  1968   Friday, August 16, 2019, 14:23 Carla BabcockITERepairTM2ZrC#8TM2 electrical checks in ITE

Ramped voltage on TM2 up to 30kV with no problems. Bias current is at 29uA, same as original TM2 bias current (see archiver for ITE June 15th, before protons) and similar to 31uA right after protons went off on Aug. 6.

TGHT=0A

TBHT=0A

BIAS V=30kV

BIAS current = 29uA

EZL V= 15kV

EZL current= 51uA

EE V= 1kV

EE current= 0.952mA

IG1= 8.6e-7

protons=0

This seems ok despite poor electrical checks showing 300 MOhm resistance between HV and ground. These values indicate a resistance of 1 GOhm. Let's see what happens when protons are on.

For future (optimistic) reference when testing protons:

BIAS=35kV, 35uA

EZL-17.5kV, 60uA

BIAS=38kV, 37uA

EZL=18.5kV, 63uA

  1986   Tuesday, September 17, 2019, 07:37 Carla BabcockITEDevelopmentTM2ZrC#8end of run HV investigations

Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA

Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias

Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable

Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....

Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off

Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins

Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+

Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable

More things but forgot to write them down. Spreadsheet attached.

Attachment 1: HVtests_TM2_Sept172019.xlsx
  1991   Monday, September 30, 2019, 11:36 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Module move

 TM#2 with ZrC#8 has been moved from the east station to the south hot cell.

  1992   Monday, September 30, 2019, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check

 Results of the electrical check on TM#2 with ZrC#8 post beam.

Attachment 1: TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf
TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf
  1993   Tuesday, October 01, 2019, 09:23 Don JacksonITEMaintenanceTM2ZrC #860KV Common Connections

1 Jumpers between 60KV common and FEBIAD lines were connected in an unusual way.  This should of had no impact on the ZrC run but would have to be corrected for any future FEBIAD runs.

2 Feedthrough U was mislabeled (label has been removed)

 

Attachment 1: TM2_Wiring.jpg
TM2_Wiring.jpg
  1994   Tuesday, October 01, 2019, 10:22 chad fisherSouth Hot-CellStandard OperationTM2ZrC#8ZrC#8 Removed Ta#59 installed

ZrC#8 has been removed from TM2. Upon removal of the high current tube heater bolts it was noticed that the tube was broken. Also the 9 pin connector has an arc mark (see pictures attached).

Ta#59 has been installed with new fasteners. High current fasteners torqued to 130 in lbs.

Attachment 1: 20190930_140918[1].jpg
20190930_140918[1].jpg
  1995   Tuesday, October 01, 2019, 14:38 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check

 The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module.

Attachment 1: TM2_no_target_SHC_elec_chk_Oct-1-2019.pdf
TM2_no_target_SHC_elec_chk_Oct-1-2019.pdf
Attachment 2: TM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
TM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
  1996   Tuesday, October 01, 2019, 16:30 Anders MjosConditioning StationStandard OperationTM2Ta#58Conditioning of Ta#58

Tuesday, October 01, 2019, 15:15: Started roughing.

Tuesday, October 01, 2019, 16:30: Started TPs

Tuesday, October 01, 2019, 16:34: All TPs at speed


Conditioning completed over the weekend by RIB operations. The shutter was left closed on the module, so no beam could be seen on the FC. Conditioning otherwise OK.

  2000   Friday, October 04, 2019, 16:43 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS.

TM2 has been connected at TCS this morning. helium pressure test on Tm2 HS line is done. No leak.

  2002   Monday, October 07, 2019, 09:56 Adam NewsomeITEStandard OperationTM2Ta 59TM2 Move

TM2 has been moved from the Conditioning Station to ITE with Ta#59 target.

  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Attachment 1: Ta_59_TM2_ITE__connection_checklist..pdf
Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf
  2020   Thursday, October 31, 2019, 10:17 David WangAssembly/Bench TestMaintenanceTM2 Febiad target gas line leak check.

Feibiad gas line for ITE and its adapter fittings for TM2 are tested today by installing them on a dummy water stem. No leak on VCO fitting, adapter o-rings, and all Swagelock fittings of this assembly. Manual valve on gas line works fine.  The positional check on gas line between TM2 and ITW will be fulfilled next Tuesday during module disconnection. 

  2021   Tuesday, November 05, 2019, 10:19 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Module move

 TM#2 with Ta#59 has been moved from the ITE to the south hot cell.

  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklist

See attachment

Attachment 1: Ta#59_disconnection_checklist.pdf
Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf
  2023   Tuesday, November 05, 2019, 12:46 chad fisherSouth Hot-CellStandard OperationTM2ta#59Ta#59 removed

Ta#59 has been removed from TM2 and it is now ready for electrical check.

  2024   Tuesday, November 05, 2019, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check

 Results of the electrical check of TM#2 with the old Ta#59 target and target free.

Attachment 1: Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdf
Attachment 2: Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
Elec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.

Helium pressure leak check on TM2 HS line at TCS is done. No leak. Also, Helium are sprayed to gas line adapter and fittings. No leak. TM2 is connected at TCS. Anode plug on TCS is connected to module 52pin connector. Water system is started. Vacuum pumping down is good. HV cover will be installed today.

  2026   Thursday, November 07, 2019, 10:39 Anders MjosConditioning StationStandard OperationTM2SiC#38Conditioing SiC#38

Thursday, November 07, 2019, 10:35: Tested source to 30 A on TGHT, TBHT and COIL. ANODE at 100 V.


Tuesday, November 12, 2019

The FEBIAD source worked well over the weekend. The anode current limit was adjusted twice to stop voltage limiting. About 5E-8 A on the FC with TGHT=580A, TBHT=300A, ANODE=200V,150 mA, COIL=50A. Bias was conditioned to 30 kV

Attachment 1: SiC#38_ANODE_bias_2019-11-07.PNG
SiC#38_ANODE_bias_2019-11-07.PNG
  2027   Tuesday, November 12, 2019, 10:02 Adam NewsomeITEStandard OperationTM2SiC#38TM2 Move

TM2 was moved from the Conditioning Station to ITE, with SiC#38 target.

  2030   Tuesday, November 19, 2019, 13:41 David WangITEStandard OperationTM2SiC 38# febiadTM2 SiC#38 connection check list.

TM2 was connected in ITE 12th Nov. attach checklist

Attachment 1: SiC_#_38_febiad_connection_checklist.pdf
SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf SiC_#_38_febiad_connection_checklist.pdf