ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2302
|
Thursday, February 10, 2022, 11:45 |
David Wang | Spent Target Vault | Standard Operation | | UCx#33. | Spent target UCx #33 has been repacked with a new pail and lid in NHC. |
Spent target UCx #33 has been repacked with a new pail and lid in NHC. Old pail #255. New pail # 267. Location: Vault slot 1C. it is an investigation job for a possible leak pail in vault. |
2078
|
Friday, March 06, 2020, 09:35 |
David Wang | Spent Target Vault | Standard Operation | | SiC #39 | Spent target SiC#39 removal from SHC to storage vault. |
Spent target SiC#39 is removed from SHC to storage vault at 4C in pail #227.The move is successful. Note:The small aluminum block holding wire on pail lid could be contaminated by SHC manipulator during the lid installation in SHC. |
1519
|
Tuesday, May 02, 2017, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Targets moved |
Five spent targets have been moved from the target storage vault to the mini vault in preparation for Thursdays loading of the F-308s. See attached for the list of targets in the mini vault, and the new status of the storage vault. |
Attachment 1: Mini_Vault_Storage_May_2_2017.pdf
|
|
Attachment 2: Vault_Storage_May_2_2017.pdf
|
|
1083
|
Friday, September 25, 2015, 08:21 |
Travis Cave | South Hot-Cell | Standard Operation | | UC#13 | Spent Target move |
The spent UC#13 target has been moved from the south hot cell to the ISAC spent target vault. It was placed pail #128 and in tray spot 1A. It was 21.5mSv/hr upon removal from the hot cell. See attached PDF for details. |
Attachment 1: Vault_Storage_September_24_2015.pdf
|
|
1141
|
Thursday, November 26, 2015, 08:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#46 | Spent Target move |
Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details. |
Attachment 1: Vault_Storage_November_26_2015.pdf
|
|
1177
|
Tuesday, March 22, 2016, 10:27 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#32 | Spent Target move |
SiC#32 has been moved from the south hot cell to the spent target storage. See attached PDF for details. |
Attachment 1: Vault_Storage_March_22_2016.pdf
|
|
1204
|
Monday, April 11, 2016, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#14 | Spent Target move |
The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details. |
Attachment 1: Vault_Storage_April_11_2016.pdf
|
|
1244
|
Tuesday, May 24, 2016, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#15 | Spent Target move |
Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_May_24_2016.pdf
|
|
1266
|
Wednesday, June 15, 2016, 09:39 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#47 | Spent Target move |
The spent Ta#47 target has been moved from the south hot cell to the spent target vault. It was placed in pail #137 in spot 4C of the vault. It was 114mSv/hr upon removal from the vault. |
Attachment 1: Vault_Storage_June_15_2016.pdf
|
|
1280
|
Monday, July 11, 2016, 10:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48 | Spent Target move |
The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr when measured at the hot cell. See the attached PDF for the latest results. |
Attachment 1: Vault_Storage_July_11_2016.pdf
|
|
1305
|
Thursday, August 04, 2016, 08:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#16 | Spent Target move |
The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details. |
Attachment 1: Vault_Storage_August_3_2016.pdf
|
|
1340
|
Thursday, August 25, 2016, 14:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#33 | Spent Target move |
SiC#33 was placed into pail #141 which in turn was placed into slot 2B of the vault. I was 295mS/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_August_25_2016.pdf
|
|
1362
|
Monday, September 26, 2016, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#17 | Spent Target move |
The spent UC#17 has been moved from the south hot cell to the spent target vault. See the attached pdf for details. |
Attachment 1: Vault_Storage_September_26_2016.pdf
|
|
1373
|
Thursday, October 20, 2016, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 | Spent Target move |
Ta#49 has been removed from the south hot cell and placed in the storage vault. It is in pail 146 and in spot 6A. |
1392
|
Monday, November 07, 2016, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34 | Spent Target move |
Spent SiC#34 was moved on the 3rd of November and placed in the spent target vault. See attached pdf for details. |
Attachment 1: Vault_Storage_November_3_2016.pdf
|
|
1407
|
Friday, November 25, 2016, 09:04 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#35 | Spent Target move |
On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details. |
Attachment 1: Vault_Storage_November_24_2016.pdf
|
|
1542
|
Thursday, May 18, 2017, 10:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#19 | Spent Target move |
The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See attached PDF for all vault details. |
Attachment 1: Vault_Storage_May_18_2017.pdf
|
|
1556
|
Monday, June 12, 2017, 13:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target move |
The spent Ta#51 target has been moved from the south hot cell to the spent target vault. It was placed in pail#149 and put in spot 8B of the vault. |
Attachment 1: Vault_Storage_June_12_2017.pdf
|
|
1608
|
Wednesday, August 30, 2017, 11:37 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#52 | Spent Target move |
The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details. |
Attachment 1: Vault_Storage_August_30_2017.pdf
|
|
1630
|
Thursday, September 28, 2017, 11:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#53 | Spent Target move |
The spent Ta#53 has been moved to the spent target vault. See attached file for details. |
Attachment 1: Vault_Storage_September_28_2017.pdf
|
|