43, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 

 TM#2 has been moved from the south hot cell to the south west silo.

Entry  Thursday, May 03, 2018, 08:24, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical Check TM4_Electrical_Check_notarget_May_2_2018.pdf

 The results of yesterdays electrical check of TM#4 with no target attached. See the attached PDF for details.