  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move Both the west entrance module and
TM#2 with Ta#60 have been moved back into
ITW.
  
  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move TM#2 with Ta#60 is now in the south
hot cell.
  
  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move TM#2 with C#2 has been moved from
the south hot cell to the West Target Station.
  
  2168   Tuesday, November 24, 2020, 09:37 Adam NewsomeITWStandard OperationTM2 Module MoveTM2 has been moved from
the Conditioning Station to ITW. 
  
  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITWTM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far.
 TM2_Nb#9_module_connection_checklist.pdf 
  2178   Monday, January 18, 2021, 12:29 David WangITWStandard OperationTM2Nb#9ITW vacuum and TM2 water lines leak check .ITW primary and secondary vacuum vessel
leak check are done. There is a 5XE-8 atm.cc/sec
leak on Exit service cap NW side square panel. 
  
  2182   Monday, January 25, 2021, 12:33 David WangITWStandard Operation  ITW bias HV testRamp up ITW bias to 57KV. no spark. 200uA
leaking current at 57KV. The test is done
without target module in station.  
  
  2194   Thursday, March 04, 2021, 11:20 David WangITWMaintenance  ITW water flow wheels and coils replacement.ITW water flow wheels and coils are replaced.
Wheels and coils on Oven, Tube, HS, EE, MSP,
Febiad coil, containment box window, dump,dump
  
  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW. TM2 has been connected it ITW.  All
turbo pumps are started. 
  
  2242   Thursday, August 12, 2021, 14:13 Adam NewsomeITWRepair  West Entrance Module Move to ITWThe West Entrance Module has been moved
from the South Hot Cell to the West Target
Station.
  
  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target
  
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection TM2 been connected with new target
C#3 in ITW. 
 IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg 
  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection the module TM2 with target C#3 was
disconnected at ITW and is being remoted
moving to SHC.
 IMG_4315.jpg 
  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection TM2 with target UC#36 was connected
at ITW.
 IMG_4323.JPG 
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections electrical checked in ITW  TM2_with_UCx36.jpg 
  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit. Frank  and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines 
are leak free. They passed 70 psi helium
  
  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal
  
  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.   Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up
  
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection TM2 was connected in ITW with a Febiad
Test Target. 
 module_connection_checklist20220426.jpg 
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .Annual ITW water signal interlocks check
was done with TM2 in ITW.   Water
signal interlocks on all water circuits related
  