2320
|
Wednesday, May 11, 2022, 16:29 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault | An
inspection was performed on drive systems
for the main storage vault by Dan McDonald, |
|
288
|
Thursday, April 04, 2013, 12:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started | Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak |
|
289
|
Thursday, April 04, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started |
|
|
2061
|
Wednesday, February 05, 2020, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Roughing out TM4 at TCS. | TCS MP1 is started to rough out TM4 and
TCS. TCS and TM4 will be under roughing only
today and tomorrow. No plan to start TCS |
|
307
|
Friday, April 19, 2013, 10:51 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Roughing Started 10:48 | With the Turbo pump replaced I have started
roughing at 10:48 |
|
261
|
Wednesday, March 13, 2013, 15:26 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Roughing Started | Roughing pumps were turned on at
15:23 13/03/2013. |
|
339
|
Friday, May 10, 2013, 11:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Roughing Started | Roughing on TM3 was started at 11:26am
today |
|
511
|
Friday, October 18, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Roughing Started | The roughing pump has been started. |
|
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started | The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo |
|
345
|
Wednesday, May 15, 2013, 10:20 |
Bevan Moss | Conditioning Station | Repair | | | Roof top chiller failed | I have been getting a fault on the roof
top chiller for the 2 tandem 7.5 ton chillers.
I have checked and we have water flow and |
|
1511
|
Thursday, April 27, 2017, 16:58 |
Isaac Earle | North Hot-Cell | Development | | | Right side NHC manipulator installed | Installation of the NHC right side
manipulator was completed yesterday. The
three piece manipulator was assembled in |
|
462
|
Tuesday, September 24, 2013, 14:46 |
Bevan Moss | South Hot-Cell | Repair | | | Right manipulator repair | |
|
486
|
Wednesday, October 02, 2013, 13:44 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Right Coil is leaking | Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the |
|
2512
|
Thursday, December 21, 2023, 09:37 |
Ferran Boix Pamies | ITE | Development | | | Rewiring of TC multiping wires | Thursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger |
|
1962
|
Wednesday, August 14, 2019, 11:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 and no target. | Results of electrical checks post beam at the south hot cell. | Here are the results of the electrical
done at the south hot cell post beam of with
the Ta#58 target attached and with just the |
|
1681
|
Monday, January 22, 2018, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Restarted TM3 vacuum sysytem after site power bump | All TCS and TM3 vacuum pumps are
started successfully. |
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|
2093
|
Wednesday, May 20, 2020, 13:19 |
David Wang | ITE | Maintenance | | | Restart of ITE turbo pumps. | PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up |
|
614
|
Thursday, March 06, 2014, 12:59 |
David Wang | Conditioning Station | Maintenance | TM1 | | Restart TM1 and CS TPs | Restarted TM1 and CS turbo pumps after
the power off. Everything is fine . |
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|