Thursday, June 18, 2020, 09:11, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move
|
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
Thursday, June 18, 2020, 13:22, David Wang, ITW, Standard Operation, TM2, C#1, Remove of TM2 from ITE to SHC.
|
Remotely remove TM2 from ITW to SHC. The move is good. Shielding plug is put back to ITW. |
Thursday, June 25, 2020, 09:45, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move
|
TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station. |
Friday, July 03, 2020, 06:57, David Wang, ITW, Standard Operation, TM2, C#1, TM2 CONNECTION CHECKLIST
|
SEE ATTACHMENTS. EVERYTHING IS GOOD. |
Monday, July 06, 2020, 12:20, David Wang, ITW, Standard Operation, TM2, C#1, Five shielding blocks to ITW
|
Five shielding blocks are transferred to ITW |
Friday, July 24, 2020, 09:43, Travis Cave, Conditioning Station, Maintenance, TM2, Graphite #1, Module move
|
TM#2 has been moved from the west station to the conditioning station. ITW entrance module moved will take place on Monday morning. |
Thursday, July 30, 2020, 09:57, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move
|
TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station. |
Tuesday, August 18, 2020, 09:06, David Wang, ITW, Standard Operation, TM2, , TM2 and ITW entrance module have been disconnected in ITW
|
Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later. |
Tuesday, August 18, 2020, 09:57, Adam Newsome, Conditioning Station, Standard Operation, TM2, , TM2 Moved to Conditioning Station
|
TM2 was moved from ITW to the Conditioning Station. |
Tuesday, August 25, 2020, 09:38, Travis Cave, South Hot-Cell, Standard Operation, TM2, Graphite #1, Module move
|
TM#2 with Graphite #1 has been moved from the conditioning station to the south hot cell. |
Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC.
|
Electrical check and leak check at SHC. NO leak. electrical check ok. Before target on, A is short to PQ, RU is short to HS ( 60KV bias) as we measured before. |
Thursday, August 27, 2020, 08:21, David Wang, Conditioning Station, Standard Operation, TM2, Ta#60, Helium pressure check on TM2 HS line at TCS.
|
Helium pressurize on TM2 HS line at TCS is done. Base LR is 0.0X E-9 atm.cc/sec. 70 psi helium 3 minutes. No response. Also, The TCS vacuum pumping down over night is good. |
Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2
|
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve. |
Thursday, August 27, 2020, 13:18, Anders Mjos, Conditioning Station, Maintenance, TM2, , New Power Supply installed for TGHT
|
Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for remote operation and tested successfully with low current (30 A). |
Friday, September 11, 2020, 11:25, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW. |
Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
TM#2 with Ta#60 is now in the south hot cell. |
Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC
|
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good. |
Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move
|
TM#2 with C#2 has been moved from the south hot cell to the West Target Station. |
Tuesday, November 17, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , Module Move
|
TM2 has been moved from ITW to the South Hot Cell.
Reading at ITW: 114 mSv/hr
Reading at SHC: 85 mSv/hr |
Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check.
|
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. |
|