679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 moved from the conditioning
station to west station. |
|
|
680
|
Tuesday, June 10, 2014, 14:02 |
David Wang | ITW | Standard Operation | TM1 | UC9# | TM1 and ITW turbo pumps have been started. | TM1 has been connected to ITW. It is pumping
down in ITW with 6 turbo-pumps on. |
|
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|
|
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. ITW is configured to take
proton beam. Argon venting system for ITW |
|
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. | The TM1 and ITW were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning. |
|
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
|
718
|
Monday, July 28, 2014, 17:26 |
Ron Kuramoto | ITW | Repair | | | ITW:IV5 Air leak repair | Air leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room. The |
|
|
735
|
Wednesday, September 03, 2014, 10:50 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been disconnected in ITW. | TM1 has been disconnected in ITW. |
|
|
744
|
Wednesday, September 10, 2014, 07:12 |
David Wang | ITW | Repair | TM1 | | Removed ITW HS and COIL flow rate monitors. | Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits |
|
|
745
|
Wednesday, September 10, 2014, 08:52 |
Travis Cave | ITW | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
conditioning station to west target station. |
|
|
746
|
Wednesday, September 10, 2014, 11:47 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been connected in ITW. | TM1 has been connected in ITW. ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good |
|
|
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam |
|
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
|
782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. | TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to |
|
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
|
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. | Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
786
|
Thursday, November 13, 2014, 14:01 |
David Wang | ITW | Repair | TM1 | | I replaced flow wheel and coil on ITW MSP water flow sensor. | I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal |
|
|
846
|
Tuesday, February 17, 2015, 13:07 |
Anders Mjos | ITW | Development | | | Resistance measured of TGHT and TBHT lines to ITW | See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing |
|
|
848
|
Wednesday, February 25, 2015, 10:44 |
David Wang | ITW | Maintenance | | | 2015 shut dwon ITW water sensor coils and pedal wheels replacement | Dan and I replaced pedal wheels and coils
on ITW water flow sensors. It is a shut
down job we did every two years. See attachment |
|
|
849
|
Thursday, February 26, 2015, 09:22 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Mar 25th | TH shut down activities schedule from Feb
23th-March 25th. The schedule will be updated
each week. See attachment 1. |
|