Entry  Wednesday, July 06, 2016, 09:59, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#48 and SiC#33, Electrical Check TM2_elechk_Ta48_SHC_postbeam.PDFTM2_elechk_SiC33_SHC.PDFTM2_elechk_notgt_SHC.PDF
Entry  Wednesday, July 06, 2016, 09:16, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#33, Ta#48 removed SiC#33 installed 
Entry  Wednesday, July 06, 2016, 07:06, David Wang, Conditioning Station, Standard Operation, , , venting TCS with argon. 
Entry  Wednesday, July 06, 2016, 07:03, David Wang, ITW, Standard Operation, TM2, , TM2 was connected in ITW. 
Entry  Thursday, June 30, 2016, 13:33, Dan McDonald, Spent Target Vault, Maintenance, , , F308's 
Entry  Tuesday, June 28, 2016, 14:42, Travis Cave, Spent Target Vault, Standard Operation, , Many, Spent target assay. Vault_Storage_June_30_2016.pdfMini_Vault_Storage_June_30_2015.pdf
Entry  Monday, June 27, 2016, 13:45, David Wang, ITE, Standard Operation, , , 5 Shielding blocks have been transferred from ITW to ITE. 
Entry  Tuesday, June 21, 2016, 13:47, Travis Cave/ Dan McDonald, Spent Target Vault, Repair, , , Spent Target Vault Door 
Entry  Wednesday, June 15, 2016, 09:39, Travis Cave, Spent Target Vault, Standard Operation, , Ta#47, Spent Target move Vault_Storage_June_15_2016.pdf
Entry  Tuesday, June 14, 2016, 11:20, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected in ITE 
Entry  Tuesday, June 14, 2016, 10:51, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved 
Entry  Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS 
Entry  Thursday, June 09, 2016, 10:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Entry  Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS 
Entry  Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS TM4_withUCx16_helium_pressure_test_at_TCS.pdf
Entry  Wednesday, June 08, 2016, 08:25, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#16, Conditioning UC#16 UC#16.docxTCS-2016-06-08_UC#16.rga
Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 
Entry  Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS. 
Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf
Entry  Tuesday, June 07, 2016, 11:42, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#47, electrical check on TM4 with old Ta target at SHC. electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdfelectrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf