1288
|
Monday, July 18, 2016, 14:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS |
Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good. Helium pressure test on TM3 water lines(except GE, HS, and Window) were done. Leak detector has no response at 0.0xE-9 atm.cc/sec. They are leak free. |
1287
|
Monday, July 18, 2016, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 is now in the south hot cell. |
1286
|
Thursday, July 14, 2016, 13:25 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
Anders Mjos wrote: |
Plant Services group (Tony) will contact a service tech on Monday.
Water system will be switched off over the weekend.
|
Thursday, July 14, 2016, 13:24: Claus from Daikin is on site to troubleshoot.
The VFD driven fan motor has failed. Temporarily blocked air-flow through failed fan to improve air-flow to radiator. A new motor will be ordered (Curtis).
Thursday, July 14, 2016, 15:39: Stopped cooling system for the day
Friday, July 15, 2016, 08:16: Cooling system started
Friday, July 15, 2016, 15:00; Cooling system stopped. |
1285
|
Thursday, July 14, 2016, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) |
Update TH schedule 130 according to mini-shut down change.See attachment 1,2,3,4 |
Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
|
|
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
|
Attachment 3: Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
|
|
Attachment 4: Target_Hall_shedule_129_Sep_to_Dec.xlsx
|
1284
|
Wednesday, July 13, 2016, 08:47 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the north east silo to the conditioning station. |
1283
|
Tuesday, July 12, 2016, 12:42 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) |
Update schedule weekly.Attachment 1,2 |
Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
|
|
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
|
1282
|
Tuesday, July 12, 2016, 12:40 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW |
All turbo-pumps are started. Everything is good so far. |
1281
|
Tuesday, July 12, 2016, 09:59 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the conditioning station to the west target station. |
1280
|
Monday, July 11, 2016, 10:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48 | Spent Target move |
The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr when measured at the hot cell. See the attached PDF for the latest results. |
Attachment 1: Vault_Storage_July_11_2016.pdf
|
|
1279
|
Friday, July 08, 2016, 16:56 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
Plant Services group (Tony) will contact a service tech on Monday.
Water system will be switched off over the weekend. |
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS |
I connected TM2 to TCS and started water system. |
1277
|
Wednesday, July 06, 2016, 15:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#33 | Conditioning SiC#33 |
Wednesday, July 06, 2016, 15:23: RGA on. IGs on
Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.
Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature
Monday, July 11, 2016, 09:38: BIAS / EL / EE to 10 / 5 / 1 kV
Monday, July 11, 2016, 09:41: BIAS / EL / EE to 20 / 10 / 1.5 kV
Monday, July 11, 2016, 09:47: BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, July 11, 2016, 10:01: BIAS / EL / EE to 40 / 20 / 2.0 kV - one spark at 40 kV
Monday, July 11, 2016, 10:38: BIAS / EL / EE to 45 / 22.5 / 2.0 kV - conditioning from 40 kV
Monday, July 11, 2016, 10:40: BIAS / EL / EE to 45 / 22.5 / 2.3 kV
Monday, July 11, 2016, 12:21 : No sparks for the last 60 min.
Monday, July 11, 2016, 12:21: BIAS / EL / EE off to investigate TGHT / TBHT PS problem (power surge this morning)
Monday, July 11, 2016, 13:07: Power cycled TGHT / TBHT PS. Alarm cleared. Tested both to 10 A |
Attachment 1: SiC#33.docx
|
Attachment 2: TCS-2016-07-06-SiC#33.rga
|
1276
|
Wednesday, July 06, 2016, 14:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 turbo-pumps have been started. |
The TCS and TM2 are pumping down. |
1275
|
Wednesday, July 06, 2016, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station. |
1274
|
Wednesday, July 06, 2016, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 and SiC#33 | Electrical Check |
Electrical check done on TM#2 with Ta#48, no target and SiC#33 the short on the coils to 60kV is still present it is on the R-U coil line. See attached PDFs for details. |
Attachment 1: TM2_elechk_Ta48_SHC_postbeam.PDF
|
|
Attachment 2: TM2_elechk_SiC33_SHC.PDF
|
|
Attachment 3: TM2_elechk_notgt_SHC.PDF
|
|
1273
|
Wednesday, July 06, 2016, 09:16 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#33 | Ta#48 removed SiC#33 installed |
Ta#48 has been removed from TM2 and SiC#33 installed. |
1272
|
Wednesday, July 06, 2016, 07:06 |
David Wang | Conditioning Station | Standard Operation | | | venting TCS with argon. |
I switched off the vacuum pumps and vented TCS with argon. The TCS will be ready to accept TM2 this afternoon. |
1271
|
Wednesday, July 06, 2016, 07:03 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was connected in ITW. |
TM2 was disconnected in ITW and moved to SHC. |
1270
|
Thursday, June 30, 2016, 13:33 |
Dan McDonald | Spent Target Vault | Maintenance | | | F308's |
The five spent target F308 flasks where gone through in accordance with Nordion guidelines, the sixth spare is remains in the Hot Cell area. All flasks where in reasonable shape with two needing weld repairs on the pallets. I replaced all the 3/4" pallet to flask fasteners with new Grade 8 bolts nut and washer combo. Flasks have been moved into the Hot Cell area awaiting movement into the Target Hall. |
1269
|
Tuesday, June 28, 2016, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent target assay. |
The spent target assay were finally started or re-started today. Four targets were done today.
June 29 2016 another four targets were done today.
June 30 2016 all targets have assayed and measured. see the attached PDFs for the results. |
Attachment 1: Vault_Storage_June_30_2016.pdf
|
|
Attachment 2: Mini_Vault_Storage_June_30_2015.pdf
|
|