254
|
Wednesday, March 06, 2013, 14:12 |
David Wang | ITW | Repair | | | ITW EXIT1 tank to module o-ring replacement | ITW
EXIT1 o-ring replacement is fininshed today.
The ITW EXIT 1 is back to ITW. The old o-ring |
|
295
|
Friday, April 12, 2013, 10:27 |
David Wang | ITW | Standard Operation | TM1 | | I reconnected TM1 to ITW. | TM1 has been reconnected in ITW. Water
interlock check for TM1 is done. |
|
296
|
Friday, April 12, 2013, 10:32 |
David Wang | ITW | Repair | TM1 | | ITW EXIT1 tank to module o-ring leak check. | I leak checked new installed ITW EXIT1
tank to module o-ring.No leak had been found
. Also ,TM1 primary vessel air to vacuum |
|
331
|
Tuesday, May 07, 2013, 12:07 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITE to ITW. | Water interlock check on ITW is done.
All water signals are strong on EL panel.
ITW is configured to take proton beam. |
|
376
|
Tuesday, June 11, 2013, 10:05 |
David Wang | ITW | Standard Operation | TM1 | | Disconnected TM1 in ITW. | Dan and I disconnected TM1 in ITW. |
|
396
|
Thursday, July 04, 2013, 11:37 |
David Wang | ITW | Standard Operation | TM1 | UCx | I reconnected TM1 to ITW. | I reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also. |
|
399
|
Tuesday, July 09, 2013, 14:26 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks had been transferred from ITE to ITW | 5 shielding blocks had been transferred
from ITE to ITW. The ITW is configured
to take proton beam. |
|
430
|
Tuesday, August 27, 2013, 14:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move | TM#1 with UCx#7 has been moved from the
south hot cell to the west target station. |
|
447
|
Wednesday, September 11, 2013, 09:35 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks have been moved to ITW | I moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is |
|
451
|
Thursday, September 12, 2013, 09:29 |
Travis Cave | ITW | Standard Operation | TM4 | SiC#29 | module move | TM#4 with SiC#29 has been moved to the
south hot cell move went well. |
|
508
|
Friday, October 18, 2013, 10:17 |
Bevan Moss | ITW | Repair | | | Paddle Wheel | Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent |
|
516
|
Tuesday, October 22, 2013, 11:18 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move | TM#1 with UC#7 has been moved from the
ITW to the south west silo. |
|
528
|
Friday, October 25, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#41 | module move | TM#4 with Ta#41 has been moved from the
south hot cell to the west target station. |
|
531
|
Thursday, October 31, 2013, 10:36 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITE to ITW. | I moved 5 shielding blocks from ITW to
ITE. The ITW is configured to take
proton beam. |
|
563
|
Tuesday, December 03, 2013, 09:58 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITW to block storage area. | I moved 5 shielding blocks from ITW to
block storage area. |
|
564
|
Tuesday, December 03, 2013, 10:35 |
Travis Cave | ITW | Standard Operation | | | fields above and in the target station with blocks off | The blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level |
|
567
|
Wednesday, December 04, 2013, 11:05 |
David Wang | ITW | Standard Operation | TM4 | Ta41# | I disconnected TM4 in ITW | I disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose. |
|
619
|
Wednesday, March 12, 2014, 09:45 |
Travis Cave | ITW | Standard Operation | TM4 | no target | module move | TM#4 has been moved from the north west
silo to the west target station. |
|
621
|
Thursday, March 13, 2014, 07:35 |
David Wang | ITW | Standard Operation | TM4 | | TM4 and ITW turbo pumps have been started | I connected ITW vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so |
|
625
|
Wednesday, March 19, 2014, 15:46 |
David Wang | ITW | Standard Operation | TM4 | | TM4 and ITE air to vacuum leak check and TM4 water lines helium test. | With TM4 located in ITW, All air to vacuum
seals on ITW primary and secondary
vacuum vessels have been leak checked |