ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  528   Friday, October 25, 2013, 10:26 Travis CaveITWStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has been moved from the
south hot cell to the west target station.
  
  531   Thursday, October 31, 2013, 10:36 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITE to ITW.I moved 5 shielding blocks from ITW to
ITE. The ITW  is configured to take
proton beam.
  
  563   Tuesday, December 03, 2013, 09:58 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITW to block storage area.I moved 5 shielding blocks from ITW to
block storage area.
  
  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks offThe blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level
  
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  619   Wednesday, March 12, 2014, 09:45 Travis CaveITWStandard OperationTM4no targetmodule moveTM#4 has been moved from the north west
silo to the west target station.
  
  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been startedI connected ITW  vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so
  
  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.With TM4 located in ITW, All air to vacuum
seals  on ITW primary and  secondary
vacuum vessels have been leak  checked
 7x 
  629   Monday, March 24, 2014, 12:01 Travis CaveITWStandard OperationTM4no targetmodule moveTM#4 has been moved from the west target
station to the south hot cell.
  
  636   Wednesday, April 02, 2014, 09:14 Travis CaveITWStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved to the west
target station.
  
  639   Friday, April 04, 2014, 16:59 Anders MjosITWDevelopment  Flow meters installed on Heat Shield and Coil water returnDavid W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected
 20140404_165829_1.jpg 
  651   Wednesday, April 16, 2014, 10:16 Anders MjosITWDevelopmentTM3Ta#42Flow meters installed on Heat Shield and Coil water return 

    
  
  666   Tuesday, May 27, 2014, 10:42 Travis CaveITWStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved from 
the west target station to the south hot
cell.
  
  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module moveTM#1 with UC#9 moved from the conditioning
station to west station.
  
  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on.
  
  682   Friday, June 13, 2014, 10:33 Anders MjosITWDevelopmentTM1UC#9Flow meter dataCoil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE
  
  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW
  
  702   Wednesday, July 16, 2014, 11:28 David WangITWStandard OperationTM1 TM1 had been dsiconnected in ITW.The TM1 and ITW  were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning.
  
  712   Wednesday, July 23, 2014, 13:36 David WangITWStandard OperationTM1 TM1 in ITW.  TM1 has been connected in ITW .
The new roughing pump replaced on last  Friday
works good. I started all turbo pumps in
  
  718   Monday, July 28, 2014, 17:26 Ron KuramotoITWRepair  ITW:IV5 Air leak repairAir leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room.  The
 DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg 