  2808   Friday, May 23, 2025, 13:12 chad fisherManipulator MaintenanceRepair  SHC West manipulator tong cable replacementBroken tong cable on West manipulator (serial
#8106) replaced.
Wrist joint with broken cable was
  
  2718   Monday, November 18, 2024, 12:18 Aaron TamSouth Hot-CellRepair  SHC West Manipulator Repair  November 14, 2024 - Aaron Tam w/
Chad Fisher 
Following ID:
  
  2779   Wednesday, February 26, 2025, 09:59 David WangSouth Hot-CellStandard Operation  SHC Field measurement from TH After waste transfer, I did a SHC field
measurement from TH through top flange opening.
The general field around manipulator maintenance
  
  2772   Wednesday, February 19, 2025, 10:07 Travis CaveSpent Target VaultStandard Operation SHC Active TrashSHC Active Trash Active trash was placed into an unmarked
pail and place in spot 7C of the vault the
pail measured 321uSv/hr when removed from
 Target_Index_2025-02-19.pdf 
  2778   Tuesday, February 25, 2025, 09:42 Travis CaveSpent Target VaultStandard Operation SHC Active TrashSHC Active Trash Another pail of active trash was
move to the spent target vault from the south
hot cell. 800uSv/hr, place in spot 7A see
 Target_Index_2025-02-25.pdf 
  2558   Wednesday, April 03, 2024, 10:48 chad fisherSouth Hot-CellMaintenance  SE Manipulator wrist swapOn April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position
 original_but_incorrect_cable_routing_E-HD_manipulators.JPG 
  1465   Monday, March 27, 2017, 12:55 David WangSpent Target VaultRepair  S/W silo rust clean upRust on S/W silo and cover plate stored
at silo area are cleaned up.
 rust_removal_at_sw_silo_001.JPGrust_removal_at_sw_silo_002.JPGrust_removal_at_sw_silo_003.JPGrust_removal_at_sw_silo_004.JPGrust_removal_at_sw_silo_005.JPG 
  1456   Tuesday, March 21, 2017, 11:59 David WangConditioning StationRepairTM4 Rust inpsection on TM4 service cap inside surface and shielding plug surface. Yasmine and I did a rust inpsection on
TM4 service cap inide surface and shielding
plug surface. No rust has been found. Also,
 11x 
  1665   Wednesday, December 06, 2017, 09:33 Anders MjosConditioning StationMaintenance  Running chiller for maintenance tech Dakine is on site to do maintenance
on the chiller. The tech requested the chiller
to operate.
  
  2111   Friday, June 26, 2020, 10:43 Adam NewsomeSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault and mini-storage drive systemsAn inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality
 IMG_20200626_092538.jpgIMG_20200626_093208.jpgIMG_20200626_093924.jpgIMG_20200626_093951.jpg 
  2320   Wednesday, May 11, 2022, 16:29 Nadia JorgensonSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault An
inspection was performed on drive systems
for the main storage vault by Dan McDonald,
 Motor_wiring_ISAC_storage_vault.jpg 
  288   Thursday, April 04, 2013, 12:07 Bevan MossConditioning StationStandard OperationTM1Ta #39Roughing started Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak
  
  289   Thursday, April 04, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM1Ta #39Roughing started

    

       
            
  
  2061   Wednesday, February 05, 2020, 10:54 David WangConditioning StationStandard OperationTM4 Roughing out TM4 at TCS.TCS MP1 is started to rough out TM4 and
TCS. TCS and TM4 will be under roughing only
today and tomorrow. No plan to start TCS
  
  307   Friday, April 19, 2013, 10:51 Bevan MossConditioning StationStandard OperationTM3N/ARoughing Started 10:48With the Turbo pump replaced I have started
roughing at 10:48
  
  261   Wednesday, March 13, 2013, 15:26 Bevan MossConditioning StationDevelopmentTM4CS Test Target #1Roughing Started Roughing pumps were turned on at
15:23 13/03/2013.
  
  339   Friday, May 10, 2013, 11:28 Bevan MossConditioning StationStandard OperationTM3No Source TrayRoughing Started Roughing on TM3 was started at 11:26am
today
  
  511   Friday, October 18, 2013, 14:37 Bevan MossConditioning StationStandard OperationTM4 Roughing Started The roughing pump has been started.   
  386   Tuesday, June 25, 2013, 14:56 Bevan MossConditioning StationStandard OperationTM1UCx#6Roughing Pumps Started The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo
  
  345   Wednesday, May 15, 2013, 10:20 Bevan MossConditioning StationRepair  Roof top chiller failedI have been getting a fault on the roof
top chiller for the 2 tandem 7.5  ton chillers.
I have checked and we have water flow and
  