  321   Wednesday, April 24, 2013, 11:48 chad fisherSouth Hot-CellRepairTM3 TM3 Source Tray RemovalWork on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed,
  
  322   Wednesday, April 24, 2013, 14:09 chad fisherSouth Hot-CellRepairTM3 TM3 Refurbishment E.O.D. Optics tray has been removed from module.
Waterblock jig installation has commenced.
Of note, jig installation on TM3 has proven
  
  323   Friday, April 26, 2013, 11:20 chad fisherSouth Hot-CellRepairTM3 Water Block Jig (back half)The back half of the water block jig (services
tray side) has been sucessfully located onto
the module.
  
  324   Friday, April 26, 2013, 14:31 chad fisherSouth Hot-CellRepairTM3 TM3 refurb E.O.D.Service tray side of the waterblock jig
is installed and all locking tabs enagaed
save the heat shield circuit. Locking tab
 IMG_1039.JPG 
  325   Monday, April 29, 2013, 15:58 Bevan MossSouth Hot-CellRepairTM3 Source Tray RemovalChad removed the source tray from TM3  today,
see attached picture (video was also taken).
There was some interference between the window
 20130429_TM3_SOURCE_TRAY_REMOVAL_IMG_0620.JPG 
  326   Tuesday, April 30, 2013, 07:47 chad fisherSouth Hot-CellRepairTM3 TM3 Source Tray RemovalThe source tray has sucessfully been removed
from TM3.
I will put a report in the TM3 rev
 IMG_1043[1].JPG 
  327   Tuesday, April 30, 2013, 07:51 chad fisherSouth Hot-CellRepairTM3 Coil line flow checkDavid and I checked circuits p and q (the
water cooled coil ciruit) for flow this morning
as, with the source tray still in the module,
  
  328   Thursday, May 02, 2013, 10:09 chad fisherSouth Hot-CellRepairTM3 Service tray water block leak checkDavid and I preformed a helium leak check
on the service tray waterblocks and verify
that no damage had been done during jig installation.
  
  329   Friday, May 03, 2013, 09:53 chad fisherSouth Hot-CellRepairTM3 9 pin connector wiringWith the aid of nic new manipulator snap
fingers made by Maico the peek cable ties
restraining the 9 pin connector wiring to
 IMG_1047[1].JPGIMG_1048[1].JPGIMG_1050[1].JPG 
  330   Monday, May 06, 2013, 15:45 Bevan MossConditioning StationRepairTM3 55 pin connector removedTravis and I removed the 55 pin connector
from the service cap today. The feed through
was left in place as a new design for the
 20130506_55_pin_conector_removal_IMG_3530.JPG20130506_55_pin_conector_removal_IMG_3525.JPG20130506_55_pin_conector_removal_IMG_3532.JPG20130506_55_pin_conector_removal_IMG_3535.JPG 
  331   Tuesday, May 07, 2013, 12:07 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW.Water interlock check  on ITW is done.
All water signals are strong on EL panel. 
ITW is configured to take proton beam.
  
  332   Wednesday, May 08, 2013, 10:12 chad fisherSouth Hot-CellRepairTM3 TM3 9 pin wiring removalThe 9 pin wiring has successfully been
removed from TM3.
 IMG_1055[1].JPG 
  333   Wednesday, May 08, 2013, 13:48 chad fisherSouth Hot-CellRepairTM3 IMG wiring checkChecks of the wiring for the IMG are complete
and have passed.
  
  334   Thursday, May 09, 2013, 10:13 chad fisherSouth Hot-CellDevelopment  Mock-up ProgressThe source tray for the mock-up has been
setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the
 IMG_1056[1].JPGIMG_1057[1].JPGIMG_1058[1].JPG 
  335   Thursday, May 09, 2013, 14:23 chad fisherSouth Hot-CellRepairTM3 Water Block Jig RemovalThe source tray side of the water block
jig has been removed in preparation for moving
the module to the  conditioning station
 IMG_1059[1].JPG 
  336   Friday, May 10, 2013, 09:26 chad fisherSouth Hot-CellRepairTM3 Containment box reinstalledthe containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for
 IMG_1062[1].JPGIMG_1063[1].JPG 
  343   Wednesday, May 15, 2013, 10:00 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th.
  
  345   Wednesday, May 15, 2013, 10:20 Bevan MossConditioning StationRepair  Roof top chiller failedI have been getting a fault on the roof
top chiller for the 2 tandem 7.5  ton chillers.
I have checked and we have water flow and
  
  346   Wednesday, May 15, 2013, 10:25 Bevan MossConditioning StationRepair  ONICON flow meter Scott Adair from Riada sales came
to site to complete diagnostics on the ONICON
flow meter. He could not determine the problem
  
  347   Wednesday, May 15, 2013, 16:21 Bevan MossConditioning StationRepair  BIAS Current readings off by a factor of 5 A special thanks to Kazuya, Jane
and Ray who jumped on this issue right  away!
The limit of the BIAS PS was set as 20000uA
  