853
|
Thursday, March 05, 2015, 07:17 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update | TH shut down jobs are processing as scheduled
this week. Discussed with Don, and we think
the jobs scheduled in next week should be |
6x |
|
893
|
Tuesday, April 21, 2015, 13:01 |
Grant Minor | ITW | Development | TM2 | | TM2 MK4 Optics Tray - banana plug bore modification (on bench) | The MK4 optics tray prepared for TM2 (as
per ITA6082) had an undersized bore for the
banana plug, making insertion of the plug |
|
|
902
|
Tuesday, April 28, 2015, 10:26 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | ITW target pit o-ring seal replacement. | Dan and I replaced ITW target pit o-ring
seal(.275DIA X42"ID). It is an annual
job before first beam to ITW. The old o-ring |
|
|
903
|
Tuesday, April 28, 2015, 11:09 |
Anders Mjos | ITW | Maintenance | | | Resistance measured of TGHT and TBHT lines to ITW | The new TBHT and TGHT power supplies were
brough up to high current; 350 A and 420
A respectively. The TGHT power supply was |
|
|
904
|
Tuesday, April 28, 2015, 11:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module move | TM#1 with UC#12 has been moved from the
conditioning station to the west target station. |
|
|
905
|
Tuesday, April 28, 2015, 17:17 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | TM1 has been connected in ITW. | TM1 has been connected in ITW. Five turbo
pumps have been started. The TM1 containment
box window line is capped on the service |
|
|
916
|
Friday, May 22, 2015, 15:44 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. I checked all ITW
water signals, and they are good. ITW |
|
|
953
|
Friday, June 19, 2015, 11:43 |
David Wang | ITW | Repair | TM1 | | ITW external water leak on dump circuit | There was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May |
6x |
|
969
|
Tuesday, June 30, 2015, 11:27 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module moved | TM#1 with UC#12 has been moved from the
west station to the south hot cell. |
|
|
971
|
Tuesday, June 30, 2015, 15:41 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW this morning. | TM1 was disconnected in ITW this
morning. The ITW was vented with argon last
night. |
|
|
1007
|
Tuesday, July 21, 2015, 12:38 |
David Wang | ITW | Repair | | | ITW external water leak on dump circuit has been fixed. | The leaking 1/8 NPT(M)-1/4NPT(F) adapter
on the ITW dump circuit is replaced. |
|
|
1057
|
Tuesday, September 01, 2015, 10:32 |
Travis Cave | ITW | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved from the
conditioning station to the west target
station. |
|
|
1058
|
Tuesday, September 01, 2015, 10:38 |
David Wang | ITW | Maintenance | TM2 | | ITW top tank flange clean up and r-ring replacement. | During last run, ITW dump circuit
had a water leak on an adaptor below the
pressure gauge. The top tank flange, slot, |
|
|
1059
|
Tuesday, September 01, 2015, 14:54 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connectec in ITW. | TM2 has been connected in ITW. During the
connection, Anders and I found the
TM2 high current cables used in ITE |
|
|
1060
|
Tuesday, September 01, 2015, 16:03 |
Grant Minor | ITW | Standard Operation | TM2 | ZrC #7 | Photos of TM2 Connection Procedure on Docushare 1Sept2015 | https://documents.triumf.ca/docushare/dsweb/View/Collection-15323 |
|
|
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. | Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
1098
|
Wednesday, October 14, 2015, 12:42 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been disconnected in ITW | Dan and I disconnected TM2 in ITW this
morning. |
|
|
1099
|
Wednesday, October 14, 2015, 12:44 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been moved from ITW to SHC | Bill and I remotely removed TM2 from ITW
to SHC. The move is smooth. |
|
|
1107
|
Tuesday, October 20, 2015, 10:18 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#32 | Module moved | TM#2 with SiC#32 has been moved from the
south hot cell to the west target station. |
|
|
1108
|
Tuesday, October 20, 2015, 12:49 |
Dan McDonald | ITW | Standard Operation | | SiC#32 | Tm2 hook up In ITW | Lower and disconnect TM2 from crane in
ITW, proceed with hooking up TM2 as per checklist
with Anders. Double check flow meters and |
|