1921
|
Wednesday, May 15, 2019, 16:06 |
Isaac Earle | Safe Module Parking | Development | | | SMP module support flange installed and leak checked | The SMP module support flange sub-assembly
(IRH1755) was installed today according to
drawing IRH1683. Dow Corning 111 sealing |
   |
2745
|
Thursday, January 09, 2025, 11:46 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | SMP is under vacuum for TM4 storage during shut down. | SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down. |
|
2007
|
Tuesday, October 15, 2019, 16:42 |
Isaac Earle | Safe Module Parking | Development | | | SMP flange alignment tested using shield plug | As a preliminary test in preparation
for SMP commissioning, one of the steel module
shield plugs was installed into the SMP to |
   |
2639
|
Friday, July 12, 2024, 08:51 |
Riley Sykes | Safe Module Parking | Maintenance | | | SMP chain guard | SS washers were added to all slotted
holes on SMP chainguard cover plate |
|
1970
|
Friday, August 23, 2019, 14:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP camera video cabling installed and tested | Installation of the video lines for
the SMP cameras was completed yesterday according
to IRH1670 Rev B. All four cameras |
|
2037
|
Thursday, December 12, 2019, 14:39 |
Isaac Earle | Safe Module Parking | Development | | | SMP assembly shifted 1.0" north | The SMP assembly was shifted approximately
1.0" north today by pushing it, braced
against the south wall, using a 100 Ton capacity |
|
2109
|
Tuesday, June 23, 2020, 10:56 |
David Wang | Safe Module Parking | Standard Operation | | | SMP annual service. | Dan and I did the SMP annual maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains, |
|
2017
|
Tuesday, October 29, 2019, 10:00 |
Adam Newsome | Safe Module Parking | Development | | | SMP Updates to E-stop circuit and feedback signals | The SMP main control panel and remote control
module were updated in order to implement
the following items which were deemed desirable |
|
1971
|
Tuesday, August 27, 2019, 13:12 |
Adam Newsome | Safe Module Parking | Development | | | SMP Remote Control Wiring Inspection | The wiring for the SMP remote control module
was inspected by Joel Semilla (TRIUMF electrician).
The module was plugged in to verify there |
|
2006
|
Thursday, October 10, 2019, 16:17 |
Adam Newsome | Safe Module Parking | Development | | | SMP Main Panel: Relay Addition for E-Stop Circut | An update was made for the E-stop and power
supply system in the SMP main panel. Upon
testing remote control, it was determined |
 |
1925
|
Friday, May 17, 2019, 16:46 |
Adam Newsome | Safe Module Parking | Development | | | SMP Controls Installation Update |
The following controls-related |
   |
2068
|
Friday, February 14, 2020, 14:13 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SIS dummy target for IGLIS TM4 electrical check | Electrical check and HS, window leak check
result at SHC. See attachment. |
|
1358
|
Thursday, September 22, 2016, 13:04 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I leak checked the TM4 HS line
after new target installation. base leak
rate:0.0Xe-9 atm.cc/sec. No response |
|
1387
|
Tuesday, November 01, 2016, 14:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I did a leak check on TM4 HS line
with new Ta target installed. Base leak rate
0.0xE-9 atm.cc/sec. base pressure 0.0XE-4. |
|
1226
|
Tuesday, May 10, 2016, 13:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on window line and HS line. | Chad and I leak checked the TM2 HS and
window lines after new target installation.
The window line was very easy pumped down |
|
1332
|
Wednesday, August 24, 2016, 10:44 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I leak checked Tm2 Hs line with
new target installed. Base LR 0.0Xe-9 atm.cc/sec.
No leak has been found. This line will be |
|
1381
|
Monday, October 24, 2016, 14:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is |
|
1403
|
Wednesday, November 23, 2016, 16:10 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray
2 seconds on each joint and 10seconds flushing |
|
1488
|
Tuesday, April 11, 2017, 14:06 |
David Wang | Conditioning Station | Standard Operation | TM4 | | SHC, TM2 leak check on HS line. | Chad and I did leak check on TM1 HS line
at SHC. 0.0XE-9 atm.cc/sec. No leak. |
|
1591
|
Wednesday, August 02, 2017, 15:13 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | HS line is leak checked at SHC this afternoon
by helium spay. Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 |
|