  1983   Tuesday, September 10, 2019, 14:04 David WangITWStandard Operation  ITW water interlock check.ITW water interlock check is finished.
Everything is good. 
  
  1984   Thursday, September 12, 2019, 09:26 David WangITWRepairTM4 ITW bad vacuum issue and trouble shoot.ITW secondary vacuum was bad in last two
days after TM4 was connected in ITW. Today
when check the exit 2 module, I found a small
  
  1985   Friday, September 13, 2019, 13:36 David WangITWStandard OperationTM4UCX27TM4 conenction in ITW checklistTM4 was connected in ITW this Tuesday.
See attachment for checklist.
 TM4_UCx27_connection_checklist.pdf 
  2011   Wednesday, October 23, 2019, 06:56 David WangITWStandard OperationTM4UCX 28TM4 UCx 28 disconnection checklistTM4 was disconnected in ITW.  See
checklist.
 UCx_28_disonnection_CL.pdf 
  2013   Thursday, October 24, 2019, 14:11 Travis CaveITWStandard OperationTM4UC#29Module move TM#4 with UC29 has been moved from
the south hot cell to the west target station.
  
  2018   Wednesday, October 30, 2019, 11:18 David WangITWStandard OperationTM4UCx 29UCx 29 connection checklistSee attachment  UCx_29_connection_checklist.pdf 
  2042   Tuesday, January 07, 2020, 09:37 David WangITWStandard Operation  5 shielding blocks are moved out of ITW top.5 shielding blocks are moved out of itw
top. 
  
  2051   Friday, January 24, 2020, 08:19 David WangITWStandard OperationTM4 ITW water signal interlock check.ITW water signal interlock check is done.
Everything works fine. ITW 2A2 tank water
signal is broken and is not ok on XT2A2 
  
  2054   Thursday, January 30, 2020, 10:22 David WangITWStandard OperationTM4  TM4 water lines helium pressure leak check.   TM4 internal water lines helium
pressure leak check at ITW : 70psi helium
5 minutes on  each circuits. Base leak
  
  2055   Thursday, January 30, 2020, 12:06 David WangITWStandard OperationTM4 ITW primary and secondary vacuum seals leak check. Connected LD to ITW(TM4) TP1. Base LR 0.0Xe-9
atm.cc/sec. Base pressure 0.0Xe-4 torr. All
ITW primary and secondary air to vacuum seals
  
  2056   Monday, February 03, 2020, 09:10 David WangITWStandard OperationTM4 ITW TPs are switched off. started of ITW argon venting.ITW is argon venting now.
Argon venting of ITW is done. It
took about 4.0 to 4.5 hours to vent the ITW
  
  2057   Monday, February 03, 2020, 09:14 David WangITWStandard OperationTM4UCx 29TM4 UCx 29 disconnection checklist TM4 has been disconnected in ITW. See attachment
checklist. 
 UCx29__disconnection_checklist.pdf 
  2095   Friday, May 22, 2020, 13:26 David WangITWRepair  ITW water leak.A water leak was found on a fitting connecting
ITW dump return line pressure gauge on top
of exit module. TM tank flange, o-ring slot
 itw_water_leak_001.JPGitw_water_leak_005.JPGitw_water_leak_009.JPGitw_water_leak_013.JPG 
  2105   Thursday, June 18, 2020, 09:11 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2106   Thursday, June 18, 2020, 13:22 David WangITWStandard OperationTM2C#1Remove of TM2 from ITE to SHC.Remotely remove TM2 from ITW to SHC. The
move is good.  Shielding plug is put
back to ITW. 
  
  2110   Thursday, June 25, 2020, 09:45 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after.  We changed both
  
  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST SEE ATTACHMENTS. EVERYTHING IS GOOD.  TM2_C#1_CONNECTION_CHECKLIST.pdf 
  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITWFive shielding blocks are transferred to
ITW
  
  2130   Wednesday, July 29, 2020, 09:20 Travis CaveITWMaintenance  Entrance module move The West Entrance module has been
moved from the south hot cell back to the
West Target Station.
  