333
|
Wednesday, May 08, 2013, 13:48 |
chad fisher | South Hot-Cell | Repair | TM3 | | IMG wiring check | Checks of the wiring for the IMG are complete
and have passed. |
|
334
|
Thursday, May 09, 2013, 10:13 |
chad fisher | South Hot-Cell | Development | | | Mock-up Progress | The source tray for the mock-up has been
setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the |
![IMG_1056[1].JPG IMG_1056[1].JPG](attachment.png) ![IMG_1057[1].JPG IMG_1057[1].JPG](attachment.png) |
335
|
Thursday, May 09, 2013, 14:23 |
chad fisher | South Hot-Cell | Repair | TM3 | | Water Block Jig Removal | The source tray side of the water block
jig has been removed in preparation for moving
the module to the conditioning station |
|
336
|
Friday, May 10, 2013, 09:26 |
chad fisher | South Hot-Cell | Repair | TM3 | | Containment box reinstalled | the containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for |
![IMG_1062[1].JPG IMG_1062[1].JPG](attachment.png) |
343
|
Wednesday, May 15, 2013, 10:00 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th. |
|
345
|
Wednesday, May 15, 2013, 10:20 |
Bevan Moss | Conditioning Station | Repair | | | Roof top chiller failed | I have been getting a fault on the roof
top chiller for the 2 tandem 7.5 ton chillers.
I have checked and we have water flow and |
|
346
|
Wednesday, May 15, 2013, 10:25 |
Bevan Moss | Conditioning Station | Repair | | | ONICON flow meter | Scott Adair from Riada sales came
to site to complete diagnostics on the ONICON
flow meter. He could not determine the problem |
|
347
|
Wednesday, May 15, 2013, 16:21 |
Bevan Moss | Conditioning Station | Repair | | | BIAS Current readings off by a factor of 5 | A special thanks to Kazuya, Jane
and Ray who jumped on this issue right away!
The limit of the BIAS PS was set as 20000uA |
|
349
|
Wednesday, May 15, 2013, 17:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | | TM3 in place but not connected | To confirm that the sparking was
coming from the module rather than the conditioning
station TM3 was grounded and the conditioning |
|
351
|
Friday, May 17, 2013, 10:04 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Manipulator has been sucessfully repaired.
Recieved 0.19 mSv. Took Approx. 10-20 minutes |
|
352
|
Friday, May 17, 2013, 12:02 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | | module move | TM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo. |
|
359
|
Thursday, May 23, 2013, 14:07 |
Bevan Moss | Conditioning Station | Repair | | | Chiller Unit Repaired | ESC came today and "repaired"
the chiller. There was something wrong with
the VFD controller. The were able to get |
|
361
|
Thursday, May 23, 2013, 14:12 |
Bevan Moss | Conditioning Station | Maintenance | | | Primary Circuit Drained and Flushed | Rob Walker has drained the primary
side of the conditioning station. It will
be flushed, filled and chemically treated. |
|
363
|
Monday, May 27, 2013, 10:37 |
Bevan Moss | Conditioning Station | Maintenance | TM4 | | Cooling Systems topped off | Rob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary |
|
364
|
Monday, May 27, 2013, 11:55 |
chad fisher | South Hot-Cell | Standard Operation | | | Special Tooling for RFQ target | The special tool made for the RFQ target
autopsy has been inserted into the hot cell.
|
|
365
|
Monday, May 27, 2013, 15:59 |
Bevan Moss | Conditioning Station | Repair | | | Compressor fault | Once again the 7.5 compressors are
tripping due to faults. I believe it is due
to over pressure as a result of the chiller |
|
366
|
Monday, May 27, 2013, 16:01 |
Bevan Moss | Conditioning Station | Repair | | | CanBUS card | During HV conditioning of TM4 with
Ta#40 there was a spark at ~43 kV that caused
the Bias card to "fry". Dave Morris |
|
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE | Dan an I transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam. |
|
375
|
Tuesday, June 04, 2013, 15:34 |
Bevan Moss | Conditioning Station | Repair | | | Relay replaced | ESC was called out again to inspect the
chiller as it was showing the same problem
as before. This time when started one fan |
|
376
|
Tuesday, June 11, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. | Dan and I disconnected TM1 in ITW. |
|