ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  744   Wednesday, September 10, 2014, 07:12 David WangITWRepairTM1 Removed ITW HS and COIL flow rate monitors.Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits
  
  586   Wednesday, January 22, 2014, 10:51 David WangITERepair  Removed 4 shielding blocks located on top of preseperator in THTravis and I removed 4 shielding blocks
located on top of pre-seperator  in
TH. This is a job for ITE harp 9 re-installation
  
  2205   Thursday, March 25, 2021, 10:38 David WangSpent Target VaultStandard Operation C#1Remove pail 237 spent target C#1 from storage vault to mini storage. Pail 237 only has 200u sv/hr field at 0.5
meter. On contact measurement: 0.9 to 1.6
m sv/hr.and less than 80 count contamination
  
  2070   Wednesday, February 26, 2020, 08:45 David WangConditioning StationStandard OperationTM4 Remove of TM4 from TCS to SW siloTM4 has been moved from TCS to SW silo.
The move is fine. 
  
  2060   Wednesday, February 05, 2020, 10:49 David WangConditioning StationStandard OperationTM4 Remove of TM4 from SHC to TCS.TM4 has been moved from SHC to TCS. No
target on module. The move is successful.
  
  2076   Wednesday, March 04, 2020, 14:30 David WangSafe Module ParkingStandard OperationTM2 Remove of TM2 from SMP to SHC.Frank and I removed TM2 from SMP to SHC.
The move is successful. 
  
  2106   Thursday, June 18, 2020, 13:22 David WangITWStandard OperationTM2C#1Remove of TM2 from ITE to SHC.Remotely remove TM2 from ITW to SHC. The
move is good.  Shielding plug is put
back to ITW. 
  
  800   Tuesday, November 25, 2014, 11:33 David WangSouth Hot-CellDevelopment  Remove UCX 11 target transfer stand from SHC back to TH.The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week
  
  2336   Wednesday, June 22, 2022, 09:03 David WangITEStandard OperationTM4UCX37# P2NRemotely removed TM2 from ITE to NHCTM2 with UCx#37 P2N target  was removed
from ITE to NHC yesterday morning. The move
is good. 
  
  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.Remotely remove TM4(Ta#63) from TCS to
ITE. The move is smooth and successful. 
  
  2232   Thursday, July 08, 2021, 11:36 David WangConditioning StationStandard OperationTM4Ta#62Remotely remove TM4(Ta#62) from SHC to TCS.Remotely remove TM4 (ta# 62) from SHC to
TCS.  The moving is smooth. 
  
  2220   Monday, May 31, 2021, 11:28 David WangITEStandard OperationTM4 Remotely remove TM4 from silo to shcRemotely remove tm4 from silo to shc. The
moving is smooth.
  
  2209   Wednesday, April 21, 2021, 10:32 David WangSouth Hot-CellStandard OperationTM3 Remotely remove TM3 from SHC to siloOn 2021-04-19, Frank and I remotely removed
Tm3 from SHC to silo . The moving is successful.
  
  2222   Thursday, June 03, 2021, 08:20 David WangSouth Hot-CellStandard OperationTM2 Remotely remove TM2 from silo to shcRemotely removed Tm2 from silo to SHC.
The moving is smooth. 
  
  2235   Tuesday, July 20, 2021, 09:46 Adam NewsomeITEStandard OperationTM4 Remotely moved TM4 from TCS to ITETM4 was moved from the conditioning station
to the East target station. 
  
  2276   Wednesday, November 24, 2021, 09:08 Adam NewsomeConditioning StationStandard OperationTM4 Remotely moved TM4 from SHC to TCSTM4 was moved from the South Hot Cell to
the Conditioning Station. 
  
  2790   Friday, April 11, 2025, 13:46 chad fisherNorth Hot-CellRepair  Remote end 9**4 repairTong cable on remote arm 9**4 has be relocated
onto its pulleys and tong opening adjusted
at the tong cable drum by changing the position
  
  375   Tuesday, June 04, 2013, 15:34 Bevan MossConditioning StationRepair  Relay replacedESC was called out again to inspect the
chiller as it was showing the same problem
as before. This time when started one fan
  
  2211   Wednesday, April 21, 2021, 11:18 David WangCoolingMaintenance  Refilling high active wtaer system and starting HA water pumps. High active water system is refilled. Air
are drained out of  system before pump
to be started. Following sequence are used
  
  2140   Thursday, August 27, 2020, 09:42 Anders MjosConditioning StationMaintenanceTM2Ta#60Refilled TK2Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve.
  