Message ID: 1226     Entry time: Tuesday, May 10, 2016, 13:54
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: SHC, TM2 leak check on window line and HS line. 

Chad and I leak checked the TM2 HS and window lines after new target installation.  The window line was very easy pumped down on LD. But, The HS line only could pumped to 2-3 torr at first. Chad changed the VCR gaskets on HS line(target). It solved the problem. The LD could pumped  both of Window and HS lines to the bottom scale. Chad sprayed lots helium around the VCR joints.  No leak has been found. WE will do helium pressurizing test on them at TCS.