  2804   Tuesday, May 13, 2025, 13:12 Frank SongMAARepair  Swap out the target hall alpha CAM. 
 
  
  2805   Tuesday, May 13, 2025, 13:13 Frank SongMAARepair  Swap out the target hall alpha CAM.AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3
  
  2806   Wednesday, May 14, 2025, 09:45 Frank Song5 Shielding BlocksStandard OperationTM4UC#48 IGLISshielding blocks transfer 5 shielding blocks have been transferred
to ITE from storage area, the WP#I2025-05-14-2.
  
  2807   Friday, May 16, 2025, 10:36 Frank SongITWStandard OperationTM2UC#49 Module Connection TM2 with UC#49 Febiad is connected
in ITW. Form attached.
 TM2_with_UC#49_connection_in_ITW_2025-05-15.pdf 
  2810   Tuesday, June 10, 2025, 11:50 Frank Song5 Shielding BlocksStandard Operation  shielding blocks transfer5 shielding blocks on ITE have been transferred
to ITW. 
  
  2813   Tuesday, June 17, 2025, 11:58 Frank SongITEStandard OperationTM4UC#48module disconnection TM4 with spent target UC#48 was disconnected
ang moved from ITE to NHC. see attachment
pls.
 TM4_with_spent_target_UC#48_disconnection_2025-06-17.pdf 
  2814   Tuesday, June 17, 2025, 12:59 Frank SongNorth Hot-CellStandard OperationTM4C#5electrical check/leak check TM4 with new target number C#5 installed
had been leak/electric checked on NHC flange
in TH. see pic attached with pls.
 TM4_electric_and_leak_check_after_C#5_installed_2025-06-17.pdf 
  2821   Tuesday, June 24, 2025, 15:05 Frank SongITEStandard OperationTM4C#5 SISModule Connection TM4 with new target number C#5 was
connected in ITE. see attachment pls.
 TM4_with_C#5_SIS_connection_in_ITE_2025-06-24.pdf 
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wiresThursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger
  
  2552   Thursday, March 21, 2024, 11:35 Ferran Boix PamiesITEDevelopment  Wiring of new thermocouple PLC module Thursday, March 21, 2024, 11:33 Three
channels are available now for thermocouple
readouts from the Target multipin. Wiring
  
  2503   Monday, November 20, 2023, 12:28 Eric LaheSouth Hot-CellMaintenance  Light Bulb Replacement - South Hot Cell roof lights 3 light bulbs replaced in the ISAC
South Hot Cell - North West light, South
west light, and South East light bulbs. Northeast
  
  2584   Tuesday, May 07, 2024, 12:39 Eric LaheSpent Target VaultRepair  ISAC Storage Vault Re-alignment 
 Testing_and_updates_to_storage_vault_2024-05-01.pdf 
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West StationWest target station is setup to use argon
for tank venting.  There is 1200 PSI
remaining on argon bottle in electrical room. 
  
  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of runMegger check values were low but still
within operational range.
 Nb#6_End_of_Run.JPG 
  123   Friday, June 08, 2012, 15:03 Don JacksonSouth Hot-CellStandard OperationTM1Ta38Electrical Check on new Ta38 at hot cellMegger checks were exceptionally high (good). 
Readings taken less than 2 hours after reading low
values from end of run on Nb#6.  Tests
 Ta38_New_Target.JPG 
  1667   Tuesday, December 19, 2017, 10:40 Don JacksonCraneMaintenance  Crane Power during winter break The power to the crane and controls
were turned off using the power switch in
the Crane Control room.  The main disconnect
  
  1993   Tuesday, October 01, 2019, 09:23 Don JacksonITEMaintenanceTM2ZrC #860KV Common Connections1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way. 
This should of had no impact on the ZrC run
 TM2_Wiring.jpg 
  46   Tuesday, November 01, 2011, 11:50 David WangConditioning StationStandard OperationTM4 TM4 leak test on conditioning station I did a leak check again on TM4 today.
This time, the leak detector pump to the
bottom on both base pressure(0.0xE-4 torr)
  
  60   Monday, November 21, 2011, 13:49 David WangConditioning StationStandard OperationTM1 TM1 full leak check in conditioning stationTM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium
  
  67   Monday, January 09, 2012, 14:44 David WangITEMaintenanceTM4 ITE and TM4 2012 winter shut down leak check is completed.I did a vacuum leak check on all ITE primary
vacuum vessel and secondary vessel.I also
did a helium pressure test(80psi ) on all
  