  1308   Monday, August 08, 2016, 11:24 chad fisherSouth Hot-CellMaintenance  Anteroom Clean-up - Waveguide

The wave guide from TM3 has been surveyed, swiped and removed from the anteroom and transported to rad waste for disposal. The wave guide has been stored in the anteroom since its removal.

  1307   Friday, August 05, 2016, 14:13 Isaac EarleNorth Hot-CellDevelopment  Preparations for NHC Ventilation Test

A hole was drilled in the NHC exhaust duct in the east end of the target hall above the hatch to the Ante Room.  This will be used for measuring NHC exhaust flow rate with a thermal anemometer.  The hole was tapped and plugged with an NPT tap.

Flow was measured in the existing hole in the SHC exhaust duct in approximately the same location.  Flow velocity was measured to be 1415 ft/min with the lid on the SHC.  Using duct ID 7.75", and assuming the average flow velocity is 90% of the flow at duct center, the flow rate was found to be 417cfm.  We will attempt to match this figure for the NHC when the ventilation tests are performed.  The tests have been scheduled for the maintenance day on Tuesday August 9th.

The anemometer probe and SHC test port plug were checked for contamination: none found.

  1306   Friday, August 05, 2016, 13:50 chad fisherSouth Hot-CellMaintenance  Anteroom clean out

Some items have been removed from the anteroom in preparation for painting. Items have been placed on plastic in the south hot cell service area. No contamination found so far.

  1305   Thursday, August 04, 2016, 08:56 Travis CaveSpent Target VaultStandard Operation UC#16Spent Target move

The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details.

Attachment 1: Vault_Storage_August_3_2016.pdf
Vault_Storage_August_3_2016.pdf Vault_Storage_August_3_2016.pdf Vault_Storage_August_3_2016.pdf Vault_Storage_August_3_2016.pdf
  1304   Wednesday, August 03, 2016, 10:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#17Electrical Check

The result of yesterdays electrical check on TM#4 with UC#17.

Attachment 1: TM4_elechk_UC17_SHC.PDF
TM4_elechk_UC17_SHC.PDF
  1303   Wednesday, August 03, 2016, 09:56 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)

Update schedule weekly. See attachments 1,2

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.mpp
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.

I started TCS water system and installed HV cover onto TM4.  The TM4 containment box is supplied with water also. TM4 is ready for conditioning at TCS.

  1301   Wednesday, August 03, 2016, 09:45 David WangConditioning StationStandard OperationTM4UC#17Helium pressure test on TM4 HS line at TCS

Helium pressure test on TM4 HS line at TCS  is done.Leak detector 0.0X E-9atm.cc/sec.  5minutes, 70psi helium.    No response on LD.

  1300   Wednesday, August 03, 2016, 09:15 chad fisherSouth Hot-CellRepair  Manipulator

East manipulator on the south hot cell is showing signs of eminent wrist/tong cable failure. Some slight slippage was noted yesterday and confirmed by a snapping sound and more slippage tomorrow.

  1299   Wednesday, August 03, 2016, 08:08 Anders MjosConditioning StationStandard OperationTM4UC#17Conditioning UC#17

Wednesday, August 03, 2016, 08:08: RGA on

Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)

Wednesday, August 03, 2016, 11:25: PS on

Wednesday, August 03, 2016, 11:32: BIAS / EL / EE to 20 / 10 / 1 kV

Ramping set to 40 / 20 A at 1 / 0.5 A/min. Good / bad vacuum at 2.0 / 2.2 E-6 T (IG2). Vacuum too high.

Wednesday, August 03, 2016, 13:02: BIAS / EL / EE to 30 / 15 / 1.5 kV

Wednesday, August 03, 2016, 15:59: BIAS / EL / EE to 35 / 17.5 / 1.5 kV. Some conditioning from 30 kV


Chiller staging stopped working around midnight. TGHT and TBHT ramped down by ISAC operators.

Thursday, August 04, 2016, 08:14: Ramping target to 50 / 25 A

Thursday, August 04, 2016, 08:22: Cycled power on chiller to reset alarm. Repeated again 5 min later

Thursday, August 04, 2016, 08:37: BIAS / EL / EE to 30 / 15 / 1.5 kV

Thursday, August 04, 2016, 09:36: Continue ramping to 100 / 50 A

Thursday, August 04, 2016, 11:32: Continue ramping to 120 / 60 A

Thursday, August 04, 2016, 14:50: ramping down


Friday, August 05, 2016, 07:09: Started cooling system

Friday, August 05, 2016, 07:56: Started ramping to 100 / 50 A

Friday, August 05, 2016, 14:27: TGHT / TBHT at 253 / 126 A.

Friday, August 05, 2016, 14:30: Ramping down at 2 / 1 A/min

Friday, August 05, 2016, 15:27: BIAS / EL / EE off


Monday, August 08, 2016, 08:15: Continue ramping. : BIAS / EL / EE to 30 / 15 / 1.5 kV

Monday, August 08, 2016, 14:36 TGHT / TBHT at 260 / 130 A. Ramping down at 2 / 1 A/min

Monday, August 08, 2016, 15:30: BIAS / EL off. EE remains at 1 kV.

Monday, August 08, 2016, 22:56: RGA off. Water system fault. Running CP1 manually

Monday, August 08, 2016, 22:57: EE off.

Monday, August 08, 2016, 22:58: Vacuum off

Attachment 1: UC#17.docx
Attachment 2: TCS-2016-08-03_UC#17.rga
Attachment 3: TCS-2016-08-08_UC#17.rga
  1298   Tuesday, August 02, 2016, 15:22 David WangConditioning StationStandard OperationTM4UC#17TM4 with new target has been connected at TCS

It is being pumped now at TCS.

  1297   Tuesday, August 02, 2016, 14:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#17module moved

TM#4 with UC#17 is now in the conditioning station.

  1296   Tuesday, August 02, 2016, 13:32 chad fisherSouth Hot-CellStandard OperationTM4UC#16UC#16 Removed #17 installed

UCx#16 has been removed from TM$ and UCx#17 installed, high current conductors toqued to 130 in lbs.

 

UCx#16 did not show the standard arcing marks on the 9 pin connector.

In regards to the 9 pin connector on number 17, it was by far the best fitting TM4 target with 9 pin as it required no "fiddling" during installation.

  1295   Tuesday, August 02, 2016, 11:02 Travis CaveITEStandard OperationTM4UC#16module moved

TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas.

  1294   Friday, July 29, 2016, 14:27 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Measurements & Cleanup

 The North Hot Cell was accessed today via the Ante Room for inspection, measurements, and clean-up.  There were no modules in the SHC or TCS, and no spent targets in the SHC.  Under these conditions the maximum field in the NHC was approximately 2μSv/hr.  The inside of the cell was cleaned and swept, followed by a floor swipe to check for contamination (none found).  All areas of the ante room floor were also swiped:  no contamination found.

 


The following measurements were taken in the NHC for comparison with the Soldiworks model:

SHC/NHC feedthrough panel fastener size:  1/4"-20,  1/2" long
NHC west wall to east edge of SEG block:  33-1/4" on south side, 33" on north side
NHC west wall to furthest extent of TCS (IRH1170): 40"
NHC west wall to wall indentation for viewing window: 46-7/8"
NHC west wall to end of existing ventilation duct: 4-1/8"

 

  1293   Thursday, July 28, 2016, 11:27 Travis CaveConditioning StationStandard OperationTM3no targetmodule moved

TM#3 with no target has been moved from the conditioning station to the NE silo.

  1292   Tuesday, July 26, 2016, 11:22 chad fisherSouth Hot-CellMaintenance  Soth Hot Cell Waste Storage Vault Tunnel

The two 45 gal (m) drums of waste removed from the south hot cell in December 2015 and January 2016 were transferred from the north hot cell to the shaft of the east vault tunnel on Monday, July 25th 2016 and subsequently to the east tunnel bunker in the vault tunnel on Tuesday, July 26th, 2016.The first drum (removed from the hot cell in December) containing both activated and contaminated metals was measured at 900 uSv/hr @ .5 m and the second drum (removed from the hot cell in January 2016) containing compressible items such as tank suits and plastic was measured at 150 uSv/hr @ .5 m.

Items were filed for storage/disposal with RPG under item number 1395 on the radioactive storage form.

Drums were transported to the vault tunnel using the 500 Mev Shield Flask (Drawing E-7097) with some minor modifications, namely a 1/4" thick Aluminum plate with four holes that line up with the holes in the bottom flange of the flask. This plate provided a bottom for the flask so that a drum could be contained within the flask during craning. Holes in the plate where countersunk for a 1/2" flat head bolt. Four bolts were also modified to accept 3/16 hair pins. 3 plates with clearances holes for the bolts were also manufactured to act as washers.

Procedure was as follows: With plate, washers and pins installed onto the flask, a modified drum dolly (5" spacers added to the casters) was placed inside the flask. Drum was craned into the flask using the automatic drum lifter. Flask with drum loaded was moved to the Meson Hall loading bay then craned to the B2 level of the Meson hall. Hair pins were pulled from the flask and the flask was then craned up leaving the drum (which was on the dolly firstly installed into the flask) and the plate. Drum on dolly was rolled to vault access shaft where it was craned off the modified dolly using the automatic drum lifter and down the access shaft to the vault tunnel level.  A second drum dolly was waiting at the bottom level and drum lowered onto it. Procedure was repeated for the second drum

Was vault was open , drums were wheeled into the vault tunnel and into a bunker that had been modified to accept these drums. Drums were lifted off dollies and put in place in bunker which had blocks installed to cover the entrance provided for installation.

 

Pictures can be found on docushare http://documents.triumf.ca/docushare/dsweb/View/Collection-18072  (collection 18072)

 

 

  1291   Monday, July 25, 2016, 08:15 Anders MjosConditioning StationRepairTM3 HV Test

 Monday, July 25, 2016, 08:14: Enabled staging for chiller

Monday, July 25, 2016, 08:33: Disabled staging. Fault 2. Staging does not work at this point.

Monday, July 25, 2016, 08:34: Running CP1 manually to cool down water.

Monday, July 25, 2016, 09:15: Bias current limiting at 150 V. Investigating short.

Monday, July 25, 2016, 09:51: EE cable was shorting the BIAS on the TCS side.

Monday, July 25, 2016, 09:57: BIAS/ / EL at 20 / 10 kV

Monday, July 25, 2016, 10:08: Sparking at 24 kV. Lowered to 22 kV

Monday, July 25, 2016, 10:44: BIAS at 25 kV

 Monday, July 25, 2016, 11:00: Sparking at 25.5 kV. Lowered to 25 kV

Monday, July 25, 2016, 12:03: 25.5 kV. No sparking for 10 min. Lower to 20 kV for lunch break.

Monday, July 25, 2016, 12:51: 26 kV

Monday, July 25, 2016, 13:00: Sparking at 27.3 kV. Lowered to 27 kV. EL at 14 kV

Monday, July 25, 2016, 13:04: More sparking. Lowered to 25 kV

Monday, July 25, 2016, 13:39: 25 kV

Monday, July 25, 2016, 14:21: A spark tripped the PS on water resistivity

Monday, July 25, 2016, 14:31: 25 kV

Monday, July 25, 2016, 15:34: ~20 sparks for the last 60 min

Monday, July 25, 2016, 16:28: ~10 sparks for the last 60 min. BIAS an EL off

Monday, July 25, 2016, 16:36: Stopped water cooling system.


Tuesday, July 26, 2016, 08:20: Started water cooling system.

Tuesday, July 26, 2016, 08:24: Ran CP1 manually for 3 min. Enabled staging.

Tuesday, July 26, 2016, 08:31: BIAS / EL at 25 / 0 kV

Tuesday, July 26, 2016, 08:39: EL float to 300 V. Set to 500 V

Tuesday, July 26, 2016, 08:45: BIAS to 25.5 kV

Tuesday, July 26, 2016, 09:07: 26 kV

Tuesday, July 26, 2016, 09:12: Lost contact with EPICS. Scheduled maintenance

Tuesday, July 26, 2016, 10:26: 6 sparks for the last 60 min

Tuesday, July 26, 2016, 10:33: BIAS to 27 kV

Tuesday, July 26, 2016, 10:43: Sparking at 27.8 kV. Lowered to 23 kV

Tuesday, July 26, 2016, 10:51: BIAS back at 27 kV. A spark tripped the BIAS on water resistivity

Tuesday, July 26, 2016, 11:08: BIAS at 27 kV

Tuesday, July 26, 2016, 11:22: BIAS at 28 kV

Tuesday, July 26, 2016, 11:42: BIAS at 27 kV after trip due to water resistivity (spark)

Tuesday, July 26, 2016, 12:00: BIAS / EL off for lunch break

Tuesday, July 26, 2016, 14:10: EL to 10 kV

Tuesday, July 26, 2016, 14:14: El to 20 kV

Tuesday, July 26, 2016, 14:20: EL to 25 kV

Tuesday, July 26, 2016, 14:27: First spark at 27.6 kV

Tuesday, July 26, 2016, 14:29: EL to 28 kV (BIAS at 0 kV)

Tuesday, July 26, 2016, 14:43: RGA on

Tuesday, July 26, 2016, 14:49: No sparking for 20 min

Tuesday, July 26, 2016, 16:02: No sparks for 90 min.

Tuesday, July 26, 2016, 16:06: PS and water off.


Wednesday, July 27, 2016, 09:14: BIAS at 24 kV

Wednesday, July 27, 2016, 09:19: Lowered to 20 kV due to sparking

Wednesday, July 27, 2016, 09:28: BIAS at 22 kV

Wednesday, July 27, 2016, 15:30: BIAS and water off


Thursday, July 28, 2016, 08:43: RGA off

Attachment 1: TM3_HV_conditioning_2016-07-25.docx
Attachment 2: TCS-2016-07-25_TM3_no_target.rga
Attachment 3: TCS-2016-07-26_TM3_no_target.rga
  1290   Friday, July 22, 2016, 10:57 David WangConditioning StationRepairTM3 TM3 has been moved and connected at TCS

I started vacuum system.

I started TCS water system. The chiller does not work properly still. But, It will not affect the TM3 HV conditioning.  HV cover is installed on TM3 in TH. The module is ready for HV conditioning.

  1289   Tuesday, July 19, 2016, 14:35 Aurelia LaxdalConditioning StationRepairTM3 TM3 leak checked at TCS

David Wang wrote:

Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good.  Helium pressure test on  TM3 water lines(except GE, HS, and Window) were done. Leak detector has no response at 0.0xE-9 atm.cc/sec. They are leak free.

Friday July 15: did HV tests (with no target installed and with the anode wire removed ). <br>

TM3 went up to 22.5kV. At this voltage it started sparking. The EL was kept at 1/2 with respect to the HV BIAS. <br>

Also HV tests were done while the EL was kept at zero V. In this case, the EL voltage was once in a while spiking  up (up to 4kV). <br>

During sparking we saw responses in the vacuum. Checked the Service Cap (with the HV Cover) in the Target Hall: we couldn't hear/see sparks there.  <br>

The HV was turned off in the same day, after 5:30pm.