  2377   Thursday, October 13, 2022, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#44Spent Target Move

 Spent target move done. The SiC#44 was moved from the north hot cell to the spent target vault. It was placed in pail#275 and placed in spot#4A. It was 42.6mSv/hr when removed from the north hot cell. See attached PDF for further details about the vault.

Please note we will only have two free spots in the vault at the start of the running period after the winter shutdown 2023.

Attachment 1: Target_Index_2022-10-13.pdf
Target_Index_2022-10-13.pdf
  2384   Thursday, November 03, 2022, 10:08 Travis CaveSpent Target VaultStandard Operation UC#39Spent Target Move

 The spent UC#39 target (pail #276) was removed from the north hot cell and place in the spent target vault (spot 4B) it was 14.4 mSv/hr when removed from the north hot cell. See attached PDF for further details. 

Attachment 1: Target_Index_2022-11-03.pdf
Target_Index_2022-11-03.pdf
  2404   Wednesday, January 11, 2023, 11:34 Travis CaveSpent Target VaultStandard Operation UC#40Spent Target Move

 UC#40 was moved from the north hot cell to the spent target vault. It was placed in pail #278 put in spot 1B and was 15.6 mSv/hr when removed from the north hot cell.

Also Ta#62 in pail #256 was moved from spot 7B back to 7A where it was originally located. This pail in the future will have to be repacked due to the fact it lacks a reinforcing disc in the bottom of the pail.

attached is vault details.

Attachment 1: Target_Index_2023-01-11.pdf
Target_Index_2023-01-11.pdf
  2415   Monday, January 30, 2023, 11:30 Travis CaveSpent Target VaultStandard Operation UC#41Spent Target Move

 The spent UC#41 was moved from the south hot cell to the spent target vault, placed in spot 1C, in pail #231. See attached PDF for details. 

Attachment 1: Target_Index_2023-01-30.pdf
Target_Index_2023-01-30.pdf
  2461   Wednesday, June 21, 2023, 09:51 Travis CaveSpent Target VaultStandard Operation TiC#5Spent Target Move

 TiC#5 moved to the spent target vault from the north hot cell. Placed in pail#279 in spot 3A, 40mSv/h when removed from NHC. See attached PDF for further details.

Attachment 1: Target_Index_2023-06-21.pdf
Target_Index_2023-06-21.pdf
  2478   Wednesday, August 23, 2023, 10:45 Travis CaveSpent Target VaultStandard Operation TiC#6Spent Target Move

 TiC #6 moved from north hot cell to spent target vault placed in pail #232 put in spot 6A and the field was 151mSv/hr when removed from the north hot cell. See attached PDF for details about spent target vault.

Attachment 1: Target_Index_2023-08-23.pdf
Target_Index_2023-08-23.pdf
  2487   Friday, September 01, 2023, 10:36 Adam NewsomeSpent Target VaultStandard Operation UCx#42Spent Target Move

UCx #42 moved from North Hot Cell to Storage Vault in Pail #282. Placed in slot 6B. Tray 6 is now full. Pail measured at 34.9 mSv/h at ~1 m upon removal from the hot cell. See attached updated spreadsheet. 

Attachment 1: Target_Index_2023-09-01.xlsm
  2494   Friday, October 06, 2023, 10:47 Travis CaveSpent Target VaultStandard Operation Nb#11Spent Target Move

 The spent Nb#11 target was removed from the south hot cell and place in the spent target vault. It was placed in pail #283 and place in spot 7B is was 65.7mSv/hr upon removal. see pdf for further vault details.

Attachment 1: Target_Index_2023-10-06.pdf
Target_Index_2023-10-06.pdf
  2504   Wednesday, November 22, 2023, 12:24 Adam NewsomeSpent Target VaultStandard Operation Ta#65Spent Target Move

The spent Ta#65 target was removed from the south hot cell and placed in the spent target vault. It was placed in pail #284 and placed in spot 2B. It was 41 mSv/hr at 1 m upon removal. Target index spreadsheet updated.

  2518   Wednesday, January 10, 2024, 11:24 Travis CaveSpent Target VaultStandard Operation Ta#66Spent Target Move

 The spent Ta#66 was moved from the south hot cell to the spent target vault, it was placed in pail#285 and placed in spot 5B of the vault. The target was 46.2mSv/hr when removed from the south hot cell. See the attached PDF for vault details.

Attachment 1: Target_Index_2023-01-10.pdf
Target_Index_2023-01-10.pdf
  2542   Wednesday, February 14, 2024, 11:32 Adam NewsomeSpent Target VaultStandard Operation UCx#43Spent Target Move

Spent target UCx#43 (pail 289) was moved from the South Hot Cell to the Storage Vault, placed in location 2A. Dose rate at 1m was approximately 22.6 mSv/hr.

Target index spreadsheet updated, attached.

Attachment 1: Target_Index_2024-02-14.xlsm
  2644   Thursday, July 18, 2024, 11:22 Travis CaveSpent Target VaultStandard Operation UC#45Spent Target Move

 The UC#45 target was moved from the south hot cell to the spent target vault. It was place in Pail#292 spot 1A of the vault, was 19.5mSv/hr. Also this pail contains the target material of UC#44. See attached PDF for more details.

Attachment 1: Target_Index_2024-07-18.pdf
Target_Index_2024-07-18.pdf
  2660   Friday, August 16, 2024, 08:47 Travis CaveSpent Target VaultStandard Operation SiC#46Spent Target Move

 SiC#46 (pail 293) was placed in the vault (spot 3B) on Wednesday the 14th of August. It was 111 mSv/hr when removed from the south hot cell. See attached PDF for details.

Attachment 1: Target_Index_2024-08-16.pdf
Target_Index_2024-08-16.pdf
  2669   Wednesday, August 21, 2024, 10:53 Travis CaveSpent Target VaultStandard Operation TiC#7Spent Target Move

 TIC#7 was placed in pail #294 and then moved from the south hot cell to the spent target vault spot 4B. It was 82.3mSv/hr when removed from the SHC. See attached PDF for details.

Attachment 1: Target_Index_2024-08-21.pdf
Target_Index_2024-08-21.pdf
  2670   Monday, August 26, 2024, 09:57 Travis CaveSpent Target VaultStandard Operation Nb#10Spent Target Move

 Nb#10 was placed in pail#295 and moved from the south hot cell to the spent target vault, spot 4A, it was 230uSv/hr when removed from the SHC. See attached PDF for vault details.

Attachment 1: Target_Index_2024-08-26.pdf
Target_Index_2024-08-26.pdf
  2707   Tuesday, October 15, 2024, 13:44 Travis CaveSpent Target VaultStandard Operation TiC#8 and Ta#67Spent Target Move

 On Friday October 11th TiC#8 and Ta#67 were place in the spent target vault in Tray 8. See attached PDF for details. 

Attachment 1: Target_Index_2024-10-15.pdf
Target_Index_2024-10-15.pdf
  2714   Friday, November 08, 2024, 10:39 Travis CaveSpent Target VaultStandard Operation TiC#9Spent Target Move

 TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details.

Attachment 1: Target_Index_2024-11-08.pdf
Target_Index_2024-11-08.pdf
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target Move
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault 
details.
Attachment 1: Target_Index_2025-01-13.pdf
Target_Index_2025-01-13.pdf
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move

 The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when removed from the south hot cell. See attached for vault details.

Attachment 1: Target_Index_2025-01-16.pdf
Target_Index_2025-01-16.pdf
  1029   Thursday, August 06, 2015, 10:26 Travis CaveSpent Target VaultStandard Operation  Spent Target Measurments and Assays

All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details.

Attachment 1: Vault_Storage_August_6_2015.pdf
Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf
ELOG V2.9.2-2455