768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. | I started TCS water system this morning
to check if the chillers work properly. |
|
|
1038
|
Friday, August 14, 2015, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | Started CS water package for TM2 | I finished the rest TM2 connections to
CS, and started CS cooling package. Everything
works fine so far. |
|
|
409
|
Wednesday, July 24, 2013, 17:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | Sic 29# | Started 3 turbo pumps on CS for TM4 | 3 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher |
|
|
449
|
Wednesday, September 11, 2013, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | Started 3 turbo pumps on CS for TM3 | TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far. |
|
|
2045
|
Thursday, January 09, 2020, 14:14 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Start of TCS roughing pump for TM3. | I started TCS roughing pump. TM3 TP1 and
TP2 will be started tomorrow morning. |
|
|
2072
|
Thursday, February 27, 2020, 10:37 |
David Wang | Safe Module Parking | Standard Operation | TM2 | | Start of SMP vacuum pump. | TM2 in SMP with old SiC #39 target on it.
SMP vacuum pump is started. |
|
|
2092
|
Wednesday, May 20, 2020, 13:08 |
David Wang | Cooling | Standard Operation | | | Start of HALCW sysytem | High active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and |
|
|
1680
|
Wednesday, January 17, 2018, 13:54 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Start TM3 turbo pumps at TCS. | TM3 turbo-pumps are started at TCS. We
will keep pumps running until next Wednesday. |
|
|
1671
|
Tuesday, January 02, 2018, 10:46 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Start High active water system. | High active water system was
checked before restart. A small water leak
on resin can supply valve was found. It is |
|
|
2268
|
Monday, November 15, 2021, 12:15 |
Adam Newsome | South Hot-Cell | Repair | | | Squeaking noise during turntable rotation - chain misalignment and improper tension | It was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present. |
|
|
2638
|
Wednesday, July 10, 2024, 10:44 |
Riley Sykes | South Hot-Cell | Maintenance | | | Spring idler install | New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions |
|
|
590
|
Monday, February 03, 2014, 14:45 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to mini storage and the F-308s to the Target Hall | Targets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The |
|
|
69
|
Thursday, January 12, 2012, 08:43 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to F-308s | All targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of |
|
|
1910
|
Monday, April 29, 2019, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Spent targets moved to mini vault. | The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front) |
|
|
1152
|
Wednesday, January 13, 2016, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35, Ta#39, SiC#27, UC#12, ThO#1 | Spent targets moved to mini storage. | Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February. |
|
|
802
|
Wednesday, November 26, 2014, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29 | Spent targets moved to mini storage | The following targets have been moved to
the mini storage from the target storage
vault: |
|
|
811
|
Thursday, December 04, 2014, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target placed in F-308. | Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall |
|
|
975
|
Thursday, July 02, 2015, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#12 | Spent target moved | UC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a |
|
|
1027
|
Thursday, July 30, 2015, 14:05 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31 | Spent target moved | SiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed |
|
|
1114
|
Friday, October 23, 2015, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC #7 | Spent target moved | The spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then |
|