Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 72 of 139  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Numberdown Subject
  117   Wednesday, June 06, 2012, 08:21 David WangITWStandard OperationTM1 TM1 disconnected in ITW

I disconnected TM1 in ITW yesterday morning.The general radioactive level in ITW over the TM top (300mm) is about 350 usv/hr. contacting level on TP1 and TP2 are 1.0-1.2 msv/hr. I took 0.22 msv dose .The module is moved to

south hot cell later and a shielding plug is put back to ITW. Everything is fine.

  134   Monday, June 25, 2012, 14:39 David WangITWStandard Operation  I moved 5 shielding blocks from ITE to ITW,

and set up ventilation for ITW. ITW is ready for taking proton beam now. All water interlock checks for ITW are done. The ITW water signals strength and frequency had been checked from electrical room, and everything is good.

  135   Tuesday, June 26, 2012, 14:10 David WangSouth Hot-CellRepairTM3 TM3 heat shield and window circuits leak check is done.

Chad and i did a leak check on TM3 heat shield and window circuits.Both circuits are pumped easily down to the bottom leak rate and base pressure on the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them   ( tested individually,2 seconds every time ) . There is no response on leakdetecor during 45 seconds waiting time. On window circuit there are 2 VCR joints. Chad sprayed helim on these joints(2seconds for each), and no response on leak detector. All joints  are double checked(sprayed twice on each of them). The result is they are leak tight.

  136   Tuesday, July 03, 2012, 10:50 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.

I disconnected TM4 in ITE this morning. The window circuit and heat shield circuit had been purged. The general field inside ITE is about 200usv/h.

  146   Friday, July 13, 2012, 16:33 Bevan MossCraneRepair  Crane has stopped working

In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I attempted to return the crane to its usual place I discovered that the crane no longer worked. Upon further inspection it appears that the PLC has lost power. I will follow up on this Monday morning. The crane is not supporting any load at this point.

  147   Monday, July 16, 2012, 11:55 Bevan MossCraneRepair  Crane has stopped working

Bevan Moss wrote:

In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I attempted to return the crane to its usual place I discovered that the crane no longer worked. Upon further inspection it appears that the PLC has lost power. I will follow up on this Monday morning. The crane is not supporting any load at this point.

 Turns out I am just not very observant. David had turned the main break to the crane off as a result when he turned it back on this morning the crane magically started working again.

  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm Trip

Today (Wednesday July 18th) at around 4:15 pm I was taking a small tour group from VECC into the Target Hall. In the process of discussing the mechanical design of the Target Modules and South Hot Cell turntable I inadvertently lifted the Aluminum Hatch Cover of the Hot Cell about 2 inches in an effort to explain something. This tripped the ventilation alarm before I realized what I was doing. I evacuated the visitors from the Target Hall, checked booties and gloves at the check station before having the visitors step over the boot box. I called operations and let them know what I had done. The Target Hall was locked out and is awaiting a survey for the morning of July 19th before work can proceed.

  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm Trip

Today (Wednesday July 18th) at around 4:15 pm I was taking a small tour group from VECC into the Target Hall. In the process of discussing the mechanical design of the Target Modules and South Hot Cell turntable I inadvertently lifted the Aluminum Hatch Cover of the Hot Cell about 2 inches in an effort to explain something. This tripped the ventilation alarm before I realized what I was doing. I evacuated the visitors from the Target Hall, checked booties and gloves at the check station before having the visitors step over the boot box. I called operations and let them know what I had done. The Target Hall was locked out and is awaiting a survey for the morning of July 19th before work can proceed.

  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .

  All water interlock checks for ITE had been done. The ITE water signals strength and frequency(Espcially on MSP circuit) had been checked from electrical room, and everything is good.

  159   Tuesday, August 07, 2012, 14:06 David WangITWRepair  ITW TP4S has been replaced

 I replaced ITW TP4S today as we scheduled. The working area is swiped and air sampled .Everything is fine.

The Series # of the old pump is 200927, and the new one is 600080. The E-fault 6081 which is related to the job will be closed.

  163   Monday, August 20, 2012, 12:28 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW,

I moved 5 shielding blocks from ITE  to ITW.ITW is configured to take proton beam now.

  164   Thursday, August 23, 2012, 07:34 David WangITWRepair  Replaced broken air lines on ITW HARP5B cylinder.

Prob guys replaced broken air lines on ITW HARP 5B Cylinder.Several shielding blocks had been moved out to make the cylinder accessible. After the replacement,the HARP5B works fine.All shield blocks had been moved back to original position. The job is done.

  165   Thursday, August 30, 2012, 13:57 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.

I disconnected TM 4 in ITE on AUG 29th morning.The vacuum lines stay untouched and they will be disconnected on SEP 04th.

  166   Friday, August 31, 2012, 12:10 chad fisherSouth Hot-CellMaintenance  Hot Cell Maitenance

Entered south hot cell Wednesday and replaced the pre-filter air filter as well as the front two light bulbs. Also removed two bags of compressible garbage, one bag of metal, and of course the bagged air filter (as Joe M. expressed as interest in havung it).

Inital checks found approximately 4000 cpm on the cell side of the temporary Al. panel used during the cell entry, 2000 cpm on the tacky mats layed out beside the work area but nothing on the floor under the plastic that had been layed down for the job.

 

Chad

  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced

ITE MSP water circuit flow wheel was replaced yesterday due to poor performance.

  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hall

Grant and I replaced the conditioning station broken  srcoll pump with a refurbished scroll pump which is supplied by vacuum group. The replaced pump is bagged and waiting for RPG further survey in target hall . The target hall is survey after the job, and everything is fine.

  199   Wednesday, October 31, 2012, 11:24 David WangITEStandard OperationTM4 Transfer five shielding blocks from ITW to ITE.

Bevan and I transferred five shielding blocks from ITW to ITE. ITE is ready for taking proton beam.

  200   Friday, November 02, 2012, 08:45 maicodallavalleSpent Target VaultMaintenance  F-308

The F-308 have been cleaned and serviced. There were three F-308's that came back with some contamination.#13, #15 and #19 were found to have contamination. They were decontaminated. All of the loose contamination was removed. There is still some fixed contamination. The levels of contamination are low enough to still be used for shipping spent targets. They have been moved to the north hot cell area and are ready for to be filled with spent targets. 

  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assay

This week six targets and the two source trays were assayed and surveyed from the storage vault. see attached PDF for details.

Attachment 1: Vault_Storage_November_2_2012.pdf
Vault_Storage_November_2_2012.pdf Vault_Storage_November_2_2012.pdf Vault_Storage_November_2_2012.pdf Vault_Storage_November_2_2012.pdf
  203   Tuesday, November 06, 2012, 11:34 chad fisherSouth Hot-CellStandard OperationTM1 Nb#7 Removal

Attached are pre-removal pictures of NB#7 and the inside face of the containment box cover before cleaning.

Attachment 1: IMG_0797[1].JPG
IMG_0797[1].JPG
Attachment 2: IMG_0798[1].JPG
IMG_0798[1].JPG
Attachment 3: IMG_0799[1].JPG
IMG_0799[1].JPG
ELOG V2.9.2-2455