  1288   Monday, July 18, 2016, 14:14 David WangConditioning StationRepairTM3 TM3 leak checked at TCS

Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good.  Helium pressure test on  TM3 water lines(except GE, HS, and Window) were done. Leak detector has no response at 0.0xE-9 atm.cc/sec. They are leak free.

  1287   Monday, July 18, 2016, 13:56 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moved

TM#3 is now in the south hot cell.

  1286   Thursday, July 14, 2016, 13:25 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

Anders Mjos wrote:

Plant Services group (Tony) will contact a service tech on Monday.

Water system will be switched off over the weekend.

Thursday, July 14, 2016, 13:24: Claus from Daikin is on site to troubleshoot.

The VFD driven fan motor has failed. Temporarily blocked air-flow through failed fan to improve air-flow to radiator. A new motor will be ordered (Curtis).

Thursday, July 14, 2016, 15:39: Stopped cooling system for the day


Friday, July 15, 2016, 08:16: Cooling system started

Friday, July 15, 2016, 15:00; Cooling system stopped.

  1285   Thursday, July 14, 2016, 10:54 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)

Update TH schedule 130 according to mini-shut down change.See attachment 1,2,3,4

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
Attachment 3: Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
Target_Hall_shedule_130_Apr_to_Sep_2016.pdf Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
Attachment 4: Target_Hall_shedule_129_Sep_to_Dec.xlsx
  1284   Wednesday, July 13, 2016, 08:47 Travis CaveConditioning StationStandard OperationTM3no targetmodule moved

TM#3 has been moved from the north east silo to the conditioning station.

  1283   Tuesday, July 12, 2016, 12:42 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)

Update schedule weekly.Attachment 1,2

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
  1282   Tuesday, July 12, 2016, 12:40 David WangITWStandard OperationTM2 TM2 has been connected in ITW

All turbo-pumps are started. Everything is good so far.

  1281   Tuesday, July 12, 2016, 09:59 Travis CaveITWStandard OperationTM2SiC#33module moved

TM#2 with SiC#33 has been moved from the conditioning station to the west target station.

  1280   Monday, July 11, 2016, 10:59 Travis CaveSpent Target VaultStandard Operation Ta#48Spent Target move

The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr when measured at the hot cell. See the attached PDF for the latest results.

Attachment 1: Vault_Storage_July_11_2016.pdf
Vault_Storage_July_11_2016.pdf Vault_Storage_July_11_2016.pdf Vault_Storage_July_11_2016.pdf Vault_Storage_July_11_2016.pdf
  1279   Friday, July 08, 2016, 16:56 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

Plant Services group (Tony) will contact a service tech on Monday.

Water system will be switched off over the weekend.

  1278   Friday, July 08, 2016, 08:20 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS

I connected TM2 to TCS and started water system.

  1277   Wednesday, July 06, 2016, 15:23 Anders MjosConditioning StationStandard OperationTM2SiC#33Conditioning SiC#33

 Wednesday, July 06, 2016, 15:23: RGA on. IGs on


Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.


Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature

Monday, July 11, 2016, 09:38: BIAS / EL / EE to 10 / 5 / 1 kV

Monday, July 11, 2016, 09:41: BIAS / EL / EE to 20 / 10 / 1.5 kV

Monday, July 11, 2016, 09:47: BIAS / EL / EE to 30 / 15 / 1.5 kV

Monday, July 11, 2016, 10:01: BIAS / EL / EE to 40 / 20 / 2.0 kV - one spark at 40 kV

Monday, July 11, 2016, 10:38: BIAS / EL / EE to 45 / 22.5 / 2.0 kV - conditioning from 40 kV

Monday, July 11, 2016, 10:40: BIAS / EL / EE to 45 / 22.5 / 2.3 kV

Monday, July 11, 2016, 12:21 : No sparks for the last 60 min.

Monday, July 11, 2016, 12:21: BIAS / EL / EE off to investigate TGHT / TBHT PS problem (power surge this morning)

Monday, July 11, 2016, 13:07: Power cycled TGHT / TBHT PS. Alarm cleared. Tested both to 10 A

Attachment 1: SiC#33.docx
Attachment 2: TCS-2016-07-06-SiC#33.rga
  1276   Wednesday, July 06, 2016, 14:25 David WangConditioning StationStandard OperationTM2 TCS and TM2 turbo-pumps have been started.

The TCS and TM2 are pumping down.

  1275   Wednesday, July 06, 2016, 13:38 Travis CaveConditioning StationStandard OperationTM2SiC#33module moved

TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station.

  1274   Wednesday, July 06, 2016, 09:59 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48 and SiC#33Electrical Check

Electrical check done on TM#2 with Ta#48, no target and SiC#33 the short on the coils to 60kV is still present it is on the R-U coil line. See attached PDFs for details.

Attachment 1: TM2_elechk_Ta48_SHC_postbeam.PDF
TM2_elechk_Ta48_SHC_postbeam.PDF
Attachment 2: TM2_elechk_SiC33_SHC.PDF
TM2_elechk_SiC33_SHC.PDF
Attachment 3: TM2_elechk_notgt_SHC.PDF
TM2_elechk_notgt_SHC.PDF
  1273   Wednesday, July 06, 2016, 09:16 chad fisherSouth Hot-CellStandard OperationTM2SiC#33Ta#48 removed SiC#33 installed

Ta#48 has been removed from TM2 and SiC#33 installed.

  1272   Wednesday, July 06, 2016, 07:06 David WangConditioning StationStandard Operation  venting TCS with argon.

I switched off the vacuum pumps and vented TCS with argon. The TCS will be ready to accept TM2 this afternoon.

  1271   Wednesday, July 06, 2016, 07:03 David WangITWStandard OperationTM2 TM2 was connected in ITW.

TM2 was disconnected in ITW and moved to SHC.

  1270   Thursday, June 30, 2016, 13:33 Dan McDonaldSpent Target VaultMaintenance  F308's

The five spent target F308  flasks where gone through in accordance with Nordion guidelines, the sixth spare is remains in the Hot Cell area. All flasks where in reasonable shape with two needing weld repairs on the pallets. I replaced all the 3/4" pallet to flask fasteners with new Grade 8 bolts nut and washer combo. Flasks have been moved into the Hot Cell area awaiting movement into the Target Hall.

  1269   Tuesday, June 28, 2016, 14:42 Travis CaveSpent Target VaultStandard Operation ManySpent target assay.

The spent target assay were finally started or re-started today. Four targets were done today.

June 29 2016 another four targets were done today.

June 30 2016 all targets have assayed and measured. see the attached PDFs for the results.

Attachment 1: Vault_Storage_June_30_2016.pdf
Vault_Storage_June_30_2016.pdf Vault_Storage_June_30_2016.pdf Vault_Storage_June_30_2016.pdf Vault_Storage_June_30_2016.pdf
Attachment 2: Mini_Vault_Storage_June_30_2015.pdf
Mini_Vault_Storage_June_30_2015.pdf Mini_Vault_Storage_June_30_2015.pdf Mini_Vault_Storage_June_30_2015.pdf Mini_Vault_Storage_June_30_2015.pdf
ELOG V2.9.2-2455