Tuesday, June 19, 2012, 10:35, Travis Cave, ITW, Standard Operation, TM1, Ta#38, module move
|
TM#1 with Ta#38 moved from the conditioning station to the west target station. Move went well. |
Tuesday, June 19, 2012, 16:18, David Wang, ITW, Standard Operation, TM1, Ta38, TM1connected in ITW
|
We moved TM1 to ITW today, I connected TM1 to ITW, and started all turbo pumps this afternoon. TP4s is very difficult to bring to 38 KRMP now. I have to use soft start model and tried twice to get this pump started (1.5 hours). This pump always had a difficult start time during the past 2-3 runs. I talked with Friedhelm and we think it should be replaced after this run. I will issue an e-fault on this pump and try to get a new pump from vacuum group. It will take 2 hours to change this pump. I could do this job with another person help. Or, vacuum group could do it. Don can schedule a time for this job before next run. Anyway, it should work fine for this run. The water interlock check related to TM1 is done. I will do the rest before blocks on. All TM1 water signals are strong and good. All vacuum gauge readings are good so far(below5.0xe-5 torr).
|
Monday, June 25, 2012, 14:39, David Wang, ITW, Standard Operation, , , I moved 5 shielding blocks from ITE to ITW,
|
and set up ventilation for ITW. ITW is ready for taking proton beam now. All water interlock checks for ITW are done. The ITW water signals strength and frequency had been checked from electrical room, and everything is good. |
Tuesday, July 31, 2012, 09:52, David Wang, ITW, Standard Operation, TM1, Ta38, TM1 disconnected in ITW
|
I disconnected TM1 in ITW. Heat shield line has been purged . |
Tuesday, August 07, 2012, 14:06, David Wang, ITW, Repair, , , ITW TP4S has been replaced
|
I replaced ITW TP4S today as we scheduled. The working area is swiped and air sampled .Everything is fine.
The Series # of the old pump is 200927, and the new one is 600080. The E-fault 6081 which is related to the job will be closed. |
Tuesday, August 14, 2012, 11:16, Travis Cave, ITW, Standard Operation, TM1, UCx#4, module move
|
TM#1 with UCx#4 has been moved from the conditioning station to the west target station move went well. |
Tuesday, August 14, 2012, 11:16, Travis Cave, ITW, Standard Operation, TM1, UCx#4, module move
|
TM#1 with UCx#4 moved from the conditioning to the west target station move went well. |
Tuesday, August 14, 2012, 14:27, David Wang, ITW, Standard Operation, TM1, UCx, TM1connection in ITW
|
Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far. |
Monday, August 20, 2012, 12:28, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITE to ITW,
|
I moved 5 shielding blocks from ITE to ITW.ITW is configured to take proton beam now. |
Thursday, August 23, 2012, 07:34, David Wang, ITW, Repair, , , Replaced broken air lines on ITW HARP5B cylinder.
|
Prob guys replaced broken air lines on ITW HARP 5B Cylinder.Several shielding blocks had been moved out to make the cylinder accessible. After the replacement,the HARP5B works fine.All shield blocks had been moved back to original position. The job is done. |
Wednesday, September 12, 2012, 11:59, David Wang, ITW, Standard Operation, TM1, UCx, TM1 disconnected in ITW
|
I removed 5 shielding blocks from ITW to block storage area, and disconnected TM1 in ITW. After UCx run, the radioactive level around the turbo pumps and primary vacuum lines are pretty high. This affect the general field inside the ITW pit around working area.i took 15 minuts to finish the job and i got 0.1msvr dose. the general field around my working area is about 350 usv/h. |
Tuesday, September 25, 2012, 10:34, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move
|
TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well. |
Tuesday, September 25, 2012, 14:33, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1connected in ITW
|
TM 1 is in ITW now. All connections are done. The turbo pumps had been started this afternoon. The vacuum looks good so far. The water interlock check which related to TM1 are done. They are good. All TM1 water signals are visually checked and they are strong. The rest interlock check ( MCR XT page) will be finished before shielding blocks moving. The MAA is locked and ITE is ready for proton beam. |
Tuesday, October 02, 2012, 11:47, David Wang, ITW, Standard Operation, TM1, Nb#7, I moved 5 shielding blocks from ITE to ITW.
|
5 shielding blocks have been moved from ITE to ITW. ITW is configured to take proton beam now. |
Tuesday, November 06, 2012, 11:06, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move
|
TM#1 with Nb#7 has been moved from the west target station to the south hot cell move went well. |
Tuesday, November 06, 2012, 12:08, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1 disconnected in ITW
|
Bevan and I disconnected TM1 in ITW this morning. The TM1 was moved to south hot cell later. |
Tuesday, November 13, 2012, 10:55, Travis Cave, ITW, Standard Operation, TM1, TiC#3, module move
|
TM#1 with TiC #3 moved from the conditioning station to the west target station, move went well. |
Wednesday, November 14, 2012, 10:57, David Wang, ITW, Standard Operation, TM1, , TM1connected in ITW
|
I connected TM1 in ITW yesterday. Everything is good so far. Travis was with me when i did the job. |
Wednesday, January 02, 2013, 12:11, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITW to block storage area
|
I moved 5 shielding blocks from ITW to block storage area for preparing the TM1 disconnection. Air sampled and swiped blocks and ITW and everything is fine.Fiona was with me all the time during the moving. |
Thursday, January 03, 2013, 10:05, David Wang, ITW, Standard Operation, TM1, , Disconnected TM1 in ITW.
|
TM1 has been disconnected in ITW. All water lines had been purged. Travis was with me during the job. |
|